Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

ICC Permit Technician 250+ Practice questions with 100%correct answers 2025/26 please leave a rating

Rating
-
Sold
-
Pages
115
Grade
A+
Uploaded on
14-11-2025
Written in
2025/2026

ICC Permit Technician 250+ Practice questions with 100%correct answers 2025/26The federal gov't - Answer: Who grants the authority to adopt codes? Performance & prescriptive - Answer: What are the two types of construction regulations? It prohibits alternative methods or materials - Answer: An adopted code may become invalid if _______. Specification - Answer: A written description that spells out the qualitative requirements for products, materials and workmanship including installation, testing & performance criteria for a proposed project is known as ________. Pictorial representations of construction materials - Answer: Architectural material

Show more Read less
Institution
ICC Permit
Course
ICC Permit

Content preview

Page 1 of 115



ICC Permit Technician 250+ Practice

questions with 100%correct answers

2025/26
The federal gov't - Answer: Who grants the authority to adopt codes?

Performance & prescriptive - Answer: What are the two types of construction
regulations?

It prohibits alternative methods or materials - Answer: An adopted code may become
invalid if _______.

Specification - Answer: A written description that spells out the qualitative requirements
for products, materials and workmanship including installation, testing & performance
criteria for a proposed project is known as ________.

Pictorial representations of construction materials - Answer: Architectural material
symbols are ______.

Alteration to an already approved mechanical installation - Answer: What type of work is
specifically allowed to be covered under an annual permit?

Waste and linen collection room in a Group I-2 occupancy containing bins able to hold
15 cubic feet of material - Answer: Which of the following incidental use areas must
always be separated from the main occupancy?

B - Answer: A building used for assembly purposes with an occupant load of less than
50 persons shall be considered a Group _____ occupancy.

Bedroom - Answer: Which of the following rooms would not be permitted to have a
ceiling height of 7 ft 0 inches throughout the room?

The code official - Answer: Who shall make interpretations of the IZC?

R-1 - Answer: A public park is permitted in a(n) _____ zoning district.

20 - Answer: The minimum required rear yard setback in an R-2a zone is ______.

,Page 2 of 115


6 months - Answer: Generally, a lot or structure occupied by a nonconforming use that
has been vacant for _____ must come into compliance with current zoning code before
the structure can be occupied

Inventory area limited to 25% of area assigned to home occupation - Answer: Which of
the following is not a condition of a home occupation?

Preemption - Answer: If a state adopts a state building code and prohibits the local
municipality from adopting its own building code, this is known as _____.

Administrative guidelines - Answer: Written rules established by a building department
that address applications not expressly resolved by the code are typically known as
_____.

Plans examination - Answer: One of the most common areas of potential liability in the
department of building safety is _____.

Qualified - Answer: The type of immunity usually applied to building safety personnel is
_____ immunity

Negligence - Answer: Conduct that was not intended to cause harm or injury, but
nonetheless did so, and also breached some duty of care imposed by the law is known
as _____.

A written set of regulations available for adoption by local jurisdictions - Answer: What is
a model code

protect the public health safety and welfare - Answer: The main purpose of building
codes is to

political influence over code regulations - Answer: Which is not a benefit of a state code

Final code changes are voted on by all interested parties - Answer: Which is not a
characteristic of the ICC code development process

Allows flexibility, provided the final outcome meets the code's intent - Answer: A
performance type code

Setting permit and plan review fees - Answer: Which of the following is not a service of
the ICC?

ICC - Answer: Which is not one of the three original model code orginizations?

A law - Answer: A building code is adopted by a jurisdiction as

,Page 3 of 115


Describes exactly what methods and materials are to be used during construction -
Answer: A prescriptive code

By industry orginizations - Answer: Standards are primarily developed

A building code - Answer: A legal document that regulates the construction of buildings
and structures

A referenced standard - Answer: An enforceable extension of the code

1994 - Answer: ICC was established as a nonprofit organization in

reference - Answer: The International codes can be adopted by

referencing the specific edition - Answer: A model code cannot be adopted without

International Code Council - Answer: ICC stands for

Qualifies the certified individual as an expert - Answer: Which is not a benefit of
becoming certified

Specific geographical cost data - Answer: All of the following are found in ICC
Evaluation Service report except

provides interpretations of misunderstood or confusing code requirements - Answer:
ICC's interpretation service

Final voting is done by the code officials responsible for enforcing the codes - Answer:
Which is a key characteristic of the code development process

Grant variances - Answer: Which is not under the authority of the building official

offset the cost of departmental operations - Answer: Permit and plan review fees are
collected to

prohibit specific construction methods and materials - Answer: Which is not typically a
function of the building department

Value of land - Answer: which is not a typical consideration when calculating a building
plan review fee

type of construction and occupancy group - Answer: ICC's building Data table is based
on

code violations have not been corrected - Answer: A building official may issue a stop
work notice when

, Page 4 of 115



Disagreeing with the code officials interpretation - Answer: A building permit may be
revoked for all of the following reasons except_____

Zone - Answer: An area or district in a city or town under special restrictions as to thte
types of buildings that may be erected is known as a

Establishes maximum speed regulations in residential districts - Answer: Which is not
generally considered a benefit of a zoning code

A map and the text - Answer: Two parts of a zoning ordinance are

seek an injunction from the courts - Answer: If a zoning request is denied by the zoning
official the citizen may

The sale of the nonconformin property to another owner - Answer: generally,
nonconforming use provisions in the zoning code do not prohibit

Variance - Answer: An easing of the terms of the zoning ordinance is known as a

Most stringent requirement - Answer: Typically, when there's a conflict between the
building code and the zoning ordinance, the ______ is enforced

1924 - Answer: The Standard Zoning Enabling Act was established by the US
Department of Commerce in

Hold a general election to adopt the zoning ordinance - Answer: Which is not generally
part of the 4 step process when draftig a zoning ordinance

Entertainment - Answer: All are typically considered one of the 3 major zoning districts
except

Uses that existed before the zoning ordinance was in effect - Answer: Zoning
ordinances must include provisions for nonconforming uses, which are

A license to build - Answer: A building permit is _____

Census bureau's copy - Answer: Which would not be considered one of the 6 typical
parts of a building permit

Verify compliance with minimum construction standards - Answer: One of the primary
reasons for requiring a building permit is to_____

Appeal the ruling to the jurisdiction's board of appeals - Answer: If the building official
rejects a permit application based on teir interpretation of the code, the applicant can
accept the ruling or_____

Written for

Institution
ICC Permit
Course
ICC Permit

Document information

Uploaded on
November 14, 2025
Number of pages
115
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NURSINGCLASS Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
24
Member since
11 months
Number of followers
0
Documents
450
Last sold
2 weeks ago
RESEARCHED TESTS BANKS

Hey You I know how frustrating it can get with all those assignments mate. Nursing Being my main profession line, I have essential guides that are A graded, I am a very friendly person so don\'t mind leaving an honest review

3.7

3 reviews

5
2
4
0
3
0
2
0
1
1

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions