Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 42 pages
Exam (elaborations)

U3 ICC Tank Tightness Testing Study Set – Complete Prep for U3 Exam (WY)

Document preview thumbnail
Preview 4 out of 42 pages

Prepare for the U3 ICC Tank Tightness Testing Exam with this comprehensive study set. Includes detailed practice questions, verified answers, and step-by-step explanations tailored for the Wyoming (WY) U3 exam. Ideal for students and professionals seeking reliable exam preparation.

Content preview

U3 ICC Tank Tightness Testing WY Study
Set for U3 Exam

Terms in this set (169)

Original
_______________ cathodic protection systems can influence other nearby
metallic structures that are not part of the protected system.
Impressed-current




___________________ and fittings are used to separate buried piping from
above ground piping and tanks from piping.
Dielectric bushings




On a steel tank without cathodic protection, if a coating is flawed, what happens
at the flaw?

a. Cathodic surface is increased

b. Current flow is increased from this area

c. Current flow is increased to this area

b. Current flow is increased from this area




On an impressed current cathodic protection system, the negative wire of the
rectifier is connected to the:
a. Anode

,b. Cathode
c. Drop tube
d. Dielectric union
b. Cathode




All are examples of acceptable release detection for tanks, except:
a. Impressed current cathodic protection
b. Automatic tank gauging
c. Statistical inventory reconciliation
d. Soil-vapor monitoring
a. Impressed current cathodic protection




When a tank is temporarily closed, the cathodic protection system:
a. Must be turned off
b. Must remain in operation
c. Should be removed
d. Operator can have it on or off.
b. Must remain in operation




When a steel tank is installed with a galvanic CP system attached, the tank
gauges are usually connected through a riser with a dielectric bushing. What is
the purpose of that?
a. To prevent static discharge
b. To minimize effects of noise
c. To electrically isolate the tank from the tank gauge
d. To prevent water intrusion in the tank
c. To electrically isolate the tank from the tank gauge




Factory-installed diectric coatings may include all of the following except:

,a . Asphalt
b. epoxies
c. Enamels
d. fiberglass-reinforced plastic
a . Asphalt




According to the EPA, Tank tightness test data must be maintained for:
a. 18 months
b. 3 years
c. 5 years
d. Until the next test is performed
d. Until the next test is performed




How long must records of UST system repairs be available on site?
a. 60 days
b. 1 year
c. 5 years
d. for the remaining lifetime of the UST system
d. for the remaining lifetime of the UST system




In the event of a release, what is the reporting requirement?
a. ICC licensed supervisor must report the leak within 24 hours
b. Owner/Operator must report the leak within 24 hours
c. Owner/Operator must report the leak within 18 hours
d. ICC licensed supervisor must report the leak within 18 hours
b. Owner/Operator must report the leak within 24 hours




At what size spill does it need to be reported?
a. 5 gallons

, b. 10 gallons
c. 15 gallons
d. 25 gallons
d. 25 gallons




Contamination of soils is encountered before removing a tank. The clean up must
be initiated by the:
a. Fire Marshal
b. Ecology inspector
c. Owner / operator of the UST system
d. Landlord
c. Owner / operator of the UST system




All are examples of overfill protection, except:
a. Vent restricting device
b. Drop tube with an automatic shut off device
c. Audible and visual alarm
d. Expandable bladder in manway
d. Expandable bladder in manway




Definition: An observation well is located:
a. Outside the tank excavation, but within 25 feet
b. Inside the tank excavation, extending 1' below the bottom of the tanks
c. Inside the tank excavation, no deeper than 15 feet
d. Outside the tank excavation until ground water is reached
b. Inside the tank excavation, extending 1' below the bottom of the tanks




A monitoring well lid is marked with a:
a. Black lid with a white equilateral triangle

Document information

Uploaded on
November 13, 2025
Number of pages
42
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$21.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
modeactiveb
4.5
(115)
Sold
841
Followers
2
Items
149
Last sold
1 week ago


Reviews from verified buyers




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions