Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 34 pages
Exam (elaborations)

QISP TEST Questions and Answers (100% Correct Answers) Already Graded A+

Document preview thumbnail
Preview 4 out of 34 pages

QISP TEST Questions and Answers (100% Correct Answers) Already Graded A+

Content preview

1
For Expert help and assignment solutions, +254707240657



QISP TEST Questions and Answers (100%
Correct Answers) Already Graded A+
Which of the following is a Discharger's responsibility for the Off-Site
Compliance Option agreement submittal schedule? [ANS:]
Discharger must certify and submit an updated SWPPP at least 7
days prior to initial agreement implementation.

Which drainage area has storm water runoff that is most likely to
© 2025 Assignment Expert




qualify as not being affected by the facility's industrial activity?
[ANS:] D1 - D1 is entirely non-industrial due to employee parking
only, landscaping and an administrative office, however this is
under the assumption there no commingled storm water
Guru01 - Stuvia




associated with industrial activity with this non-industrial area (e.g.
Grinding dust and metal fines from roof vents blow into D1).

By covering a small hazardous materials storage area located on
the west side of the Truck Parking area, the Discharger would
automatically qualify for No Exposure in that drainage area and
would not have to sample in D3. [ANS:] False - The facility would
not qualify since the trucks are still stored in this parking area and
are potentially a pollutant contributor, and the industrial roof
drainage also is in this drainage area. The facility is described to
have grinding dust and metal fines deposited on the roof from
roof vents, in D3. The presence of other industrial pollutants in this
drainage area prevent this from qualifying for no-exposure (e.g.
downspouts, pollutants from trucks and hazardous storage area).
In particular, the roof vents are a contributor of grinding dust and
metal fines.

Which scenario would best describe an NEC facility? [ANS:] All
operations are conducted within a building, truck trailers abut the

, 2
For Expert help and assignment solutions, +254707240657

enclosed loading bay (or dock), vehicles stored outside are well
maintained, all materials are stored indoors.

Which of the following would prevent a facility from qualifying for
a NEC: [ANS:] A clean, double-contained above ground storage
tank used to fuel vehicles is not physically separate from the
vehicle maintenance shop.

An NEC will be assigned an NEC ID by submitting which of the
following? [ANS:] Submittal and certification of the site map, NEC
form, NEC Checklist, and annual fee.
© 2025 Assignment Expert




In which of the following scenarios would a Discharger be
considered a New Discharger that would be required to obtain a
QISP to prepare necessary data and/or information to complete
Guru01 - Stuvia




the application for NOI coverage under the IGP? [ANS:] A newly
constructed industrial facility with a regulated SIC code that
discharges directly to a 303(d) listed impaired water body.

A Discharger's storm water flows off the industrial portion of a
facility into an open "conveyance". The conveyance combines
with flows from non-industrial areas and then leaves the property.
The flow does not discharge to an MS4 conveyance and the flow
commingles with discharges from facility B's roadways until it
ultimately discharges to a Water of the United States. Where is the
most representative discharge location for storm water associated
with industrial activities? [ANS:] The location where storm water
discharge leaves the industrial portion of facility A.

A New Discharger applying for NOI coverage is responsible for
identifying which of the following 303(d) listed impaired water
bodies? [ANS:] Any 303(d) listed impaired water body that the
facility directly discharges to and is listed in Appendix 3 with
impairments that have been identified as "more likely to be
associated with industrial storm water".

, 3
For Expert help and assignment solutions, +254707240657

When must a Discharger that had NOI coverage under the 97-03-
DWQ order and recertified under 2014-0057-DWQ order describe
any industrial pollutants related to impaired water bodies in the
SWPPP? [ANS:] By July 1, 2015.

All Dischargers applying after July 1, 2015 are considered New
Dischargers. [ANS:] False

A QISP assisting a New Discharger with discharges directly to a
303(d) listed impaired water body is required to evaluate the
facility for all of the constituents for which the Hydrologic Unit
© 2025 Assignment Expert




Code 10 watershed is impaired. [ANS:] False

A Discharger with an NOI is required to monitor for any identified
industrial pollutants in the pollutant source assessment, if the
Guru01 - Stuvia




watershed is impaired for that pollutant. [ANS:] False

A Discharger with an NEC is required to monitor for any identified
industrial pollutants in the pollutant source assessment, if the
watershed is impaired for that pollutant. [ANS:] False

A facility that does not discharge storm water to a Water of the
United States is required to monitor for any identified industrial
pollutants in the pollutant source assessment, if the watershed is
impaired for that pollutant. [ANS:] False

The 1977 SIC Code Manual published by the federal Office of
Management and Budget is the best resource for identifying
which facilities are required to obtain coverage under the IGP.
[ANS:] False

Which of the following research and development facilities would
be required to obtain coverage under the IGP? [ANS:] A facility
that conducts research and development and manufactures

, 4
For Expert help and assignment solutions, +254707240657

rockets under contract with the government. All of this is
conducted in the same building.

An international company manufactures car parts in China. The
manufacturer has 10 wholesale trade establishments in California.
The wholesale trade establishments should be classified as 3714.
[ANS:] False

When a new facility applying for NOI coverage is discharging to
an unimpaired creek that flows into an impaired reach of River Z,
a QISP must apply the tributary rule and evaluate all downstream
© 2025 Assignment Expert




impairments from a particular discharge. [ANS:] False

Which of the following would be considered an Advanced BMP?
[ANS:] BMPs that infiltrate, reuse, contain, retain, or reduce the
Guru01 - Stuvia




volume of storm water runoff.

The SWPPP must describe any spills or leaks of a significant quantity
that discharged in the previous ____ years. [ANS:] 5

Implementation of additional BMPs identified during the Annual
Evaluation must be completed within what time period? [ANS:] 90
days from the date of the Annual Evaluation.

The IGP allows for the use of alternative BMPs as an option for
which of the following pollutants? [ANS:] plastic materials

Which of the following would not be considered an Advanced
BMP? [ANS:] Diverting run-on and storm water away from
stockpiled materials.

Which of the following is a necessary component to meet the
Quality Assurance and Record Keeping requirements in the IGP
[ANS:] Training each member of the Pollution Prevention Team on

Document information

Uploaded on
November 7, 2025
Number of pages
34
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ScholarsAscend
3.7
(79)
Sold
469
Followers
39
Items
29397
Last sold
22 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions