TPC 319 ELECTRICAL INSTALLATION EXAM:
2025/2026, WITH CORRECT/ACCURATE
ANSWERS
Is a specific training module or course offered by TPC Training Systems, a
company that provides technical skills training for industrial and
maintenance workforces.
Key topics covered in TPC 319
Site and equipment preparation
Foundation work
Rigging and moving equipment
Installation procedures
Wiring and connections
Troubleshooting
Safety
TPC 319 ELECTRICAL INSTALLATION
Before new equipment arrives at the plant, plans for installing it are made
by the... - correct answer.plant engineer
TPC 319 Electrical installation p.4
When pouring a concrete footing, you should hold the steel rods in
position with... - correct answer.tie wires
TPC 319 Electrical installation p.8
, The best materials for filling around a foundation are gravel and ... -
correct answer.ground concrete slabs
TPC 319 Electrical installation p.11
The type of bolt to anchor the equipment is usually specified by the... -
correct answer.equipment manufacturer
TPC 319 Electrical installation p.11
How long must new concrete sit before you can install equipment on it? -
correct answer.28 days
TPC 319 Electrical installation p.13
Retainers on the sides of horizontally reciprocating equipment keep it
from... - correct answer.walking
TPC 319 Electrical installation p.21
To isolate anchor bolts when mounting equipment on pads, surround the
bolts with... - correct answer.neoprene tubing
TPC 319 Electrical installation p.24
What type of wrench should you use for tightening anchor bolts? - correct
answer.torque
TPC 319 Electrical installation p.27
To drill anchor bolt holes larger than 1 1/2 in, you should use a... - correct
answer.core bit with a diamond or carbon tip
2025/2026, WITH CORRECT/ACCURATE
ANSWERS
Is a specific training module or course offered by TPC Training Systems, a
company that provides technical skills training for industrial and
maintenance workforces.
Key topics covered in TPC 319
Site and equipment preparation
Foundation work
Rigging and moving equipment
Installation procedures
Wiring and connections
Troubleshooting
Safety
TPC 319 ELECTRICAL INSTALLATION
Before new equipment arrives at the plant, plans for installing it are made
by the... - correct answer.plant engineer
TPC 319 Electrical installation p.4
When pouring a concrete footing, you should hold the steel rods in
position with... - correct answer.tie wires
TPC 319 Electrical installation p.8
, The best materials for filling around a foundation are gravel and ... -
correct answer.ground concrete slabs
TPC 319 Electrical installation p.11
The type of bolt to anchor the equipment is usually specified by the... -
correct answer.equipment manufacturer
TPC 319 Electrical installation p.11
How long must new concrete sit before you can install equipment on it? -
correct answer.28 days
TPC 319 Electrical installation p.13
Retainers on the sides of horizontally reciprocating equipment keep it
from... - correct answer.walking
TPC 319 Electrical installation p.21
To isolate anchor bolts when mounting equipment on pads, surround the
bolts with... - correct answer.neoprene tubing
TPC 319 Electrical installation p.24
What type of wrench should you use for tightening anchor bolts? - correct
answer.torque
TPC 319 Electrical installation p.27
To drill anchor bolt holes larger than 1 1/2 in, you should use a... - correct
answer.core bit with a diamond or carbon tip