Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 93 pages
Exam (elaborations)

Washington State (WOSSA) Septic Installer Practice Exam 2026 | Updated Actual Exam with Verified Questions and Correct Solutions | Expert Verified | Guaranteed Pass | Latest Update

Document preview thumbnail
Preview 4 out of 93 pages

Washington State (WOSSA) Septic Installer Practice Exam 2026 | Updated Actual Exam with Verified Questions and Correct Solutions | Expert Verified | Guaranteed Pass | Latest Update

Content preview

Washington State (WOSSA) Septic Installer Practice Exam
2026 | Updated Actual Exam with Verified Questions and
Correct Solutions | Expert Verified | Guaranteed Pass |
Latest Update



1. ANSI Answer American National Standards Institute


2. BOD Answer biochemical oxygen demand, typically expressed in mg/L.


3. CBOD Answer Carbonaceous Biochemical Oxygen Demand, expressed in mg/L.


4. FC Answer Fecal Coliform, expressed in number of colonies 100/ml.


5. LOSS Answer large on-site sewage system


6. NSF Answer Nation Sanitation Foundation International


7. O&G Answer Oils and Grease, component of sewage typically originating from food stutts (animal fats of

mailto:https://www.stuvia.com/user/DREAMS

, vegetable oils) expressed in mg/L.


8. RS&G Answer Recommended Standards and Guidance


9. SSAS Answer a subsurface soil absorption system


10. TAC Answer Technical Advisory Committee established in WAC 247-272A-0400


11. TN Answer Total Nitrogen, expressed in mg/L.


12. TSS Answer Total Suspended Solids. A measure of the total suspended solids in a given solution, expressed in

mg/L.


13. USEPA Answer United States Environmental Protection Agency


14. Additive Answer a commercial product added to an on-site sewage system intended to attect the

performance or aesthetics of an on-site sewage system


15. Approved Answer Acceptable to the authority having jurisdiction. Local health oflcer or the department


16. BED Answer a soil dispersal component consisting of an excavation with a width greater than 3 feet


17. Building Sewer Answer that part of the horizontal piping of a drainage system which starts from the end

of the building drain and which receives the discharge of the building drain and conveys it to a public sewer, private
mailto:https://www.stuvia.com/user/DREAMS

, sewer, individual sewage disposal system or other point of disposal. It begins two feet outside the building wall and

conveys sewage from the building drain to the remaining portions of the on-site sewage system.


18. Cesspool Answer a covered hole or pit for receiving drainage or sewage, as from a house allowing liquid to see

into


the surronding rock or soil


19. Conforming System Answer an on-site sewage system of component meeting rules of Answer New

construction requirements


Approved and installed within previous requirements

Permitted by WAC-246-272A-0420


20. Cover Material Answer Soil placed over dispersal component, made up of mineral material with no greater

than


10% organic content. Cover may contain organic surface material, an organic landscaper to help reduce and contain

soil erosion.




mailto:https://www.stuvia.com/user/DREAMS

, 21. Cuts and Banks Answer a naturally occurring or artificially formed slope greater than one hundred

percent (forty-five degrees) and extending vertically at least five from the toe of the slope to top of the slope.


22. Department Answer Washington State Department of Health


23. Designer Answer Person who matches site and soil characteristics with approved components


24. Design Flow Answer Means the maximum volume of sewage a residence, structure or other facility is

estimated to generate in a twenty-four hour period. It incorporates both an operating capacity and a surge capacity

for the system during periodic heavy use events. The sizing and design of a on-site sewage system component is based

on the design flow.


25. Development Answer The creation of a residence, structure, facility, subdivision, area, or similar activ

resulting in


the production of sewage.


26. Disinfection Answer The process of destroying pathogens in sewage through the application of chlorination,

ultra-vi- olent light, or ozonation.


27. Distribution Technology Answer any arrangement of equipment and/or material that distributes

mailto:https://www.stuvia.com/user/DREAMS

Document information

Uploaded on
November 4, 2025
Number of pages
93
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DREAMS
4.7
(167)
Sold
244
Followers
5
Items
1077
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions