• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

CMGT Final Exam Review Questions And Answers Rated 100%!!!

Document preview thumbnail
Preview 2 out of 12 pages

architect - ANS Which of the following profession derives its name from the Greek, meaning; "master-builder"? Construction Manager - ANS Which project participant may be defined as, "a person who coordinates the construction process on behalf of the owner"? The main advantage of PLAs is that the unions agree not to strike for the project's duration. The main disadvantage is that non-union contractors experience problems during the bidding process because, by law, a PLA has no impact on a contractor's existing employees, only on hiring new employees. After all, the basic agreement is that contractors must hire workers only through the union hiring halls at that point. The unions are actively pushing government agencies to require PLAs on their projects. - ANS What are the advantages and disadvantages of project labor agreements? What is causing their increased use. The Building Official The Zoning Administrator - ANS The term "Authority Having Jurisdiction" refers to which of the following stakeholders (select all that apply): The Building Official The Zoning Administrator The Owner The Architect The Contractor Caisson foundations Safe elevators Steel framing Fireproofing - ANS What four things were necessary before the first real skyscraper could be constructed? (select 4) Steel reinforcing Caisson foundations Safe elevators Heat pumps Glass Curtain Walls Steel framing Seismic dampers Fireproofing Linking model objects with scheduled activities Simulating construction Communicating in a visual environment - ANS Four-D visualization enables engineers to improve the construction process in three specific ways. Name these three process improvements. (Select 3) Model-based life-cycle phasing Linking model objects with scheduled activities Virtual prototyping Simulating construction Communicating in a visual environment System interface interference Holographic storage Proactive computing Tacit knowledge extraction Audit agents Non-monolith documents Nanotechnology Artificial life schedule optimization - ANS Which of the following are emerging technologies that could significantly impact how the construction industry conducts business? (select all that apply) Holographic storage Radio-frequency indentification Proactive computing Active beacon systems Tacit knowledge extraction Audit agents Simulation technologies Non-monolith documents Nanotechnology Performance-related specifications Artificial life schedule optimization Global positioning systems Owner - ANS Whose responsibility is scope definition? Schedule, Budget, What kind of project it is - ANS What types of questions must be answered in the process of scope definition? In charge of the whole project - ANS What is the function of a Project Manager? coordinate fieldwork and supervise foremen - ANS What is the function of a Project Superintendent? assist the project manager - ANS What is the function of a Project Engineer? supervise field workers / labor crews - ANS What is the function of a Foreman? Determine order and duration of project activities - ANS What is the primary function of a Scheduler? Manage the procurement process - ANS What is the function of a Purchasing Agent/Expediter? schematic design - ANS initial documents approximating the design intent of the project record drawings - ANS final drawings for a project; construction drawings updated to reflect actual finished conditions punchlist - ANS tabulation of unfinished or incorrectly installed components commissioning - ANS start-up, operation, and testing of facility equipment and systems substantial completion - ANS project schedule milestone; warranties begin, half of retainage is released, punchlist commences, etc. notice to proceed - ANS owner authored document granting permission to a contractor to commence construction activities letter of intent - ANS owner authored document indicating they will enter into a construction contract with a contractor True - ANS True or False. It is ALWAYS best to wait until construction drawings and specifications are complete before contacting pertinent regulatory agencies; then to submit the documents with a request for expedited review and approval. False - ANS True or False. The Certificate of Occupancy is typically issued by the permitting municipality, and a Certificate of Substantial Completion is issued by the Architect of Record at the point of substantial completion is complete and a punchlist has been established. True or False: It is the Certificate of Substantial Completion issued by the Architect of Record that permits the Owner to occupy the building. True - ANS True or False. At the time of the issuance of a Certificate of Substantial Completion by the Architect of Record, an Owner likely may begin moving into their facility; they may move in furniture, supplies, equipment, the approval of the Building Inspector - but may not yet move people in to conduct business. False - ANS True or False. All projects must progress through exactly all the of steps of the Typical Project Sequence as described in lecture. EIFS - ANS stucco-like exterior finish system intumescent fireproofing - ANS steel protection; paint; steel fire-proofing - roll or brush-applied

Content preview

CMGT Final Exam Review Questions
And Answers Rated 100%!!!

, architect - ANS Which of the following profession derives its name from the Greek,
meaning; "master-builder"?

Construction Manager - ANS Which project participant may be defined as, "a person who
coordinates the construction process on behalf of the owner"?

The main advantage of PLAs is that the unions agree not to strike for the project's duration. The
main disadvantage is that non-union contractors experience problems during the bidding
process because, by law, a PLA has no impact on a contractor's existing employees, only on
hiring new employees. After all, the basic agreement is that contractors must hire workers only
through the union hiring halls at that point. The unions are actively pushing government
agencies to require PLAs on their projects. - ANS What are the advantages and
disadvantages of project labor agreements? What is causing their increased use.

The Building Official
The Zoning Administrator - ANS The term "Authority Having Jurisdiction" refers to which of
the following stakeholders (select all that apply):
The Building Official
The Zoning Administrator
The Owner
The Architect
The Contractor

Caisson foundations
Safe elevators
Steel framing
Fireproofing - ANS What four things were necessary before the first real skyscraper could
be constructed? (select 4)
Steel reinforcing
Caisson foundations
Safe elevators
Heat pumps
Glass Curtain Walls
Steel framing
Seismic dampers
Fireproofing

Linking model objects with scheduled activities
Simulating construction

Document information

Uploaded on
October 17, 2025
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.79

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DocLaura
4.2
(44)
Sold
161
Followers
38
Items
6357
Last sold
1 month ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions