3M 303 Workcenter Supervisor Study Guide
Study online at https://quizlet.com/_hpsbgt
1. COMNAVSURFORINST 4790.1: What series governs 3M Certification and Assessment ?
2. NAVSEAINST 4709.8: What is the ships 3M Manual?
3. CINCLANTFLTINST 4790.3: What series is the joint fleet maintenance manual?
4. OPNAVINST 4790.4: What is the ships Maintenance and Material Management Policy?
5. OPNAVINST 5100.19: What is the safety manual that should be reviewed before beginning a maintenance
action?
6. 3M Coordinator (3MC): Who is the 3M Functional Manager for the ship?
7. Executive Officer (XO): Who is the Ships 3M System Manager?
8. Commanding Officer (CO): Who is the 3M Manager responsible for the ships 3M system?
9. Work Center Supervisor: Who reviews MRCs and promptly submits a PMS TFBR whenever maintenance
requirements are not fully understood or errors exist?
10. Work Center Supervisor: Who schedules weekly Work Center maintenance and supervises its proper
accomplishment?
11. Work Center Supervisor: Who should be immediately notified if there is anything on the MRC that you
do not fully understand, when any tools, parts or material listed on the MRC are not available, or if there is any doubt
about your ability to properly perform the maintenance check?
12. Technical and Non-Technical: What are the two type of feedback reports?
13. Non-technical issues such as changes to LOEP, requesting classified MRCs or
copies of standardized EGLs: What are category A feedback reports for?
14. Technical issues with MIPs or MRCs: What are category B feedback reports for?
15. A record of unaccomplished checks, reschedule checks and checks accom-
plished by higher authority.: What does a flip page report contain?
16. 4 days: When a feedback report is entered into SKED, how many days does the 3MC have to transmit it?
17. State the reason why the check was not accomplished and include a JCN
that will correct the deficiency.: If you have a maintenance check that was not completed because the
equipment failed to operate properly, what should your flip page report contain?
18. Cross out the periodicity code on the 13 week report for the corresponding
maintenance, either write "N/A" or ESOMS tag out number in the "tag out"
block, sign and date the 13 week report, then report the accomplishment of the
maintenance to the work center supervisor: Once a maintenance action has been completed,
what should the should the maintenance person make sure to do?
1/4
Study online at https://quizlet.com/_hpsbgt
1. COMNAVSURFORINST 4790.1: What series governs 3M Certification and Assessment ?
2. NAVSEAINST 4709.8: What is the ships 3M Manual?
3. CINCLANTFLTINST 4790.3: What series is the joint fleet maintenance manual?
4. OPNAVINST 4790.4: What is the ships Maintenance and Material Management Policy?
5. OPNAVINST 5100.19: What is the safety manual that should be reviewed before beginning a maintenance
action?
6. 3M Coordinator (3MC): Who is the 3M Functional Manager for the ship?
7. Executive Officer (XO): Who is the Ships 3M System Manager?
8. Commanding Officer (CO): Who is the 3M Manager responsible for the ships 3M system?
9. Work Center Supervisor: Who reviews MRCs and promptly submits a PMS TFBR whenever maintenance
requirements are not fully understood or errors exist?
10. Work Center Supervisor: Who schedules weekly Work Center maintenance and supervises its proper
accomplishment?
11. Work Center Supervisor: Who should be immediately notified if there is anything on the MRC that you
do not fully understand, when any tools, parts or material listed on the MRC are not available, or if there is any doubt
about your ability to properly perform the maintenance check?
12. Technical and Non-Technical: What are the two type of feedback reports?
13. Non-technical issues such as changes to LOEP, requesting classified MRCs or
copies of standardized EGLs: What are category A feedback reports for?
14. Technical issues with MIPs or MRCs: What are category B feedback reports for?
15. A record of unaccomplished checks, reschedule checks and checks accom-
plished by higher authority.: What does a flip page report contain?
16. 4 days: When a feedback report is entered into SKED, how many days does the 3MC have to transmit it?
17. State the reason why the check was not accomplished and include a JCN
that will correct the deficiency.: If you have a maintenance check that was not completed because the
equipment failed to operate properly, what should your flip page report contain?
18. Cross out the periodicity code on the 13 week report for the corresponding
maintenance, either write "N/A" or ESOMS tag out number in the "tag out"
block, sign and date the 13 week report, then report the accomplishment of the
maintenance to the work center supervisor: Once a maintenance action has been completed,
what should the should the maintenance person make sure to do?
1/4