The process of initiating a construction project. [ Ans: ] 1.
Advertise for bids
2. Open bids
© 2025 Assignment Expert
3. Award contract
4. Sign the contract
5. Issue notice to proceed
Guru01 - Stuvia
Under the Contractor Quality Control (CQC) process, inspection is
provided by the contractor [ Ans: ] False
Owners generally engage the services of a professional
construction management firm (Agency CM) in fast-track projects
with multiple contracts. [ Ans: ] True
A professional construction management firm (Agency CM) can
participate in the following phases of a project [ Ans: ]
Conception, program planning, Design, Construction and
Closeout
The Design-Build (DB) project delivery process may face some
barriers when tried to be implemented in the public sector. [ Ans:
] True
In a project with multiple prime contractors, who is responsible for
coordinating the various trade contractors? [ Ans: ] Owner or its
representative (e.g. the construction manager)
The Resident Project Representative should not direct the
contractor's work. [ Ans: ] True
, 2
For Expert help and assignment solutions, +254707240657
Which of the following is under the authority of the Resident
Project Representative? [ Ans: ] To approve materials &
worksmanship that meet the contract requirements
Routing of submittals from the subcontractor to the Designer [
Ans: ] 1. Subcontractor
2. Contractor
3. Resident Project Representative
4. Project Engineer
5. Design Reviews
The Resident Project Representative should obtain the contract
© 2025 Assignment Expert
documents and study those as soon as being engaged to provide
resident inspection on a project. [ Ans: ] True
The Resident Project Representative does not need to make any
measurement for the progress payments in the lump-sum projects
Guru01 - Stuvia
[ Ans: ] False
When the Resident Project Representative identifies a problem
with the subcontractor's work, he/she should provide instructions
directly to the subcontractor. [ Ans: ] False
If the daily Construction Report is generated in the computer, it is
advisable that the Resident Project Representative prints a hard
copy, signs it, and files it at the end of each business day. [ Ans: ]
True
One way of making bid advertisements, as becoming more
popular each day, is to post them on the World Wide Web
(internet website). [ Ans: ] True
The web-based project management systems help reduce
turnaround time on communications and improved access to
project paperwork. [ Ans: ] True
Video cameras/Webcams can be used to document field
problem areas in a construction project. [ Ans: ] True
For Expert help and assignment solutions, +254707240657
CON 367 MIDTERM Questions and Answers
(100% Correct Answers) Already Graded
A+
The process of initiating a construction project. [ Ans: ] 1.
Advertise for bids
2. Open bids
© 2025 Assignment Expert
3. Award contract
4. Sign the contract
5. Issue notice to proceed
Guru01 - Stuvia
Under the Contractor Quality Control (CQC) process, inspection is
provided by the contractor [ Ans: ] False
Owners generally engage the services of a professional
construction management firm (Agency CM) in fast-track projects
with multiple contracts. [ Ans: ] True
A professional construction management firm (Agency CM) can
participate in the following phases of a project [ Ans: ]
Conception, program planning, Design, Construction and
Closeout
The Design-Build (DB) project delivery process may face some
barriers when tried to be implemented in the public sector. [ Ans:
] True
In a project with multiple prime contractors, who is responsible for
coordinating the various trade contractors? [ Ans: ] Owner or its
representative (e.g. the construction manager)
The Resident Project Representative should not direct the
contractor's work. [ Ans: ] True
, 2
For Expert help and assignment solutions, +254707240657
Which of the following is under the authority of the Resident
Project Representative? [ Ans: ] To approve materials &
worksmanship that meet the contract requirements
Routing of submittals from the subcontractor to the Designer [
Ans: ] 1. Subcontractor
2. Contractor
3. Resident Project Representative
4. Project Engineer
5. Design Reviews
The Resident Project Representative should obtain the contract
© 2025 Assignment Expert
documents and study those as soon as being engaged to provide
resident inspection on a project. [ Ans: ] True
The Resident Project Representative does not need to make any
measurement for the progress payments in the lump-sum projects
Guru01 - Stuvia
[ Ans: ] False
When the Resident Project Representative identifies a problem
with the subcontractor's work, he/she should provide instructions
directly to the subcontractor. [ Ans: ] False
If the daily Construction Report is generated in the computer, it is
advisable that the Resident Project Representative prints a hard
copy, signs it, and files it at the end of each business day. [ Ans: ]
True
One way of making bid advertisements, as becoming more
popular each day, is to post them on the World Wide Web
(internet website). [ Ans: ] True
The web-based project management systems help reduce
turnaround time on communications and improved access to
project paperwork. [ Ans: ] True
Video cameras/Webcams can be used to document field
problem areas in a construction project. [ Ans: ] True