• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 229 pages
Exam (elaborations)

XACTIMATE 3 Exam with verified detailed solutions

Document preview thumbnail
Preview 4 out of 229 pages

XACTIMATE 3 Exam with verified detailed solutions

Content preview

XACTIMATE 3 Exam with verified detailed solutions ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Terms in this set (780) ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Original

HMR TRIMT ||\\|//||




Add-on for tearing out trim/base from tile/grout Includes: Additional labor cost to remove
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




trim/baseboard from tile/grout. ||\\|//|| ||\\|//||




Excludes: Re-grouting. ||\\|//||




Note: This item is an add on cost for removing trim/base when bottom or end is embedded
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




in tile and/or grout. Use with items HMR BASEB or HMR TRIM. The labor type used in
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




this item is a hazardous materials remediation technician, who typically performs work
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




relating to hazardous materials, which may include asbestos, lead, mold, etc. ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




HMR TRIM ||\\|//||




Tear out trim and bag for disposal Includes: Plastic bags and labor.
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Note: This item is intended for removal of extremely wet, non-salvageable, and/or
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




contaminated trim that needs to be bagged prior to disposal. The labor type used in this ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




item is a hazardous materials remediation technician, who typically performs work relating
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




to hazardous materials, which may include asbestos, lead, mold, etc.
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




HMR TACKS ||\\|//||




Tear out tackless strip and bag for disposal - Category 3 Includes: Plastic bags and labor.
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Note: This item is intended for removal of extremely wet, non-salvageable, and/or
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




contaminated tackless strip that needs to be bagged prior to disposal. A premium charge is ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||

,used when working with contaminated materials. The labor type used in this item is a
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




hazardous materials remediation technician, who typically performs work relating to ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




hazardous materials, which may include asbestos, lead, mold, etc. ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




HMR SSWR ||\\|//||




Temporary safety shower Includes: Safety shower, setup, and take down. ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Note: Priced as a one-time setup and take down. ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




HMR SBSWSH ||\\|//||




Soda blasting exposed framing w/sheathing - Walls (PER SF) Includes: Equipment, labor,
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




and material to soda blast exposed framing of walls.
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Note: This item is intended for soda blasting all faces of an open stud wall (with sheathing
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




on one side). Priced per square footage of wall area, not surface area blasted. Blasting in
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




confined spaces such as a crawl space or attic may require additional labor hours. This ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




item was created for ease of estimating and is based on several different models with
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




varying wall sizes; as such estimators may need to verify their specific pricing and make||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




adjustments as needed. The labor type used in this item is a hazardous materials ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




remediation technician, who typically performs work relating to hazardous materials, ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




which may include asbestos, lead, mold, etc. ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




HMR SBSW ||\\|//||




Soda blasting exposed framing - Walls (PER SF) Includes: Equipment, labor, and material
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




to soda blast exposed framing of walls.
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Note: This item is intended for soda blasting all faces of an open stud wall. Priced per
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




square footage of wall area, not surface area blasted. Blasting in confined spaces such as a
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




crawl space or attic may require additional labor hours. This item was created for ease of
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




estimating and is based on several different models with varying wall sizes; as such ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||

,estimators may need to verify their specific pricing and make adjustments as needed. The ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




labor type used in this item is a hazardous materials remediation technician, who typically
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




performs work relating to hazardous materials, which may include asbestos, lead, mold, ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




etc.




HMR SBSFSH ||\\|//||




Soda blasting exposed framing w/sheathing - Floor (PER SF) Includes: Equipment, labor,
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




and material to soda blast exposed framing of floor/ceiling.
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Note: This item is intended for soda blasting all faces of an open framed floor (with
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




sheathing on one side). Priced per square footage of floor area, not surface area blasted. ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Blasting in confined spaces such as a crawl space or attic may require additional labor ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




hours. This item was created for ease of estimating and is based on several different models
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




with varying floor sizes; as such estimators may need to verify their specific pricing and
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




make adjustments as needed. The labor type used in this item is a hazardous materials
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




remediation technician, who typically performs work relating to hazardous materials, ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




which may include asbestos, lead, mold, etc. ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




HMR SBSF ||\\|//||




Soda blasting exposed framing - Floor (PER SF) Includes: Equipment, labor, and material
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




to soda blast exposed framing of floor/ceiling.
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Note: This item is intended for soda blasting all faces of an open framed floor. Priced per
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




square footage of floor area, not surface area blasted. Blasting in confined spaces such as a
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




crawl space or attic may require additional labor hours. This item was created for ease of
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




estimating and is based on several different models with varying floor sizes; as such ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




estimators may need to verify their specific pricing and make adjustments as needed. The ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




labor type used in this item is a hazardous materials remediation technician, who typically
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




performs work relating to hazardous materials, which may include asbestos, lead, mold, ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




etc.

, HMR SBIWSH ||\\|//||




Dry ice blast exposed framing w/sheathing - Walls (PER SF) Includes: Equipment, labor,
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




and material to dry ice blast exposed framing of walls.
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Note: This item is intended for dry ice blasting all faces of an open stud wall (with
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




sheathing on one side). Priced per square footage of wall area, not surface area blasted. ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Blasting in confined spaces such as a crawl space or attic may require additional labor
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




hours. This item was created for ease of estimating and is based on several different models
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




with varying wall sizes; as such estimators may need to verify their specific pricing and
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




make adjustments as needed. The labor type used in this item is a hazardous materials
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




remediation technician, who typically performs work relating to hazardous materials, ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




which may include asbestos, lead, mold, etc.
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




HMR SBIW ||\\|//||




Dry ice blasting exposed framing - Walls (PER SF) Includes: Equipment, labor, and
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




material to dry ice blast exposed framing of walls. ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Note: This item is intended for dry ice blasting all faces of an open stud wall. Priced per
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




square footage of wall area, not surface area blasted. Blasting in confined spaces such as a
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




crawl space or attic may require additional labor hours. This item was created for ease of
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




estimating and is based on several different models with varying wall sizes; as such ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




estimators may need to verify their specific pricing and make adjustments as needed. The ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




labor type used in this item is a hazardous materials remediation technician, who typically
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




performs work relating to hazardous materials, which may include asbestos, lead, mold,||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




etc.




HMR SBIFSH ||\\|//||




Dry ice blast exposed framing w/sheathing - Floor (PER SF) Includes: Equipment, labor,
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




and material to dry ice blast exposed framing of floor/ceiling.
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Note: This item is intended for dry ice blasting all faces of an open framed floor (with
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




sheathing on one side). Priced per square footage of floor area, not surface area blasted. ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||




Blasting in confined spaces such as a crawl space or attic may require additional labor
||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//|| ||\\|//||

Document information

Uploaded on
October 24, 2025
Number of pages
229
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$29.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ruiz
3.2
(15)
Sold
106
Followers
3
Items
14175
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions