• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 35 pages
Exam (elaborations)

Certified Construction Manager (CCM) Exam Practice 100 Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

Document preview thumbnail
Preview 4 out of 35 pages

Certified Construction Manager (CCM) Exam Practice 100 Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

Content preview

Certified Construction Manager (CCM)
Exam Practice 100 Questions And Correct
Answers (Verified Answers) Plus Rationales
2026 Q&A | Instant Download Pdf



1. Which document defines the scope, schedule, and budget of a
construction project?
A. Change Order
B. Project Management Plan
C. Submittal Log
D. Bid Proposal
Rationale: The Project Management Plan outlines the scope,
schedule, and budget, serving as the primary guide for project
execution.

2. The primary role of a construction manager during the pre-
construction phase is to:
A. Perform structural inspections

, B. Develop cost estimates and schedules
C. Approve shop drawings
D. Issue building permits
Rationale: Pre-construction focuses on planning, including cost
estimating, scheduling, and value engineering.

3. Which type of contract places the greatest risk on the owner?
A. Lump Sum
B. Cost-Plus-Fee
C. Fixed-Price
D. Unit Price
Rationale: In a Cost-Plus-Fee contract, the owner assumes cost
overruns, while the contractor is reimbursed for actual costs plus a
fee.

4. A critical path in a schedule is:
A. The path with the most resources assigned
B. The sequence of tasks that determines the shortest project
duration
C. The longest list of non-critical tasks
D. Any path that is delayed
Rationale: The critical path identifies tasks that directly affect project
completion; delays on this path delay the project.

5. The most effective method to control project quality is to:
A. Rely on subcontractor quality

, B. Conduct inspections at the end of the project
C. Implement quality assurance and quality control procedures
throughout the project
D. Only review final deliverables
Rationale: Quality management requires continuous monitoring and
verification during construction, not just at the end.

6. Which insurance covers damages to the project site caused by the
contractor?
A. Professional Liability
B. Workers Compensation
C. Builder’s Risk Insurance
D. General Liability
Rationale: Builder’s Risk Insurance covers physical loss or damage to
a construction project while it is in progress.

7. In risk management, a contingency reserve is primarily used to:
A. Pay contractor salaries
B. Address unknown risks
C. Fund design changes
D. Reduce insurance premiums
Rationale: Contingency reserves are set aside to manage unforeseen
events or uncertainties.

8. Value engineering is best applied during:
A. Project closeout

, B. Construction only
C. Design development and pre-construction
D. Subcontractor bidding
Rationale: Value engineering seeks cost efficiency and function
optimization, ideally before construction begins.

9. The primary purpose of a change order is to:
A. Terminate a contract
B. Modify the contract scope, schedule, or price
C. Update insurance requirements
D. Reassign subcontractors
Rationale: Change orders formally adjust contract terms, such as
cost, scope, or schedule.

10. Which of the following best describes a Guaranteed Maximum
Price (GMP) contract?
A. Owner pays actual costs plus a fixed fee
B. Contractor assumes risk for costs exceeding the maximum price
C. Contractor is paid per unit installed
D. Owner bears all cost overruns
Rationale: In a GMP, the contractor guarantees the project will not
exceed a set price, transferring some cost risk to the contractor.

11. The main advantage of using Building Information Modeling
(BIM) is:
A. Reduces labor costs automatically

Document information

Uploaded on
November 6, 2025
Number of pages
35
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$22.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CertCrush
3.5
(25)
Sold
138
Followers
1
Items
6397
Last sold
19 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions