Offshoring
Give this one a try later!
activity relocated to a contract manufacturer in another country
8 reserve flows(4.recalled products)
,Give this one a try later!
due to safety/quality defect that may be repaired
Total Cost
Give this one a try later!
cost of manufacturing
4 basic channel functions
Give this one a try later!
sorting, accumulating, allocating, assorting
Location(regional facilities)
Give this one a try later!
trade off quick consumer response for high productivity/inventory
Benefits of CPFR
Give this one a try later!
, reduces supply chain inventories and out-of-stocks
Location(central facility)
Give this one a try later!
trade off scale economies for lower responsiveness
Production operations provide
Give this one a try later!
"form utility" that make goods/services more attractive to create demand.
(includes changing appearance/composition of good)
Pull-Based system (ATO)
Give this one a try later!
used to coordinate production and distribution with actual customer
demand
8 reserve flows(1. failed products)
Give this one a try later!
Give this one a try later!
activity relocated to a contract manufacturer in another country
8 reserve flows(4.recalled products)
,Give this one a try later!
due to safety/quality defect that may be repaired
Total Cost
Give this one a try later!
cost of manufacturing
4 basic channel functions
Give this one a try later!
sorting, accumulating, allocating, assorting
Location(regional facilities)
Give this one a try later!
trade off quick consumer response for high productivity/inventory
Benefits of CPFR
Give this one a try later!
, reduces supply chain inventories and out-of-stocks
Location(central facility)
Give this one a try later!
trade off scale economies for lower responsiveness
Production operations provide
Give this one a try later!
"form utility" that make goods/services more attractive to create demand.
(includes changing appearance/composition of good)
Pull-Based system (ATO)
Give this one a try later!
used to coordinate production and distribution with actual customer
demand
8 reserve flows(1. failed products)
Give this one a try later!