• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 12 pages
Other

Gcor Practice Test Questions & Answers

Document preview thumbnail
Preview 2 out of 12 pages

GCOR PRACTICE TEST QUESTIONS & ANSWERS

Content preview

GCOR PRACTICE TEST QUESTIONS & ANSWERS

Dual Control Switch - Answer -A power operated switch, movable point frog, or derail
that can also be operated by hand.

Electric Switch Lock - Answer -An electrically controlled lock that restricts the use of a
hand operated switch or derail.

Absolute Signal - Answer -A block or interlocking signal without a number plate or
designated by an A marker.

Automatic Block System (ABS) - Answer -A series of consecutive blocks governed by
block signals, cab signals, or both. The signals are activated by a train or by certain
conditions that affect the block use.

Block - Answer -A length of track between consecutive block signals or between a
block signal and the end of block system limits.

Centralized Traffic Control (CTC) - Answer -A block system that uses block signal
indications to authorize train movements.

Control Operator - Answer -An employee assigned to operate a CTC or interlocking
control machine or authorized to grant track permits.

Control Point - Answer -The location of absolute signals controlled by a central operator
or a railroad identifiable point as defined in the Timetable.

Controlled Siding - Answer -A siding within CTC and Interlocking limits where a signal
indication authorizes the siding's use.

Controlled Signal - Answer -An absolute signal controlled by a control operator.

Controlled Track - Answer -Track upon which the railroad's operating rules require that
all movements of trains must be authorized by a train dispatcher or a control operator.

Crossover - Answer -A combination of two switches that connect two adjacent tracks.

Interlocking Signals - Answer -The fixed signals of an interlocking that govern trains
using interlocking limits.

Loaded Bulk Commodity Train - Answer -Loaded Unit Trains are defined as a train of
50 or more loaded cars in a block, each weighing 125 tons gross weight or more (bulk
commodities), such as coal, grain, soda ash, etc.

, Main Track - Answer -A track extending through yards and between stations that must
be occupied without authority or protection.

Non-Controlled Track - Answer -Track upon which trains are permitted by railroad rule
or special instruction to move without recieving authorization from train dispatcher or
control operator.

Off-Track Equipment - Answer -Machines that may be operated on the right of way foul
of track.

Proceed Indication - Answer -Any block signal indication that allows a train to proceed
without stopping.

Reverse Movement - Answer -A movement opposite the authorized direction.

Siding - Answer -A track connected to the main track and used for meeting or passing
trains. Locations of sidings are shown int he Timetable.

Special Instructions - Answer -Instructions contained in the Timetable or other
publications.

Station - Answer -A place designated by name in the Timetable station column.

Track Bulletin - Answer -A notice of coinditions affecting train movement. It may also
authorize movement against the current of traffic where rule 9.14 (movement witht he
Current of Traffic) is in effect.

Track Car - Answer -Any equipment which is designed to operate on the rail, other than
a Locomotive or railroad car.

Track Warrant Control (TWC) - Answer -A method to authorize train movements or
protect man or machines on a main track within specified limits in a territory designated
by the timeline.

Train - Answer -One or more engines coupled, with or without cars, displaying a
marker, and authorized to operate ont he main track.

Yard Limit - Answer -A portion of main track designated by yard limit signs and time
table special instructions or a track bulletin.

Any employee operating a radio must do the following - Answer -Before transmitting,
listen long enough to make sure the channel is not being used. Give the required
identification. Not proceed with further transmission until acknowledgement is received.

For Mobile Units - Answer -Name or initials of the railroad
Train name(number), enginenumber, or words that identify the precise mobile unit.

Document information

Uploaded on
November 1, 2025
Number of pages
12
Written in
2025/2026
Type
Other
Person
Unknown
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(367)
Sold
2191
Followers
1449
Items
61581
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions