• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

CMGT 1213 TEST 1 STUDY GUIDE QUESTIONS AND ANSWERS LATEST UPDATE

Document preview thumbnail
Preview 2 out of 6 pages

CMGT 1213 TEST 1 STUDY GUIDE QUESTIONS AND ANSWERS LATEST UPDATE Learning to Build - Answers Often, the decision of which building materials to use is based on economics. But what costs less at first may cost more throughout its life cycle through maintenance and replacement, or energy use Sustainability: - Answers sustainability may be defined as meeting the needs of the present generation without compromising the ability of future generations to meet their needs U.S. Green Building Council, - Answers buildings account for 30% to 40% of the world's energy use and associated greenhouse gas emissions LEED (Leadership in Energy and Environmental Design) - Answers standard for measuring the sustainability of construction The Work of the Design Professional: - Answers Designers develop the building plan for effective design and to comply with the legal constraints like zoning ordinances and building codes along with any other constraints such as under the American Disabilities Act (ADA), the Fair Housing Act, EPA, OSHA, and other laws and rules. Building Codes: - Answers International Residential Code (IRC) building code for 1 & 2 family dwellings, up to 3 stories** International Building Code (IBC) building code for all other buildings** National Electrical Code (NEC) - NFPA 70 International Plumbing Code (IPC) or Uniform Plumbing Code (UPC Zoning Ordinances - Answers Through local municipal government, building permits control land use, limit the size, type, and density of the structure that may be built Environmental Regulations - Answers Through the Environmental Protection Agency (EPA) Safety Regulations - Answers Through the Occupational Safety and Health Administration (OSHA) ASTM (American Society for Testing and Materials) - Answers establishes specifications for materials and methods. ANSI (American National Standards Institute) - Answers develops and certifies standards for construction products CSI (Construction Specification Institute) - Answers developed a comprehensive outline called MasterFormat for organizing information about construction materials and systems. It is organized into 50 primary divisions. Design/Bid/Build - Answers Owner separately hires design team and construction team.* Design/Build - Answers Owner hires one entity that provides both design and construction services. Turnkey - Answers Design/Build but includes financing. Single-Purpose Entity - Answers Owner designs, constructs, and finances project. Fixed fee (lump sum) - Answers Owner pays general contractor an agreed, fixed amount for work performed Cost plus a fee - Answers Owner pays general contractor costs plus a fee. equential construction - Answers each major phase in the design and construction of a building is completed before the next phase begins. Fast Track or Phased construction - Answers aims to reduce the time required to complete the project by overlapping the design and construction of various project parts. Construction Scheduling: - Answers Successful construction requires a detailed understanding of the tasks required and their interdependencies. Planning and scheduling involves analysis of these relationships between the different project activities using Gantt charts (bar charts) and Network Diagrams (flow charts) to understand which activities are bottlenecks to progress. These bottlenecks are considered critical activities. A critical path can be charted through the project where these critical activities are focused, to keep the project on schedule. Approval of Construction Documents: - Answers Approved plans and permit must be kept at the site of work. [IRC Ch#1 and IBC Ch#1] Work Exempt from Permit: - Answers -story accessory structures ≤ 200sq. ft. (IRC) (≤ 120 sq. ft. for IBC); fences ≤ 7 ft. high; retaining walls ≤ 4 ft. from bottom of footing to top of wall; water tanks on grade ≤ 5000 gallons; sidewalks; driveways; finish work like painting, cabinets, countertops, or flooring; decks ≤ 200 sq. ft. and ≤ 30 in. above grade and not servicing required exit door (IRC). [IRC Ch#1 and IBC Ch #1] Wind Design Criteria: - Answers In special wind hazard areas expecting over 110 mph, according

Content preview

CMGT 1213 TEST 1 STUDY GUIDE QUESTIONS AND ANSWERS LATEST UPDATE 2025-2026

Learning to Build - Answers Often, the decision of which building materials to use is based on
economics. But what

costs less at first may cost more throughout its life cycle through maintenance and
replacement, or energy use

Sustainability: - Answers sustainability may be defined as meeting the needs of the present
generation without compromising the ability of future generations to meet their needs

U.S. Green Building Council, - Answers buildings account for 30% to 40% of the world's energy
use and associated greenhouse gas emissions

LEED (Leadership in Energy and Environmental Design) - Answers standard for measuring the
sustainability of construction

The Work of the Design Professional: - Answers Designers develop the building plan for
effective design and to comply with the legal constraints like zoning ordinances and building
codes along with any other constraints such as under the American Disabilities Act (ADA), the
Fair Housing Act, EPA, OSHA, and other laws and rules.

Building Codes: - Answers International Residential Code (IRC) building code for 1 & 2 family
dwellings, up to 3 stories**



International Building Code (IBC) building code for all other buildings**



National Electrical Code (NEC) - NFPA 70



International Plumbing Code (IPC) or Uniform Plumbing Code (UPC

Zoning Ordinances - Answers Through local municipal government, building permits control
land use, limit the size, type, and density of the structure that may be built

Environmental Regulations - Answers Through the Environmental Protection Agency (EPA)

Safety Regulations - Answers Through the Occupational Safety and Health Administration
(OSHA)

ASTM (American Society for Testing and Materials) - Answers establishes specifications for
materials and methods.

, ANSI (American National Standards Institute) - Answers develops and certifies standards for
construction products

CSI (Construction Specification Institute) - Answers developed a comprehensive outline called
MasterFormat for

organizing information about construction materials and systems. It is organized into 50
primary divisions.

Design/Bid/Build - Answers Owner separately hires design team and construction team.*

Design/Build - Answers Owner hires one entity that provides both design and construction
services.

Turnkey - Answers Design/Build but includes financing.

Single-Purpose Entity - Answers Owner designs, constructs, and finances project.

Fixed fee (lump sum) - Answers Owner pays general contractor an agreed, fixed amount for
work performed

Cost plus a fee - Answers Owner pays general contractor costs plus a fee.

equential construction - Answers each major phase in the design and construction of a building
is completed before the next phase begins.

Fast Track or Phased construction - Answers aims to reduce the time required to complete the
project by overlapping the design and construction of various project parts.

Construction Scheduling: - Answers Successful construction requires a detailed understanding
of the tasks required and their interdependencies. Planning and scheduling involves analysis of
these relationships between the different project activities using Gantt charts (bar charts) and
Network Diagrams (flow charts) to understand which activities are bottlenecks to progress.
These bottlenecks are considered critical activities. A critical path can be charted through the
project where these critical activities are focused, to keep the project on schedule.

Approval of Construction Documents: - Answers Approved plans and permit must be kept at the
site of work. [IRC Ch#1

and IBC Ch#1]

Work Exempt from Permit: - Answers -story accessory structures ≤ 200sq. ft. (IRC) (≤ 120 sq. ft.
for IBC); fences ≤ 7 ft. high; retaining walls ≤ 4 ft. from bottom of footing to top of wall; water
tanks on grade ≤ 5000 gallons; sidewalks; driveways; finish work like painting, cabinets,
countertops, or flooring; decks ≤ 200 sq. ft. and ≤ 30 in. above grade and not servicing required
exit door (IRC). [IRC Ch#1 and IBC Ch #1]

Document information

Uploaded on
October 30, 2025
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
joshuawesonga22
3.5
(14)
Sold
130
Followers
2
Items
15395
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions