• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 41 pages
Exam (elaborations)

Nascla Accredited Practice Exam

Document preview thumbnail
Preview 4 out of 41 pages

NASCLA ACCREDITED PRACTICE EXAM

Content preview

NASCLA ACCREDITED PRACTICE EXAM

1. Which of the following best defines “retainage” in a
construction contract?
A. Penalty for late completion
B. Payment withheld until project completion
C. Payment for materials only
D. Bonus payment for early completion
Answer: B
Rationale: Retainage is withheld until substantial completion
to ensure contractor performance.


2. The critical path in CPM scheduling represents:
A. The path with the most float
B. The longest sequence of activities
C. The least important tasks
D. The lowest-cost activities
Answer: B
Rationale: Critical path tasks have zero float and determine
project duration.

,3. What is the primary purpose of a building permit?
A. To provide tax revenue
B. To ensure contractor certification
C. To ensure compliance with codes
D. To protect subcontractors
Answer: C
Rationale: Building permits ensure work complies with local
safety and construction codes.


4. Which bond guarantees completion of a project if the
contractor defaults?
A. Bid bond
B. License bond
C. Performance bond
D. Payment bond
Answer: C
Rationale: Performance bonds ensure contract fulfillment if
the contractor fails.


5. Which OSHA form is used to record work-related injuries
and illnesses?
A. OSHA 100
B. OSHA 301

,C. OSHA 300
D. OSHA 200
Answer: C
Rationale: OSHA 300 logs all recordable workplace injuries
and illnesses.


6. Overhead costs are best described as:
A. Direct job costs
B. Costs traceable to specific tasks
C. Company-wide operating costs
D. Labor-only expenses
Answer: C
Rationale: Overhead includes business expenses not tied to
specific jobs (rent, admin).


7. A contract that sets a fixed price regardless of cost changes
is a:
A. Time and materials contract
B. Unit-price contract
C. Cost-plus contract
D. Lump-sum contract
Answer: D

, Rationale: Lump-sum contracts lock in a fixed payment for the
entire project.


8. Which document lists materials, quantities, and installation
requirements?
A. Schedule of values
B. Specifications
C. Punch list
D. General conditions
Answer: B
Rationale: Specifications provide technical materials and
performance requirements.


9. An RFI is primarily used to:
A. Submit a bid
B. Request clarification
C. Report an injury
D. Change a schedule
Answer: B
Rationale: RFIs clarify ambiguous or incomplete contract
documents.


10. The purpose of a punch list is to:

Document information

Uploaded on
November 15, 2025
Number of pages
41
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$25.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
manjoeman2001
3.7
(3)
Sold
30
Followers
0
Items
557
Last sold
2 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions