Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 44 pages
Exam (elaborations)

Chapter 7 - Aggregate Planning Full Study Guide | Yr. 2026/2027 -Supply Chain Management: Strategy, Planning, and Operation

Document preview thumbnail
Preview 4 out of 44 pages

Chapter 7 - Aggregate Planning Full Study Guide | Yr. 2026/2027 -Supply Chain Management: Strategy, Planning, and Operation

Content preview

Supply Chain Management: Strategy,
Planning, and Operation
Eighth Edition




Chapter 7

Planning Supply in a
Supply Chain:
Aggregate Planning




Copyright © 2026, 2019, 2016 Pearson Education, Inc. All Rights Reserved

,Aggregate Supply Planning and Its
Role in a Supply Chain
• Capacity has a cost and lead times are often long
• Aggregate supply planning:
– Given the demand forecast for each period in the
planning horizon, determine the production level,
inventory level, capacity level (internal and
outsourced), and any backlogs (unmet demand) for
each period that maximize the firm’s profit over the
planning horizon.
– How can a firm best use the facilities it has?



Copyright © 2026, 2019, 2016 Pearson Education, Inc. All Rights Reserved

,The Aggregate Supply Planning
Problem
• Given the demand forecast for each period in the planning
horizon, determine the production level, inventory level,
and the capacity level for each period that maximizes the
firm’s (supply chain’s) profit over the planning horizon
• Specify the planning horizon (typically 3–18 months)
• Specify the duration of each period
• Specify key information required to develop an aggregate
plan




Copyright © 2026, 2019, 2016 Pearson Education, Inc. All Rights Reserved

, Information Needed for an Aggregate
Supply Plan
• Aggregate demand forecast Ft for each Period t over T periods
• Production costs
– Labor costs, regular time ($/hr) and overtime ($/hr)
– Subcontracting costs ($/hr or $/unit)
– Cost of changing capacity—hiring or layoff ($/worker), adding or
reducing machine capacity ($/machine)
• Labor/machine hours required per unit
• Inventory holding cost ($/unit/period)
• Stockout or backlog cost ($/unit/period)
• Constraints—overtime, layoffs, capital available, stockouts, backlogs,
from suppliers
Copyright © 2026, 2019, 2016 Pearson Education, Inc. All Rights Reserved

Document information

Uploaded on
November 6, 2025
Number of pages
44
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Exampage
4.4
(2022)
Sold
6038
Followers
19
Items
1680
Last sold
3 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions