The Virginia Stormwater Management Program is authorized by the ______ and ad
ws ws ws ws ws ws ws ws ws ws ws
ministered through the ______ - ans- ws ws ws ws ws
Virginia Stormwater Management Act, Virginia Stormwater Management Program Re
ws ws ws ws ws ws ws ws
gulation
VPDES Permit/ ws
Construction GP authorizes discharge of stormwater from construction activities that
ws ws ws ws ws ws ws ws ws ws
are - ans-greater than or equal to an acre
ws ws ws ws ws ws ws ws
The Stormwater Management Act requires the State Water Control Board to - ans-
ws ws ws ws ws ws ws ws ws ws ws ws
permit, regulate, and control stormwater runoff
ws ws ws ws ws
DEQ has ___ days to complete review of real or potential inter-
ws ws ws ws ws ws ws ws ws ws ws
jurisdictional impacts upon request - ans-90 ws ws ws ws ws
The Stormwater Management Act requires the following individuals to obtain and ma
ws ws ws ws ws ws ws ws ws ws ws
intain a certificate of competency - ans-
ws ws ws ws ws ws
staff of a stormwater program, anyone contracted by a VSMP authority, standard an
ws ws ws ws ws ws ws ws ws ws ws ws
d specification holders
ws ws
The dual certificate will expire three years from - ans-
ws ws ws ws ws ws ws ws ws
the latest date of the certificates
ws ws ws ws ws
SWM plan must be approved by ___ before land disturbance - ans-
ws ws ws ws ws ws ws ws ws ws ws
VSMP program authority
ws ws
The water quality criteria sets a site-
ws ws ws ws ws ws
based load limit of ____ of total phosphorus for new development - ans-0.41 lbs/
ws ws ws ws ws ws ws ws ws ws ws ws ws
acre/year
The phosphorus load limit uses the - ans-10% impervious cover
ws ws ws ws ws ws ws ws ws
Part II B and II C water quantity criteria addresses - ans-
ws ws ws ws ws ws ws ws ws ws ws
channel protection and flood protection
ws ws ws ws
Which two plans in the SWPPP must be approved? - ans-SWM plan, ESC plan
ws ws ws ws ws ws ws ws ws ws ws ws ws
,Does the SWM plan address runoff during or after construction? - ans-post-
ws ws ws ws ws ws ws ws ws ws ws
construction
What is the lower limit of the range of imperviousness that can result in stream degr
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws
adation? - ans-10% ws ws
What do land disturbing activities consist of? - ans-excavating, clearing, grading
ws ws ws ws ws ws ws ws ws ws
LDA threshold for the SWM Act and Regulation - ans-
ws ws ws ws ws ws ws ws ws
1 acre or 2500 square feet for Chesapeake Bay Preservation Act
ws ws ws ws ws ws ws ws ws ws
In situations where an initial exemption was applicable because LDAs were related t
ws ws ws ws ws ws ws ws ws ws ws ws
o emergency work, VSMP authority shall be advised of the disturbance within - ans-
ws ws ws ws ws ws ws ws ws ws ws ws ws
7 days of commencing the LDA and shall submit a permit application within 30 days
ws ws ws ws ws ws ws ws ws ws ws ws ws ws
of starting the land-disturbing activity
ws ws ws ws ws
Localities with MS4 - ans-must adopt and administer a stormwater program
ws ws ws ws ws ws ws ws ws ws
Localities without MS4 - ans- ws ws ws ws
may choose to administer a VSMP or have DEQ administer the program
ws ws ws ws ws ws ws ws ws ws ws
DEQ is responsible for enforcing the ____ while locality ____ are responsible for enf
ws ws ws ws ws ws ws ws ws ws ws ws ws
orcing local ordinances - ans-Construction GP, VSMP
ws ws ws ws ws ws
A locality VSMP authority must include enforcement authority and a schedule of civil
ws ws ws ws ws ws ws ws ws ws ws ws
penalties for enforcement actions in its local ordinance. The maximum penalty the a
ws ws ws ws ws ws ws ws ws ws ws ws ws
uthority may issue is - ans-$32,500 per violation per day
ws ws ws ws ws ws ws ws ws
Any civil penalty assessed by a court as a result of a summons issued by a locality
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws
VSMP authority must be paid - ans-into the locality's treasury
ws ws ws ws ws ws ws ws ws
Any person who violates..... shall be subject to a civil penalty not to exceed - ans-
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws
$32, 500 ws
Chesapeake Bay Preservation Areas that result in a land disturbance greater than or
ws ws ws ws ws ws ws ws ws ws ws ws
equal to ____ and less than ____ - ans-2,500 ft^2, 1 acre
ws ws ws ws ws ws ws ws ws ws ws ws
CBPA LDAs must have - ans-ws ws ws ws ws
approved E&SC plan, approved SWM plan, local approval to start land disturbance, l
ws ws ws ws ws ws ws ws ws ws ws ws
ong-term maintenance agreement, construction record drawings
ws ws ws ws ws
CBPA LDAs do not require - ans-
ws ws ws ws ws ws
Construction GP, Pollution prevention Plan, Additional control measures to address T
ws ws ws ws ws ws ws ws ws ws
MDL
, State entities and linear projects ___ submit a single set of standards and specificati
ws ws ws ws ws ws ws ws ws ws ws ws ws
ons to DEQ for approval, federal entities ____ - ans-must, may
ws ws ws ws ws ws ws ws ws ws
Name the 5 steps in order of the permitting process - ans-
ws ws ws ws ws ws ws ws ws ws ws
submittal of ESC plans and SWM plans, SWM plan review and approval, registration
ws ws ws ws ws ws ws ws ws ws ws ws
statement entry into Construction GP, Construction GP approved by DEQ, Locality
ws ws ws ws ws ws ws ws ws ws ws ws
VSMP authority approval to start land disturbance
ws ws ws ws ws ws
The locality VSMP authority has ___ days to determine the completeness of a storm
ws ws ws ws ws ws ws ws ws ws ws ws ws
water management plan and to notify the applicant of its determination - ans-15
ws ws ws ws ws ws ws ws ws ws ws ws
If the plan is complete and the applicant has been notified within 15 days of submis
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws
sion, the locality VSMP authority (plan reviewer) has ___ days from the time of notifi
ws ws ws ws ws ws ws ws ws ws ws ws ws ws
cation to review the plan - ans-60
ws ws ws ws ws ws
Operators of a single- ws ws ws
family detached residential structures that disturb equal to or greater than one acre
ws ws ws ws ws ws ws ws ws ws ws ws ws
of land are - ans-not required to submit a registration statement
ws ws ws ws ws ws ws ws ws ws
VSMP authority must keep project records, including approved SWM plans and regis
ws ws ws ws ws ws ws ws ws ws ws
tration statements, for ___ years after state permit termination or project completion
ws ws ws ws ws ws ws ws ws ws ws ws
- ans-3 years
ws ws
VSMP authority must keep post construction stormwater management facility inspecti
ws ws ws ws ws ws ws ws ws
on records for __ years from the date of inspection - ans-5
ws ws ws ws ws ws ws ws ws ws ws
DEQ is required to conduct a program review once every - ans-5 years
ws ws ws ws ws ws ws ws ws ws ws ws
A locality VSMP must be at least as stringent as what state permit? - ans-
ws ws ws ws ws ws ws ws ws ws ws ws ws ws
Construction GP ws
What plans must a locality's ordinance require to be submitted and approved? - ans-
ws ws ws ws ws ws ws ws ws ws ws ws ws
ESC plan, SWM plan ws ws ws
The Construction GP includes ___ different inspection frequencies - ans-2
ws ws ws ws ws ws ws ws ws
SWPPP inspection schedule if discharging to impaired waters - ans-
ws ws ws ws ws ws ws ws ws
at least once every 4 business days or at least once every 5 business days and no
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws
later than 24 hours following a measurable storm event
ws ws ws ws ws ws ws ws
SWPPP inspection schedule for standard inspections - ans-
ws ws ws ws ws ws ws
at least once every 5 business days, at least once every 10 business days and no l
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws
ater than 24 hours following a measurable storm event
ws ws ws ws ws ws ws ws
For all sites where areas have been temporarily stabilized or LDA have been suspe
ws ws ws ws ws ws ws ws ws ws ws ws ws
nded due to frozen conditions, inspections can be done - ans-once a month
ws ws ws ws ws ws ws ws ws ws ws ws
CORRECT ANSWERS
The Virginia Stormwater Management Program is authorized by the ______ and ad
ws ws ws ws ws ws ws ws ws ws ws
ministered through the ______ - ans- ws ws ws ws ws
Virginia Stormwater Management Act, Virginia Stormwater Management Program Re
ws ws ws ws ws ws ws ws
gulation
VPDES Permit/ ws
Construction GP authorizes discharge of stormwater from construction activities that
ws ws ws ws ws ws ws ws ws ws
are - ans-greater than or equal to an acre
ws ws ws ws ws ws ws ws
The Stormwater Management Act requires the State Water Control Board to - ans-
ws ws ws ws ws ws ws ws ws ws ws ws
permit, regulate, and control stormwater runoff
ws ws ws ws ws
DEQ has ___ days to complete review of real or potential inter-
ws ws ws ws ws ws ws ws ws ws ws
jurisdictional impacts upon request - ans-90 ws ws ws ws ws
The Stormwater Management Act requires the following individuals to obtain and ma
ws ws ws ws ws ws ws ws ws ws ws
intain a certificate of competency - ans-
ws ws ws ws ws ws
staff of a stormwater program, anyone contracted by a VSMP authority, standard an
ws ws ws ws ws ws ws ws ws ws ws ws
d specification holders
ws ws
The dual certificate will expire three years from - ans-
ws ws ws ws ws ws ws ws ws
the latest date of the certificates
ws ws ws ws ws
SWM plan must be approved by ___ before land disturbance - ans-
ws ws ws ws ws ws ws ws ws ws ws
VSMP program authority
ws ws
The water quality criteria sets a site-
ws ws ws ws ws ws
based load limit of ____ of total phosphorus for new development - ans-0.41 lbs/
ws ws ws ws ws ws ws ws ws ws ws ws ws
acre/year
The phosphorus load limit uses the - ans-10% impervious cover
ws ws ws ws ws ws ws ws ws
Part II B and II C water quantity criteria addresses - ans-
ws ws ws ws ws ws ws ws ws ws ws
channel protection and flood protection
ws ws ws ws
Which two plans in the SWPPP must be approved? - ans-SWM plan, ESC plan
ws ws ws ws ws ws ws ws ws ws ws ws ws
,Does the SWM plan address runoff during or after construction? - ans-post-
ws ws ws ws ws ws ws ws ws ws ws
construction
What is the lower limit of the range of imperviousness that can result in stream degr
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws
adation? - ans-10% ws ws
What do land disturbing activities consist of? - ans-excavating, clearing, grading
ws ws ws ws ws ws ws ws ws ws
LDA threshold for the SWM Act and Regulation - ans-
ws ws ws ws ws ws ws ws ws
1 acre or 2500 square feet for Chesapeake Bay Preservation Act
ws ws ws ws ws ws ws ws ws ws
In situations where an initial exemption was applicable because LDAs were related t
ws ws ws ws ws ws ws ws ws ws ws ws
o emergency work, VSMP authority shall be advised of the disturbance within - ans-
ws ws ws ws ws ws ws ws ws ws ws ws ws
7 days of commencing the LDA and shall submit a permit application within 30 days
ws ws ws ws ws ws ws ws ws ws ws ws ws ws
of starting the land-disturbing activity
ws ws ws ws ws
Localities with MS4 - ans-must adopt and administer a stormwater program
ws ws ws ws ws ws ws ws ws ws
Localities without MS4 - ans- ws ws ws ws
may choose to administer a VSMP or have DEQ administer the program
ws ws ws ws ws ws ws ws ws ws ws
DEQ is responsible for enforcing the ____ while locality ____ are responsible for enf
ws ws ws ws ws ws ws ws ws ws ws ws ws
orcing local ordinances - ans-Construction GP, VSMP
ws ws ws ws ws ws
A locality VSMP authority must include enforcement authority and a schedule of civil
ws ws ws ws ws ws ws ws ws ws ws ws
penalties for enforcement actions in its local ordinance. The maximum penalty the a
ws ws ws ws ws ws ws ws ws ws ws ws ws
uthority may issue is - ans-$32,500 per violation per day
ws ws ws ws ws ws ws ws ws
Any civil penalty assessed by a court as a result of a summons issued by a locality
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws
VSMP authority must be paid - ans-into the locality's treasury
ws ws ws ws ws ws ws ws ws
Any person who violates..... shall be subject to a civil penalty not to exceed - ans-
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws
$32, 500 ws
Chesapeake Bay Preservation Areas that result in a land disturbance greater than or
ws ws ws ws ws ws ws ws ws ws ws ws
equal to ____ and less than ____ - ans-2,500 ft^2, 1 acre
ws ws ws ws ws ws ws ws ws ws ws ws
CBPA LDAs must have - ans-ws ws ws ws ws
approved E&SC plan, approved SWM plan, local approval to start land disturbance, l
ws ws ws ws ws ws ws ws ws ws ws ws
ong-term maintenance agreement, construction record drawings
ws ws ws ws ws
CBPA LDAs do not require - ans-
ws ws ws ws ws ws
Construction GP, Pollution prevention Plan, Additional control measures to address T
ws ws ws ws ws ws ws ws ws ws
MDL
, State entities and linear projects ___ submit a single set of standards and specificati
ws ws ws ws ws ws ws ws ws ws ws ws ws
ons to DEQ for approval, federal entities ____ - ans-must, may
ws ws ws ws ws ws ws ws ws ws
Name the 5 steps in order of the permitting process - ans-
ws ws ws ws ws ws ws ws ws ws ws
submittal of ESC plans and SWM plans, SWM plan review and approval, registration
ws ws ws ws ws ws ws ws ws ws ws ws
statement entry into Construction GP, Construction GP approved by DEQ, Locality
ws ws ws ws ws ws ws ws ws ws ws ws
VSMP authority approval to start land disturbance
ws ws ws ws ws ws
The locality VSMP authority has ___ days to determine the completeness of a storm
ws ws ws ws ws ws ws ws ws ws ws ws ws
water management plan and to notify the applicant of its determination - ans-15
ws ws ws ws ws ws ws ws ws ws ws ws
If the plan is complete and the applicant has been notified within 15 days of submis
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws
sion, the locality VSMP authority (plan reviewer) has ___ days from the time of notifi
ws ws ws ws ws ws ws ws ws ws ws ws ws ws
cation to review the plan - ans-60
ws ws ws ws ws ws
Operators of a single- ws ws ws
family detached residential structures that disturb equal to or greater than one acre
ws ws ws ws ws ws ws ws ws ws ws ws ws
of land are - ans-not required to submit a registration statement
ws ws ws ws ws ws ws ws ws ws
VSMP authority must keep project records, including approved SWM plans and regis
ws ws ws ws ws ws ws ws ws ws ws
tration statements, for ___ years after state permit termination or project completion
ws ws ws ws ws ws ws ws ws ws ws ws
- ans-3 years
ws ws
VSMP authority must keep post construction stormwater management facility inspecti
ws ws ws ws ws ws ws ws ws
on records for __ years from the date of inspection - ans-5
ws ws ws ws ws ws ws ws ws ws ws
DEQ is required to conduct a program review once every - ans-5 years
ws ws ws ws ws ws ws ws ws ws ws ws
A locality VSMP must be at least as stringent as what state permit? - ans-
ws ws ws ws ws ws ws ws ws ws ws ws ws ws
Construction GP ws
What plans must a locality's ordinance require to be submitted and approved? - ans-
ws ws ws ws ws ws ws ws ws ws ws ws ws
ESC plan, SWM plan ws ws ws
The Construction GP includes ___ different inspection frequencies - ans-2
ws ws ws ws ws ws ws ws ws
SWPPP inspection schedule if discharging to impaired waters - ans-
ws ws ws ws ws ws ws ws ws
at least once every 4 business days or at least once every 5 business days and no
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws
later than 24 hours following a measurable storm event
ws ws ws ws ws ws ws ws
SWPPP inspection schedule for standard inspections - ans-
ws ws ws ws ws ws ws
at least once every 5 business days, at least once every 10 business days and no l
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws
ater than 24 hours following a measurable storm event
ws ws ws ws ws ws ws ws
For all sites where areas have been temporarily stabilized or LDA have been suspe
ws ws ws ws ws ws ws ws ws ws ws ws ws
nded due to frozen conditions, inspections can be done - ans-once a month