CM 4221 MIDTERM STUDY GUIDE

Project Lifecycle - Answer -1) Establish the Need
2) Engineering & Design
3) Bidding & Award
4) Construction
5) Project Close-out
6) Operation and Maintenance

Project Lifecycle - Engineering and Design - Answer -- Hire primary design team
- develop project layout
- manage planning and scope

Environmental Impact Statement - Answer -"EIS" - submitted by the designer only if
needed

Scoping - Answer -Management Activity: One of the most important responsibilities of
the owner and sets design objectives for A/E

Letter of Intent (LOI) - Answer -When an owner issues a notice of award to the winning
contractor.

Notice to Proceed - Answer -Contractor can legally start work when the owner gives
this

Certificate of Occupancy - Answer -Granted once final inspections are passed

Project Close Out - Answer -Retainage is paid, wavier on liens once all parties have
been paid, and warranty period begins

Commissioning - Answer -Done throughout industrial projects but completed at project
close out on commercial projects. Basically a "check" that all appliances and other
materials meet the specs and work properly. Performed by independent agents (3rd
party). Focuses on MEP.

Warranty - Answer -Contractor warrants certain aspects from failure/repair during
project closeout. Usually a set time period.

O & M Manuals - Answer -Provided by contractor to owner that outlines the project and
includes info on performing services & repairs to project components.

As-built documentation - Answer -Records all actual info for future repairs during
project closeout

, Project delivery system - Answer -The contractual relationships between the project
team members. Determines when project team members are needed and when they
are procured. One of the first key risk management issues.

Delivery Methods - Answer -Design Bid Build, multi-prime contracting, CM at Risk,
Design build, Integrated Project Delivery.

Management Methods - Answer -Agency Construction Management & Program
Management

Procurement Methods - Answer -Low-Bid, Best Value, Qualifications Based

Design Bid Build - Answer -Owner has separate contracts with prime architect and
general contractor. Construction costs known prior to starting work, works well with
conventional construction projects, contractor absorbs most construction risks. Lack of
construction input during design, competitive atmosphere creates adversarial
relationships, lowest bid award creates marginal subcontractors, and unethical bidding
practices.

Multi-Prime Contracting - Answer -Owner has separate contracts with MULTIPLE
contractors AND a prime architect. More control of project by the owner (acts as GC),
ease in phasing the project and potential cost savings. Multiple contracts create many
phases to manage, gradual determination of final cost, tension over project leadership,
additional owner resources needed and safety can suffer.

CM at Risk Method - Answer -Owner has separate contracts with construction
manager/general contractor and architect/engineer. Construction input during design,
useful for complex and high risk projects (innovation), reduction is constructibility risks
and the owner has more design control. Difficulty in negotiating GMP, project costs not
known until late in engineering and design phase, no contract between construction firm
and designer and additional fees required for construction firm during design.

Design Build Method - Answer -Owner has one contract with design/builder firm.
Construction input during design, useful on large and complex projects, allows for
innovation and completes projects faster (fast-track projects). Lack of input by the owner
in design and construction, reduced owner control, total project cost may be unknown
until construction phase, less competition during bidding and potential to be difficult to
estimate.

Design Build firm - Answer -one company, joint venture, contractor led or designer led

Design Build Operate Maintain (DBOM) - Answer -Design builder provides O&M
services for a set period of time.

Build Operate Transfer (BOT) - Answer -Design Build Finance Operate Maintain and
commonly called Public-Private Partnerships

Document information

Uploaded on
November 7, 2025
Number of pages
14
Written in
2025/2026
Type
Other
Person
Unknown
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(365)
Sold
2154
Followers
1449
Items
60019
Last sold
7 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions