You are inspecting a construction site and notice that the soil
appears to be a fine-grained, cohesive material with good
bearing capacity. What type of soil is this likely to be?
a. Clay
b. Sand
© 2025 Assignment Expert
c. Gravel
d. Loam [ ANS: ] a. Clay
Guru01 - Stuvia
You are inspecting the clearing and grubbing of a construction
site and notice that a large tree has been removed within the
limits of disturbance. What should you do?
a. Notify the project manager and request that a replacement
tree be planted
b. Document the removal in the construction logs and move on
c. Issue a stop work order until a replacement tree can be planted
d. Request that the tree be replaced, but do not issue a stop work
order [ ANS: ] d. Request that the tree be replaced, but do not
issue a stop work order
You are inspecting the placement of an embankment and notice
that the compaction is below the required specification. What
should you do?
a. Accept the work and move on
, 2
For Expert help and assignment solutions, +254707240657
b. Notify the project manager and request that the compaction
be corrected
c. Issue a stop work order until the compaction can be corrected
d. Document the issue in the construction logs and move on [
ANS: ] b. Notify the project manager and request that the
compaction be corrected
You are asked to calculate the excavation and embankment
quantities for a construction project. What information do you
need to complete this task?
© 2025 Assignment Expert
a. The dimensions of the excavation and embankment areas
b. The weight of the soil and other materials
c. The density of the soil and other materials
Guru01 - Stuvia
d. All of the above [ ANS: ] d. All of the above
You are inspecting a construction site and notice that temporary
erosion and sediment controls are not properly installed. What
should you do?
a. Accept the work and move on
b. Notify the project manager and request that the controls be
corrected
c. Issue a stop work order until the controls can be corrected
d. Document the issue in the construction logs and move on [
ANS: ] c. Issue a stop work order until the controls can be
corrected
You are inspecting the placement of a subgrade and notice that
the undercutting is not to the specified depth. What should you
do?
, 3
For Expert help and assignment solutions, +254707240657
a. Accept the work and move on
b. Notify the project manager and request that the undercutting
be corrected
c. Issue a stop work order until the undercutting can be corrected
d. Document the issue in the construction logs and move on [
ANS: ] b. Notify the project manager and request that the
undercutting be corrected
You are asked to determine the acceptability of the results of a
soil compaction test. What criteria should you use to make this
© 2025 Assignment Expert
determination?
a. The compaction meets or exceeds the specified density
b. The compaction meets or exceeds the specified moisture
Guru01 - Stuvia
content
c. The compaction meets or exceeds both the specified density
and moisture content
d. The compaction meets or exceeds the specified density or
moisture content [ ANS: ] c. The compaction meets or exceeds
both the specified density and moisture content
You are inspecting the placement of an aggregate subbase and
notice that the finish tolerances are not being met. What should
you do?
a. Accept the work and move on
b. Notify the project manager and request that the finish
tolerances be corrected
c. Issue a stop work order until the finish tolerances can be
corrected
, 4
For Expert help and assignment solutions, +254707240657
d. Document the issue in the construction logs and move on [
ANS: ] b. Notify the project manager and request that the finish
tolerances be corrected
You are asked to identify the limits of disturbance on a
construction site. What are the limits of disturbance?
a. The area where trees, shrubs, and other vegetation will be
removed or damaged during construction
b. The area where the construction activities will take place
c. The area where the construction activities will have an impact
© 2025 Assignment Expert
on the environment
d. All of the above [ ANS: ] d. All of the above
You are inspecting a construction site and notice that materials
Guru01 - Stuvia
testing and certification are not being properly carried out. What
should you do?
a. Accept the work and move on
b. Notify the project manager and request that the testing and
certification be corrected
c. Issue a stop work order until the testing and certification can be
corrected
d. Document the issue in the construction logs and move on [
ANS: ] b. Notify the project manager and request that the testing
and certification be corrected
You are inspecting a construction site and notice that the soil
appears to be a well-graded mixture of fine and coarse particles.
What type of soil is this likely to be?
a. Clay
b. Sand
For Expert help and assignment solutions, +254707240657
NICET Level 2 Full Exam Questions and
Answers (100% Correct Answers) Already
Graded A+
You are inspecting a construction site and notice that the soil
appears to be a fine-grained, cohesive material with good
bearing capacity. What type of soil is this likely to be?
a. Clay
b. Sand
© 2025 Assignment Expert
c. Gravel
d. Loam [ ANS: ] a. Clay
Guru01 - Stuvia
You are inspecting the clearing and grubbing of a construction
site and notice that a large tree has been removed within the
limits of disturbance. What should you do?
a. Notify the project manager and request that a replacement
tree be planted
b. Document the removal in the construction logs and move on
c. Issue a stop work order until a replacement tree can be planted
d. Request that the tree be replaced, but do not issue a stop work
order [ ANS: ] d. Request that the tree be replaced, but do not
issue a stop work order
You are inspecting the placement of an embankment and notice
that the compaction is below the required specification. What
should you do?
a. Accept the work and move on
, 2
For Expert help and assignment solutions, +254707240657
b. Notify the project manager and request that the compaction
be corrected
c. Issue a stop work order until the compaction can be corrected
d. Document the issue in the construction logs and move on [
ANS: ] b. Notify the project manager and request that the
compaction be corrected
You are asked to calculate the excavation and embankment
quantities for a construction project. What information do you
need to complete this task?
© 2025 Assignment Expert
a. The dimensions of the excavation and embankment areas
b. The weight of the soil and other materials
c. The density of the soil and other materials
Guru01 - Stuvia
d. All of the above [ ANS: ] d. All of the above
You are inspecting a construction site and notice that temporary
erosion and sediment controls are not properly installed. What
should you do?
a. Accept the work and move on
b. Notify the project manager and request that the controls be
corrected
c. Issue a stop work order until the controls can be corrected
d. Document the issue in the construction logs and move on [
ANS: ] c. Issue a stop work order until the controls can be
corrected
You are inspecting the placement of a subgrade and notice that
the undercutting is not to the specified depth. What should you
do?
, 3
For Expert help and assignment solutions, +254707240657
a. Accept the work and move on
b. Notify the project manager and request that the undercutting
be corrected
c. Issue a stop work order until the undercutting can be corrected
d. Document the issue in the construction logs and move on [
ANS: ] b. Notify the project manager and request that the
undercutting be corrected
You are asked to determine the acceptability of the results of a
soil compaction test. What criteria should you use to make this
© 2025 Assignment Expert
determination?
a. The compaction meets or exceeds the specified density
b. The compaction meets or exceeds the specified moisture
Guru01 - Stuvia
content
c. The compaction meets or exceeds both the specified density
and moisture content
d. The compaction meets or exceeds the specified density or
moisture content [ ANS: ] c. The compaction meets or exceeds
both the specified density and moisture content
You are inspecting the placement of an aggregate subbase and
notice that the finish tolerances are not being met. What should
you do?
a. Accept the work and move on
b. Notify the project manager and request that the finish
tolerances be corrected
c. Issue a stop work order until the finish tolerances can be
corrected
, 4
For Expert help and assignment solutions, +254707240657
d. Document the issue in the construction logs and move on [
ANS: ] b. Notify the project manager and request that the finish
tolerances be corrected
You are asked to identify the limits of disturbance on a
construction site. What are the limits of disturbance?
a. The area where trees, shrubs, and other vegetation will be
removed or damaged during construction
b. The area where the construction activities will take place
c. The area where the construction activities will have an impact
© 2025 Assignment Expert
on the environment
d. All of the above [ ANS: ] d. All of the above
You are inspecting a construction site and notice that materials
Guru01 - Stuvia
testing and certification are not being properly carried out. What
should you do?
a. Accept the work and move on
b. Notify the project manager and request that the testing and
certification be corrected
c. Issue a stop work order until the testing and certification can be
corrected
d. Document the issue in the construction logs and move on [
ANS: ] b. Notify the project manager and request that the testing
and certification be corrected
You are inspecting a construction site and notice that the soil
appears to be a well-graded mixture of fine and coarse particles.
What type of soil is this likely to be?
a. Clay
b. Sand