A+ Page 1
#
, Solutions Manual for Electrical Wiring Commercial 18th # # # # # # #
Edition by Phil Simmons A+ # # # #
Solution and Answer Guide # # #
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115; CHAPTE# # # # # # # #
R 1:COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
# # # # #
TABLE OF CONTENTS # #
Review .......................................................................................................................................................... 1
Note to instructor: It is recommended that students be required to respond, where appropriat
# # # # # # # # # # # # #
e, with answers that are complete sentences.
# # # # # #
REVIEW
Refer to the National Electrical Code or the working drawings when necessary. Where applicabl
# # # # # # # # # # # # #
e, responses should be written in complete sentences.
# # # # # # #
1. What section of a commercial building’s specification contains a list of contract d
# # # # # # # # # # # #
ocuments?
Answer: A list of the contract documents is contained in General Clauses and Conditions. A listing
# # # # # # # # # # # # # # #
# of the Commercial Building contract documents is presented in this chapter under the heading “Co
# # # # # # # # # # # # # #
mmercial Building Plans.” The instructor may wish to have the students check over this listing and c
# # # # # # # # # # # # # # # #
ompare it with the plans provided. # # # # #
2. The requirement for temporary light and power at the job site will be found in what po
# # # # # # # # # # # # # # # #
rtion of a commercial building’s specification?
# # # # #
Answer: The Supplementary General Conditions specifies the job site requirements for temporary
# # # # # # # # # # # #
light and power. In some contracts, this electrical system becomes the responsibility of the general
# # # # # # # # # # # # # # #
contractor; in other contracts, it is the electrical contractor’s responsibility to install and maintain th
# # # # # # # # # # # # # #
e temporary electrical system. The instructor may wish to refer the student to NEC Article 590 and d
# # # # # # # # # # # # # # # # #
iscuss the requirements in detail.
# # # #
A+ Page 2 #
,3. The electrician uses the Schedule of Working Drawings for what purpose?
# # # # # # # # # #
Answer: The electrician uses the Schedule of Working Drawings to determine whether all of the dr
# # # # # # # # # # # # # # #
awings are at hand. The information on “the other sheets” may be very important, especially in coor
# # # # # # # # # # # # # # # #
dinating with other contractors.
# # #
4. Complete the following items by indicating the letter(s) designating the correct source(s) of
# # # # # # # # # # # #
# information:
No. Answer Item Information
4. Sections Ceiling height # Sections, Sheet A6 # #
5. Electrical symb # Electrical receptacle styl Electrical symbol schedule, Chapter 2
# # # # # #
ol schedule
# e ,Figure 2–6 #
6. Electrical # Electrical outlet locatio # # Electrical layout drawings, Sheets El,E
# # # #
layout dr # n 2, and E3
# #
awings
7. Elevations Exterior wall finishes # # Elevations, Sheets A4 and A5 # # # #
8. Site plan # Grading elevations # Site plan, Sheet A4
# # #
9. Electrical # Panelboard schedules # Electrical layout drawings, Sheet E4 # # # #
layout dr #
awings
10. Architectural fl # Room width # Architectural floor plan, Sheets Al, A2, # # # # #
oor plan # and A3 #
11. Architectural fl # Swing of door # # Architectural floor plan, Sheets Al, A2, # # # # #
oor plan # and A3 #
12. Sections View of interior wall
# # # Sections, Sheet A6 # #
A+ Page 3 #
, Match the items on the left with those on the right by writing the letter designation
# # # # # # # # # # # # # # #
# ofthe appropriate organization from the list on the right.
# # # # # # # #
13. NEC Electrical Code # National Electrical Code (NEC) # # #
14. IAEI Electrical inspectors #
International Association of # # #
ElectricalInspectors (IAEI) #
15. NFPA Fire codes
# National Fire Protection Association (
# # # #
NFPA)
16. IESNA Lighting information # Illuminating Engineering #
# Society ofNorth America # #
(IESNA)
#
17. UL Listing service # Underwriters Laboratories, Inc. (UL # # #
)
18. NEMA Manufacturers’ standard # National Electrical Manufacturers # #
s Association (NEMA) #
19. PE Seal Professional Engineer (PE) # #
Match the items on the left with those on the right by writing the letter desi
# # # # # # # # # # # # # # #
gnation ofthe proper level of NEC interpretation from the list on the right.
# # # # # # # # # # # #
20. with specia # Allowed by the Code # # # Shall be permitted, or Shall not b
# # # # # #
l permissio
# erequired, NEC #
n
21. with May be done # # Shall be permitted, or Shall not
# # # # #
A+ Page 4 #
#
, Solutions Manual for Electrical Wiring Commercial 18th # # # # # # #
Edition by Phil Simmons A+ # # # #
Solution and Answer Guide # # #
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115; CHAPTE# # # # # # # #
R 1:COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
# # # # #
TABLE OF CONTENTS # #
Review .......................................................................................................................................................... 1
Note to instructor: It is recommended that students be required to respond, where appropriat
# # # # # # # # # # # # #
e, with answers that are complete sentences.
# # # # # #
REVIEW
Refer to the National Electrical Code or the working drawings when necessary. Where applicabl
# # # # # # # # # # # # #
e, responses should be written in complete sentences.
# # # # # # #
1. What section of a commercial building’s specification contains a list of contract d
# # # # # # # # # # # #
ocuments?
Answer: A list of the contract documents is contained in General Clauses and Conditions. A listing
# # # # # # # # # # # # # # #
# of the Commercial Building contract documents is presented in this chapter under the heading “Co
# # # # # # # # # # # # # #
mmercial Building Plans.” The instructor may wish to have the students check over this listing and c
# # # # # # # # # # # # # # # #
ompare it with the plans provided. # # # # #
2. The requirement for temporary light and power at the job site will be found in what po
# # # # # # # # # # # # # # # #
rtion of a commercial building’s specification?
# # # # #
Answer: The Supplementary General Conditions specifies the job site requirements for temporary
# # # # # # # # # # # #
light and power. In some contracts, this electrical system becomes the responsibility of the general
# # # # # # # # # # # # # # #
contractor; in other contracts, it is the electrical contractor’s responsibility to install and maintain th
# # # # # # # # # # # # # #
e temporary electrical system. The instructor may wish to refer the student to NEC Article 590 and d
# # # # # # # # # # # # # # # # #
iscuss the requirements in detail.
# # # #
A+ Page 2 #
,3. The electrician uses the Schedule of Working Drawings for what purpose?
# # # # # # # # # #
Answer: The electrician uses the Schedule of Working Drawings to determine whether all of the dr
# # # # # # # # # # # # # # #
awings are at hand. The information on “the other sheets” may be very important, especially in coor
# # # # # # # # # # # # # # # #
dinating with other contractors.
# # #
4. Complete the following items by indicating the letter(s) designating the correct source(s) of
# # # # # # # # # # # #
# information:
No. Answer Item Information
4. Sections Ceiling height # Sections, Sheet A6 # #
5. Electrical symb # Electrical receptacle styl Electrical symbol schedule, Chapter 2
# # # # # #
ol schedule
# e ,Figure 2–6 #
6. Electrical # Electrical outlet locatio # # Electrical layout drawings, Sheets El,E
# # # #
layout dr # n 2, and E3
# #
awings
7. Elevations Exterior wall finishes # # Elevations, Sheets A4 and A5 # # # #
8. Site plan # Grading elevations # Site plan, Sheet A4
# # #
9. Electrical # Panelboard schedules # Electrical layout drawings, Sheet E4 # # # #
layout dr #
awings
10. Architectural fl # Room width # Architectural floor plan, Sheets Al, A2, # # # # #
oor plan # and A3 #
11. Architectural fl # Swing of door # # Architectural floor plan, Sheets Al, A2, # # # # #
oor plan # and A3 #
12. Sections View of interior wall
# # # Sections, Sheet A6 # #
A+ Page 3 #
, Match the items on the left with those on the right by writing the letter designation
# # # # # # # # # # # # # # #
# ofthe appropriate organization from the list on the right.
# # # # # # # #
13. NEC Electrical Code # National Electrical Code (NEC) # # #
14. IAEI Electrical inspectors #
International Association of # # #
ElectricalInspectors (IAEI) #
15. NFPA Fire codes
# National Fire Protection Association (
# # # #
NFPA)
16. IESNA Lighting information # Illuminating Engineering #
# Society ofNorth America # #
(IESNA)
#
17. UL Listing service # Underwriters Laboratories, Inc. (UL # # #
)
18. NEMA Manufacturers’ standard # National Electrical Manufacturers # #
s Association (NEMA) #
19. PE Seal Professional Engineer (PE) # #
Match the items on the left with those on the right by writing the letter desi
# # # # # # # # # # # # # # #
gnation ofthe proper level of NEC interpretation from the list on the right.
# # # # # # # # # # # #
20. with specia # Allowed by the Code # # # Shall be permitted, or Shall not b
# # # # # #
l permissio
# erequired, NEC #
n
21. with May be done # # Shall be permitted, or Shall not
# # # # #
A+ Page 4 #