think of large outdoor equipment and where it should go on a site

dumpster (out of view, far from noses, not near quiet-room windows)



transformer (b/t muncipal service and in-building switch gear. could be on pole, on ground near

bld but 4' from the road, underground. ugly and sometimes buzzes, so out of view if possible. if

it is inside, a non-flammable coolant is needed.)



cooling tower (these are large, want to be out of view and they need access to the atmosphere so

they cannot be indoors. they are often near the chillers they serve, but can be remote if needed)



generator (loud, but if it is a backup, it will be rarely used and noise will not be issue. must

exhaust outside, so typ is outside placement.)

how do you decide what is the least expensive construction technique?

what you see most often is gen. the least expensive option.



OSB sheathing is more common, and less expensive, than plywood sheathing. - plywood is more

common as formwork, and less expensive than insulated concrete forms (ICFs), etc.

what is a right hand reverse-bevel door?

how can we shade windows in the northern hemisphere?

,South Facing - deciduous trees, horizontal louvers, light shelves, shade with other adjacent

building masses



East/West Facing - deciduous trees, vertical louvers, light shelves, shade with other adjacent

building masses



North Facing - shading not req.

shading lower southern sun req. longer horizontal overhangs

fact

shading higher southern sun req. _______________ (shorter or longer) horizontal

overhangs

SHORTER

position the vertical louvers on the east / west face so that the "cut-off" angle of each fin

shades direct sun.

the geometry of the fins vary relative to the position of the sun...

position the vertical louvers on the east / west face so that the "cut-off" angle of each fin

shades direct sun.

the geometry will vary based on specific location of the sun.

design a light shelf. draw it in section. try to get the proportions and materials correct.

A: height of light shelf should be such that is shades room occupants from sky view

,B: height of top light should be as high as possible (with A in mind)



C: extension of light shelf should be 1.4x b if light shelf faces due south (1.7 times b if light shelf

faces more than 20* to east/west of south)



x: to get light deep into the room (and therefore mitigate glare) sunlight should reflect off top of

light shelf and then off light-colored ceiling



R: because view to the sky is shaded, area close to the window have less glare

what is the difference b/t passive and active radon mitigation

passive system: seal the foundation cracks and where slab meeting wall. continuous airtight pipe

extends from below slab to above roof, allowing a easy path for underground radon to escape

without entering the house. no fan is needed.



active system: fan pulls air (and radon) through a contin. pipe from below the slab or crawlspace

to the atmosphere. typ. just needed for high levels of radon.

seismic - whent he shear wall is overly-perforated with apertures or does not continue

uninterrupted all the way from roof to foundation:

you will have issues of building collapsing.

what is the "soft story" problem?

, flexible first floor

discontinuity: indirect load path

heavy superstructure

but what is the PROBLEM with a "soft story"

the soft story disgrunts the load pathing during seismic event and collapses.

there are urbanistic and programmatic reasons why you want to design a tall or flexible

first floor, what is the solution to a soft story?

high first floors with slender columsn do not always bring about a soft story issue. the problem

happens when the columns are the primary resistors of lateral loads.



you can add more columns, add bracing, and add external buttresses.

calculating code stair width

you calc based on the floor with HIGHEST occupancy load.



OCCUPANT LOAD

1-500: 2 stairs

501-1000: 3 stairs

1000+:4 stairs



that floor width controls the entire stairs up and down.



<50 = min 36" width

Document information

Uploaded on
October 24, 2025
Number of pages
60
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$21.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KenAli
2.6
(18)
Sold
101
Followers
5
Items
21209
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions