MQM 227 CH 22 Questions and Answers 100% Correct
Which of the following is not a way in which a workcenter can be organized?
a. According to function in a workcenter configuration
b. According to function in an assembly line
c. By product in assembly line
d. As a group technology cell (GT cell)
e. By product in a flow operation —Answer: b. According to function in an assembly line
When work is scheduled in detail using the setup and run time required for each order, it is
called which of the following?
a. Infinite loading
b. Finite loading
c. Machine-limited
d. Labor-limited
e. Johnson's rule —Answer: b. Finite loading
A material requirements planning system is an example of which of the following scheduling
systems?
© 2025 All rights reserved
, a. Infinite loading, backward scheduling
b. Finite loading, backward scheduling
c. Infinite loading, forward scheduling
d. Finite loading, forward scheduling
e. None of these choices are correct —Answer: a. Infinite loading, backward scheduling
For a high-volume type of manufacturing, which of the following is the typical production
scheduling approach?
a. Finite backward scheduling
b. Finite forward scheduling
c. Infinite forward scheduling
d. Infinite backward scheduling
e. Assignment method —Answer: b. Finite forward scheduling
Which of the following is not an objective of workcenter scheduling?
a. Meeting due dates
b. Providing time for quality at the source
c. Minimizing setup time or cost
d. Minimizing work-in-process inventory
© 2025 All rights reserved
Which of the following is not a way in which a workcenter can be organized?
a. According to function in a workcenter configuration
b. According to function in an assembly line
c. By product in assembly line
d. As a group technology cell (GT cell)
e. By product in a flow operation —Answer: b. According to function in an assembly line
When work is scheduled in detail using the setup and run time required for each order, it is
called which of the following?
a. Infinite loading
b. Finite loading
c. Machine-limited
d. Labor-limited
e. Johnson's rule —Answer: b. Finite loading
A material requirements planning system is an example of which of the following scheduling
systems?
© 2025 All rights reserved
, a. Infinite loading, backward scheduling
b. Finite loading, backward scheduling
c. Infinite loading, forward scheduling
d. Finite loading, forward scheduling
e. None of these choices are correct —Answer: a. Infinite loading, backward scheduling
For a high-volume type of manufacturing, which of the following is the typical production
scheduling approach?
a. Finite backward scheduling
b. Finite forward scheduling
c. Infinite forward scheduling
d. Infinite backward scheduling
e. Assignment method —Answer: b. Finite forward scheduling
Which of the following is not an objective of workcenter scheduling?
a. Meeting due dates
b. Providing time for quality at the source
c. Minimizing setup time or cost
d. Minimizing work-in-process inventory