• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

Erosion and Sediment Control Test 1 questions with answers

Document preview thumbnail
Preview 3 out of 19 pages

Erosion and Sediment Control Test 1 questions with answers

Content preview

Erosion and Sediment Control Test 1 |\ |\ |\ |\ |\ |\




questions with answers |\ |\




2-year, 24-hour storm even - CORRECT ANSWERS ✔✔maximum
|\ |\ |\ |\ |\ |\ |\ |\


24-hour precipitation event with a probable recurrence interval of
|\ |\ |\ |\ |\ |\ |\ |\


once in two years as defined by the National Weather Service
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


and Technical Paper No. 40, "Rainfall Frequency Atlas of the US"
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


May 1961 or equivalent regional rainfall probability information
|\ |\ |\ |\ |\ |\ |\ |\


developed there from |\ |\




24-hour Precipitation Event - CORRECT ANSWERS ✔✔amount of
|\ |\ |\ |\ |\ |\ |\ |\


precipitation which occurs within any 24 hour period |\ |\ |\ |\ |\ |\ |\




AEMA - CORRECT ANSWERS ✔✔Alabama Environmental
|\ |\ |\ |\ |\ |\


Management Act, Code of Alabama 1975 |\ |\ |\ |\ |\




Alabama Handbook - CORRECT ANSWERS ✔✔current edition of
|\ |\ |\ |\ |\ |\ |\ |\


the Alabama Handbook for Erosion Control, Sediment Control,
|\ |\ |\ |\ |\ |\ |\ |\


and Stormwater Management on Construction Sites and Urban
|\ |\ |\ |\ |\ |\ |\ |\


Areas published by the Alabama Soil and Water Conservation
|\ |\ |\ |\ |\ |\ |\ |\ |\


Committee (ASWCC) at the time permit coverage is obtained
|\ |\ |\ |\ |\ |\ |\ |\




ADEM - CORRECT ANSWERS ✔✔Alabama Department of
|\ |\ |\ |\ |\ |\ |\


Environmental Management |\




Agricultural Practices - CORRECT ANSWERS ✔✔practices |\ |\ |\ |\ |\ |\


commensurate with the size of the farming operation that are |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


implemented in a manner that meet or exceed the Natural |\ |\ |\ |\ |\ |\ |\ |\ |\ |\

,Resources Conservation Service technical standards and
|\ |\ |\ |\ |\ |\


guidelines, including but not limited to farm ponds that are
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


constructed for the primary purpose of irrigation and/or watering
|\ |\ |\ |\ |\ |\ |\ |\ |\


livestock, terraces, grassed waterways, vegetative filter strips,
|\ |\ |\ |\ |\ |\ |\


cropland grade stabilized measures drainage tiles, underground
|\ |\ |\ |\ |\ |\ |\


outlets, land leveling, dike/diversion structures and other grade
|\ |\ |\ |\ |\ |\ |\ |\


stabilized structures |\




AWPCA - CORRECT ANSWERS ✔✔Alabama Water Pollution Control
|\ |\ |\ |\ |\ |\ |\


Act
|\




Best Management Practices (BMPs) - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\


✔✔implementation and continued maintenance of appropriate |\ |\ |\ |\ |\ |\


structural and non-structural practices and management
|\ |\ |\ |\ |\ |\


strategies to prevent and minimize the introduction of pollutants
|\ |\ |\ |\ |\ |\ |\ |\ |\


to stormwater and to treat stormwater to remove pollutants prior
|\ |\ |\ |\ |\ |\ |\ |\ |\


to discharge
|\ |\




Borrow Area "Pit" - CORRECT ANSWERS ✔✔the activity of
|\ |\ |\ |\ |\ |\ |\ |\ |\


removing material (soil, gravel, sand) from one area to use in
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


another area. For the purposes of this
|\ |\ |\ |\ |\ |\




permit, this activity is solely in conjunction with the project
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


requesting permit coverage and the material is not to be sold for
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


profit. The borrow |\ |\




area and associated activity shall be located within a two-mile
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


radius of the project requesting permit coverage to be considered
|\ |\ |\ |\ |\ |\ |\ |\ |\


as part of the
|\ |\ |\ |\




project and will open and close with the project requesting permit
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


coverage
|\

, Chronic and Catastrophic Precipitation - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\


✔✔precipitation events which may result in failure of the properly |\ |\ |\ |\ |\ |\ |\ |\ |\


designed, located, implemented,
|\ |\ |\




and maintained BMPs or other structure/practices required by this
|\ |\ |\ |\ |\ |\ |\ |\


permit. Catastrophic precipitation conditions means any single
|\ |\ |\ |\ |\ |\ |\ |\


event of |\




significant total volume, or of increased intensity and shortened
|\ |\ |\ |\ |\ |\ |\ |\ |\


duration, that exceeds normally expected or predicted
|\ |\ |\ |\ |\ |\ |\


precipitation over the time |\ |\ |\




period that the disturbance is planned or is ongoing, as
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


determined by the Department. Catastrophic conditions could
|\ |\ |\ |\ |\ |\ |\


also include tornadoes,
|\ |\




hurricanes, or other climatic conditions which could cause failure
|\ |\ |\ |\ |\ |\ |\ |\ |\


due to winds or mechanical damage. Chronic precipitation is also
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


that series of
|\ |\




wet-weather conditions over a limited time-period which does not |\ |\ |\ |\ |\ |\ |\ |\


provide any opportunity for emergency maintenance,
|\ |\ |\ |\ |\ |\ |\


reinstallation, and |\




corrective actions and which equals or exceeds the volume of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


normally expected or predicted precipitation for the time period
|\ |\ |\ |\ |\ |\ |\ |\ |\


that the disturbance
|\ |\




is planned or is ongoing
|\ |\ |\ |\




Common Plan of Development or Sale - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\


✔✔any announcement or piece of documentation (e.g., sign,
|\ |\ |\ |\ |\ |\ |\ |\


public notice, or hearing, sales pitch,
|\ |\ |\ |\ |\




advertisement, drawing, permit application, zoning request, |\ |\ |\ |\ |\ |\


computer design, etc.) or physical demarcation (e.g., boundary
|\ |\ |\ |\ |\ |\ |\ |\


signs, lot stakes,
|\ |\

Document information

Uploaded on
October 24, 2025
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$21.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMSTUDYPLUG
4.5
(242)
Sold
393
Followers
107
Items
21066
Last sold
9 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions