What colors are channelizing devices? - ANSWER-Orange, White
and Reflective or Red, White and Reflective
What is the spacing for expansion joints in sidewalks? -
ANSWER-Not exceeding 20', 3/4" thick
What type of joint filler is used for expansion joints? - ANSWER-
Elastromeric Filler/ sealer
What is the spacing for construction joints for sidewalks? -
ANSWER-not exceeding 10' , 3/4" Thick and 1/8" wide
What is the finishing tolerance for sidewalks? - ANSWER-1/4"
How to protect concrete during winter temps? - ANSWER-Build a
shelter and place heaters to maintain temp, warm water the the
mix
,2|Page
What is the width of construction joints for Curbs and Gutters? -
ANSWER-1/8" Wide
What is the expansion joint intervals for curbs and gutters? -
ANSWER-60'
What tools are used for finishing sidewalks? - ANSWER-Broom
finish and edging tool
What is the joint size for stone curbs? - ANSWER-1/2" Wide
What is the max depression acceptable for stone curb? -
ANSWER-1/4"
What is an R1-1 Sign according to MUTCD? - ANSWER-Yield
Sign
What is the shape of a stop sign? - ANSWER-Octagon
, 3|Page
What sign is a R1-1 Sign? - ANSWER-Stop Sign
What is the embankment finishing tolerance? - ANSWER-Within
+-0.05 Feet
What is the finishing tolerance for embankment of a slope? -
ANSWER-+-.010 Feet
When placing pipe in a trench what elevation do you start from? -
ANSWER-The lowest elevation and work backwards
What is the maximum drop from concrete placement? -
ANSWER-5 feet
where should concrete placement start? - ANSWER-At the bottom
of a slope
For concrete structures where should tie wire be facing? -
ANSWER-Away from finished surface
NICET LEVEL 2 EXAM LATEST 2025/2026 ACTUAL EXAM WITH
COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (100%
VERIFIED ANSWERS) |ALREADY GRADED A+| ||PROFESSOR
VERIFIED|| ||BRANDNEW!!!||
What colors are channelizing devices? - ANSWER-Orange, White
and Reflective or Red, White and Reflective
What is the spacing for expansion joints in sidewalks? -
ANSWER-Not exceeding 20', 3/4" thick
What type of joint filler is used for expansion joints? - ANSWER-
Elastromeric Filler/ sealer
What is the spacing for construction joints for sidewalks? -
ANSWER-not exceeding 10' , 3/4" Thick and 1/8" wide
What is the finishing tolerance for sidewalks? - ANSWER-1/4"
How to protect concrete during winter temps? - ANSWER-Build a
shelter and place heaters to maintain temp, warm water the the
mix
,2|Page
What is the width of construction joints for Curbs and Gutters? -
ANSWER-1/8" Wide
What is the expansion joint intervals for curbs and gutters? -
ANSWER-60'
What tools are used for finishing sidewalks? - ANSWER-Broom
finish and edging tool
What is the joint size for stone curbs? - ANSWER-1/2" Wide
What is the max depression acceptable for stone curb? -
ANSWER-1/4"
What is an R1-1 Sign according to MUTCD? - ANSWER-Yield
Sign
What is the shape of a stop sign? - ANSWER-Octagon
, 3|Page
What sign is a R1-1 Sign? - ANSWER-Stop Sign
What is the embankment finishing tolerance? - ANSWER-Within
+-0.05 Feet
What is the finishing tolerance for embankment of a slope? -
ANSWER-+-.010 Feet
When placing pipe in a trench what elevation do you start from? -
ANSWER-The lowest elevation and work backwards
What is the maximum drop from concrete placement? -
ANSWER-5 feet
where should concrete placement start? - ANSWER-At the bottom
of a slope
For concrete structures where should tie wire be facing? -
ANSWER-Away from finished surface