CMAA CONSTRUCTION MANAGEMENT EXAM GRADED A+
1. Which is of following is NOT Agency manageme
Series Model Contract Documents nt
(2003 Ed.)? assistance
A) A-1: Standard Form of to the
Agreement between Owner and Owner
CM, CM as Owner's Agent (2003 prior to
Ed.) constructio
B) A-2: Standard Form of n and
Agreement between Owner and advice on
Contractor (2003 Ed.) constructibi
C)A-3: General Conditions lity, budget
between Owner and Contractor and
(2003 Ed.) schedule
D) AIA A101 Standard project that considerati
has a lump sum price. ons.
D) The sum
2. All of the following can be a establishe
definition of Constructibility , normally
EXCEPT: during
A) Definition: (or buildability) is a
project management technique
to review construction processes
from start to finish during pre-
construction phase.
B) The ease with which a project can
be built, based upon the clarity,
consistency, and completeness
of the contract documents for
bidding, administration, and
interpretation to achieve overall
project objectives.
C)The CM provides professional
,CMAA CONSTRUCTION MANAGEMENT EXAM GRADED A+
D) AIA A101 Standard pro- ject that has a
lump sum price.
D) The sum established, normally during
the pre-design or design phase, as
available for construction of the project.
,CMAA CONSTRUCTION MANAGEMENT EXAM GRADED A+
the pre-design or design phase, A) Develo
as available for construction of ping time
the project. and
sequenci
3. Value Engineering: ng
A) Additions and/or modifications consider
to the general conditions, which ations
are part of the bid documents related
and/or contract documents. to
B) The application of specific design
procedures to determine if
work has been completed in
the prescribed manner and at
the required levels of
workmanship.
C)Assurance by a party that it
will assume stipulated
responsibility for its own work.
D) A systematic, organized
approach to obtaining optimum
value for each dollar spent.
4. All of the following are
Value Engineering principles
EXCEPT:
A) Value Analysis
B) Function oriented approach
C)Creative thinking
D) Organized review
5. During the Design Phase, the
CM's services may NOT relate
principally to the following:
,CMAA CONSTRUCTION MANAGEMENT EXAM GRADED A+
D) A systematic, organized approach to
obtaining optimum value for each dollar
spent.
A) Value Analysis
D) Assist in attracting bid- ders,
prequalifying bidders.
1. Which is of following is NOT Agency manageme
Series Model Contract Documents nt
(2003 Ed.)? assistance
A) A-1: Standard Form of to the
Agreement between Owner and Owner
CM, CM as Owner's Agent (2003 prior to
Ed.) constructio
B) A-2: Standard Form of n and
Agreement between Owner and advice on
Contractor (2003 Ed.) constructibi
C)A-3: General Conditions lity, budget
between Owner and Contractor and
(2003 Ed.) schedule
D) AIA A101 Standard project that considerati
has a lump sum price. ons.
D) The sum
2. All of the following can be a establishe
definition of Constructibility , normally
EXCEPT: during
A) Definition: (or buildability) is a
project management technique
to review construction processes
from start to finish during pre-
construction phase.
B) The ease with which a project can
be built, based upon the clarity,
consistency, and completeness
of the contract documents for
bidding, administration, and
interpretation to achieve overall
project objectives.
C)The CM provides professional
,CMAA CONSTRUCTION MANAGEMENT EXAM GRADED A+
D) AIA A101 Standard pro- ject that has a
lump sum price.
D) The sum established, normally during
the pre-design or design phase, as
available for construction of the project.
,CMAA CONSTRUCTION MANAGEMENT EXAM GRADED A+
the pre-design or design phase, A) Develo
as available for construction of ping time
the project. and
sequenci
3. Value Engineering: ng
A) Additions and/or modifications consider
to the general conditions, which ations
are part of the bid documents related
and/or contract documents. to
B) The application of specific design
procedures to determine if
work has been completed in
the prescribed manner and at
the required levels of
workmanship.
C)Assurance by a party that it
will assume stipulated
responsibility for its own work.
D) A systematic, organized
approach to obtaining optimum
value for each dollar spent.
4. All of the following are
Value Engineering principles
EXCEPT:
A) Value Analysis
B) Function oriented approach
C)Creative thinking
D) Organized review
5. During the Design Phase, the
CM's services may NOT relate
principally to the following:
,CMAA CONSTRUCTION MANAGEMENT EXAM GRADED A+
D) A systematic, organized approach to
obtaining optimum value for each dollar
spent.
A) Value Analysis
D) Assist in attracting bid- ders,