100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

BICSI-TECHNICIAN EXAM UPDATED THIS YEAR WITH 200 QUESTIONS AND CORRECT ANSWERS WITH JUST RELEASED

Beoordeling
-
Verkocht
-
Pagina's
33
Cijfer
A+
Geüpload op
03-11-2025
Geschreven in
2025/2026

BICSI-TECHNICIAN EXAM UPDATED THIS YEAR WITH 200 QUESTIONS AND CORRECT ANSWERS WITH JUST RELEASED

Instelling
BICSI-TECHNICIAN
Vak
BICSI-TECHNICIAN











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
BICSI-TECHNICIAN
Vak
BICSI-TECHNICIAN

Documentinformatie

Geüpload op
3 november 2025
Aantal pagina's
33
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Page 1 of 33



BICSI-TECHNICIAN EXAM UPDATED THIS YEAR WITH 200
QUESTIONS AND CORRECT ANSWERS WITH JUST
RELEASED

Which of the following is submitted to request clarification, supplemental information, or
approval of material substitutions?

RFI Form

M drawings indicate the size and route of:

Air Handler Units, Chilled Water Piping, Refrigerant Piping, HVAC System Ducts

Which of the following testers should be used for optical fiber identification?

Visual Fault Locator (VFL)

Project schedules should be updated at least ______________ once the project has started,

Weekly

The size and route of sanitary sewer lines are indicated in the
________ drawings.

P Drawing

Which of the following documents is used to track daily activities at the work site?

Project Log

What is the first step that you should take to verify the existing infrastructure before you
begin a retrofit?

Review the existing documentation with the customer.

1
SUCCESS!

,Page 2 of 33


A graphical representation of a building space, or object prepared with adequate detail to
convey design information in a manner to serve as a guide for construction.

A Drawing

A graphical representation of the electrical components of a construction project (e.g., power
distribution, lighting).

E Drawing

Abbreviation for fire protection drawings

FP Drawing

Abbreviation for mechanical drawings.

M Drawing

Abbreviation for plumbing drawings

P Drawing

Abbreviation for structural drawings

S Drawing

This document covers the requirements for the ICT systems team and lists all of the elements
of the installation.

Scope of Work (SOW)

Abbreviation for telecommunications, security, and audiovisual drawings

T Drawing

Layer of a telecommunication drawing that contains campus or site information such as
exterior pathways and interbuilding systems

2
SUCCESS!

,Page 3 of 33


T0 Layer

Layer of a telecommunication drawing that contains building information.

T1 Layer

Layer of a telecommunication drawing that contains serving zone information

T2 Layer

Layer of a telecommunication drawing that contains information about telecommunications
rooms.

T3 Layer

Layer of a telecommunication drawing that contains the detail drawings.

T4 Layer

Layer of a telecommunication drawing that contains schedules and spreadsheets.

T5 Layer

A list of the quantity and specific types of materials to be used on a project. This list also
should consider miscellaneous hardware.

BOM

Abbreviation for operations and maintenance

O&M

Any number of safety apparatuses worn or used by an individual (e.g., hard hat, protective
eyewear, gloves, clothing) that shield against possible injury while performing tasks.

PPE



3
SUCCESS!

, Page 4 of 33


A document that provides detailed statements and descriptions of the work content for the
project requirements.

SOW

What are the three basic locations for storing materials?

Company-controlled location, At the work site, With the distributor

True or False: After completing the site survey and formulating a project implementation plan,
the designated ICT systems installation PM should hold an initial meeting with the entire ICT
systems installation team.

True

Which meeting should be held after the initial meeting and should include the cabling
installation team and appropriate contractors?

Pre-Installation Meeting

The progress meeting should only occur once a month

False

What describes the manpower and mobilization in terms of responsibility, skill level,
certification level and head count?

Project Plan

The building official, electrical inspector, fire marshal, or other individuals or entities
responsible for interpretation and enforcement of local building and electrical codes.

Authority Having Jurisdiction (AHJ)

A private, nonprofit membership organization focused on meeting the standards and
conformity assessment requirements of its diverse constituency.

4
SUCCESS!

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Ressy JOHN HOPKINS
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
142
Lid sinds
2 jaar
Aantal volgers
30
Documenten
2408
Laatst verkocht
1 week geleden

3.5

30 beoordelingen

5
11
4
7
3
5
2
0
1
7

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen