with answers |\
VESCP - CORRECT ANSWERS ✔✔Virginia Erosion and Sediment
|\ |\ |\ |\ |\ |\ |\ |\
Control Program |\
- Administered by counties/cities (must), towns (may)
|\ |\ |\ |\ |\ |\
- MUST BE APPROVED
|\ |\ |\
Minimum Standard 1 - CORRECT ANSWERS ✔✔Stabilization
|\ |\ |\ |\ |\ |\
permanent or temporary soil stabilization shall be applied to
|\ |\ |\ |\ |\ |\ |\ |\ |\
denuded areas within seven days after final grade is reached on
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
any portion of the site; temporary soil stabilization shall be
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
applied within seven days to denuded areas that may not be at
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
final grade but will remain dormant for longer than 14 days;
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
permanent stabilization shall be applied to areas that are to be
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
left dormant for more than one year
|\ |\ |\ |\ |\ |\
Site NOT at Final Grade - CORRECT ANSWERS ✔✔- stabilize in 14
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
days
- temporarily seed
|\ |\
- mulch
|\
- permanently stabilize if dormant > 1 year
|\ |\ |\ |\ |\ |\ |\
,Site at Final Grade - CORRECT ANSWERS ✔✔- stabilize in 7 days
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
(recommended immediately) |\
- permanently or temporarily seed and mulch
|\ |\ |\ |\ |\ |\
- mulch/matting/straw
|\
Minimum Standard 2 - CORRECT ANSWERS ✔✔Stock Piles, Waste
|\ |\ |\ |\ |\ |\ |\ |\ |\
and Borrow Areas
|\ |\
during construction, soil stock piles and borrow areas shall be
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
stabilized or protected with sediment trapping measures
|\ |\ |\ |\ |\ |\
mulch prevents erosion by protecting the surface from raindrop
|\ |\ |\ |\ |\ |\ |\ |\ |\
impact and silt fence intercepts and detains from disturbed areas
|\ |\ |\ |\ |\ |\ |\ |\ |\
Minimum Standard 3 - CORRECT ANSWERS ✔✔Permanent
|\ |\ |\ |\ |\ |\ |\
Vegetation
permanent vegetation cover shall be established on denuded
|\ |\ |\ |\ |\ |\ |\ |\
areas not otherwise permanently stabilized (permanent
|\ |\ |\ |\ |\ |\
vegetation shall not be considered established until a ground
|\ |\ |\ |\ |\ |\ |\ |\ |\
cover is achieved that is uniform, mature enough to survive, and
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
will inhibit erosion *there is no % associated with this*)
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
reduce erosion and decrease sediment yield from disturbed area
|\ |\ |\ |\ |\ |\ |\ |\
this is the standard used to verify that a site is ready for release
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
of bonds or surety
|\ |\ |\
,Minimum Standard 4 - CORRECT ANSWERS ✔✔First-Step
|\ |\ |\ |\ |\ |\ |\
Measures
Sediment basins and traps, perimeter dikes, sediment barriers
|\ |\ |\ |\ |\ |\ |\ |\
and other measures intended to trap sediment shall be
|\ |\ |\ |\ |\ |\ |\ |\ |\
constructed as a first step in any land-disturbing activity and
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
shall be made functional before upslope land disturbance takes
|\ |\ |\ |\ |\ |\ |\ |\ |\
place
a certain amount of initial land disturbance may be required to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
provide access for equipment to install the perimeter controls,
|\ |\ |\ |\ |\ |\ |\ |\ |\
but site clearing and grading should be kept to a minimum until
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
the perimeter controls are in place
|\ |\ |\ |\ |\
intercepts and detains small amounts of sediment from disturbed
|\ |\ |\ |\ |\ |\ |\ |\
areas during construction operation to prevent sediment from
|\ |\ |\ |\ |\ |\ |\ |\ |\
leaving the site and decrease velocity of sheet flows and low-to-
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
moderate level channel flow |\ |\ |\
Perimeter Controls - CORRECT ANSWERS ✔✔assures that
|\ |\ |\ |\ |\ |\ |\
sediment does not leave the perimeter of the land-disturbing
|\ |\ |\ |\ |\ |\ |\ |\ |\
area once site clearing, grading, and construction commences
|\ |\ |\ |\ |\ |\ |\
Examples: silt fences, sediment traps, sediment basins,
|\ |\ |\ |\ |\ |\ |\
construction entrance, temporary diversions, diversions |\ |\ |\ |\
Minimum Standard 5 - CORRECT ANSWERS ✔✔Earthen Structure
|\ |\ |\ |\ |\ |\ |\ |\
Stabilization
, stabilization measures shall be applied to earthen structures such
|\ |\ |\ |\ |\ |\ |\ |\
as dams, dikes, and diversions immediately after installation
|\ |\ |\ |\ |\ |\ |\ |\
reduce erosion and sedimentation and reduce damage from
|\ |\ |\ |\ |\ |\ |\ |\
sediment and runoff to downstream or off-site areas
|\ |\ |\ |\ |\ |\ |\
Minimum Standard 6 - CORRECT ANSWERS ✔✔Traps and Basins
|\ |\ |\ |\ |\ |\ |\ |\
sediment traps and basins shall be designed and constructed
|\ |\ |\ |\ |\ |\ |\ |\ |\
based upon the total drainage area (not just disturbed area) to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
be served by the trap or basin
|\ |\ |\ |\ |\ |\
Sediment Traps - CORRECT ANSWERS ✔✔minimum storage
|\ |\ |\ |\ |\ |\ |\
capacity shall be 134 cubic yards per acre of drainage area and
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
shall only control drainage areas less than 3 acres
|\ |\ |\ |\ |\ |\ |\ |\
*stone outlet = trap* |\ |\ |\
Sediment Basins - CORRECT ANSWERS ✔✔surface runoff from
|\ |\ |\ |\ |\ |\ |\ |\
disturbed areas that is comprised of flow from drainage areas
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
greater than or equal to 3 acres shall be controlled by a basin;
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
minimum storage capacity of a sediment basin shall be 134 cubic
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
yards per acre of drainage area; the outfall system shall, at a
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
minimum, maintain the structural integrity of the basin during a
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
25-year storm of 24-hour duration; runoff coefficients used in
|\ |\ |\ |\ |\ |\ |\ |\ |\
runoff calculations shall correspond to a bare earth condition or
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
those conditions expected to exist while the sediment basin is
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
utilized.