Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 2 van de 10 pagina's
Tentamen (uitwerkingen)

CSLB Practice Test

Document preview thumbnail
Voorbeeld 2 van de 10 pagina's

Exam of 10 pages for the course CSLB Practice at CSLB Practice (CSLB Practice Test)

Voorbeeld van de inhoud

CSLB Practice Test
Study online at https://quizlet.com/_73kbdz

1. The costs of running your business, including office b. Overhead
expenses, etc., is called:

a. Direct Costs
b. Overhead
c. A liability
d. Accrual

2. Which government agency collects State Unemploy- a. Employment Develop-
ment Tax? ment Department

a. Employment Development Department
b. County Unemployment Office
c. Franchise Tax Board
d. Internal Revenue Service

3. Who does not need a California Contractor's State Li- d. Sale or installation of
cense? finished products that do
not become a fixed part of
a. Someone who repairs or maintains an air-condition- the structure
ing unit or heat-pump unit.
b. Someone who installs mobile-homes
c. Someone who digs wells on the property of others
d. Sale or installation of finished products that do not
become a fixed part of the structure

4. Which of the following is not part of a Home-Improve- c. Twenty-Day Preliminary
ment Contract? Notice

a. Mechanic's Lien Warning
b. Notice of Cancellation
c. Twenty-Day Preliminary Notice
d. All of the above.


, CSLB Practice Test
Study online at https://quizlet.com/_73kbdz


5. Prime Contractor must pay subcontractor when? a. 10-days after
Prime-contractor received
a. 10-days after Prime-contractor received payment payment
b. When Prime-contractor receives withheld retention
monies
c. 30-days after completion
d. As soon as subcontractor completes the work

6. The Contractor's Surety Bond is necessary for most c. $15,000
contractors to obtain their license. This bond is in the
amount of:

a. $2,500
b. $7,000
c. $15,000
d. $25,000

7. How long with the CSLB hold a contractor responsible b. 4-years
for observable defects?

a. 5-years
b. 4-years
c. 3-years
d. 2-years

8. In which of the following circumstances must a li- d. All of the above
censed contractor provide their license number?

a. On all contracts
b. On all advertising
c. On all "20-day Preliminary Notices"
d. All of the above

Documentinformatie

Geüpload op
21 oktober 2025
Aantal pagina's
10
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$11.99

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kan je een ander document kiezen. Je kan het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
waindigrace87
4.0
(2)
Verkocht
3
Volgers
0
Items
1991
Laatst verkocht
4 maanden geleden



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen