The ______ consists of daily checks of the work to assure continuing compliance with
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
contract requirements - correct answer✔✔Follow-up phase
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Design-Build contracts require: - correct answer✔✔*The QC Manager to be in place and take ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
an active role in the review and coordination of the design*
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Which of the following is included in all three phases of the Three Phases of Control -
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
correct answer✔✔Safety ||\\//||
The purpose of Construction Quality Management is to - correct answer✔✔*Achieve the
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
quality established by properly developed requirements through the combined responsibility,
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
but separate, efforts of contractor and Government personnel*
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Testing is extremely important in Construction Quality Management and is performed by -
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
correct answer✔✔Both the contractor and the Government
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
The primary purpose of the Three-Phase Control System is to: - correct answer✔✔Require
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
the contractor to plan, schedule, and perform quality management actions to assure work
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
meets all specified quality standards
||\\//|| ||\\//|| ||\\//|| ||\\//||
Quality Assurance Personnel have the responsibility to: - correct answer✔✔*require the
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
contractor to maintain the quality specified in the plans and specifications* ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
the ____ is the appropriate time to assure that all materials and/or equipment have been
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
tested. submitted, and approved. - correct answer✔✔Preparatory Phase
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
, The Preconstruction Conference and the Coordination and Mutual Understanding Meeting
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
are: - correct answer✔✔conducted prior to the commencement of any physical construction
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
work
Contractor testing procedures: - correct answer✔✔are specified in the technical ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
specifications, outlined in the Quality Control Plan, and addressed at the Coordination and ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Mutual Understanding Meeting. ||\\//|| ||\\//||
The Quality Control Plan contains: - correct answer✔✔Identification of individual quality
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
control personnel, including name, qualifications, assigned duties, responsibilities and
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
authorities
Tests that are unnanounced, randomly performed, and repeat quality control tests are: -
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
correct answer✔✔quality assurance tests
||\\//|| ||\\//|| ||\\//||
The contractor is required to conduct a preparatory phase meeting before they begins any
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
definable feature of work except when: - correct answer✔✔there are no exceptions to the
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
rule
During the punch-out inspection of a project: - correct answer✔✔*Quality control personnel
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
prepare a punch-list and make corrections* ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
The Quality Control Report should include: - correct answer✔✔All of the above :
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Work in Progress ||\\//|| ||\\//||
Work that has been completed
||\\//|| ||\\//|| ||\\//|| ||\\//||
Problem areas ||\\//||
answers
The ______ consists of daily checks of the work to assure continuing compliance with
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
contract requirements - correct answer✔✔Follow-up phase
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Design-Build contracts require: - correct answer✔✔*The QC Manager to be in place and take ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
an active role in the review and coordination of the design*
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Which of the following is included in all three phases of the Three Phases of Control -
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
correct answer✔✔Safety ||\\//||
The purpose of Construction Quality Management is to - correct answer✔✔*Achieve the
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
quality established by properly developed requirements through the combined responsibility,
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
but separate, efforts of contractor and Government personnel*
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Testing is extremely important in Construction Quality Management and is performed by -
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
correct answer✔✔Both the contractor and the Government
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
The primary purpose of the Three-Phase Control System is to: - correct answer✔✔Require
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
the contractor to plan, schedule, and perform quality management actions to assure work
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
meets all specified quality standards
||\\//|| ||\\//|| ||\\//|| ||\\//||
Quality Assurance Personnel have the responsibility to: - correct answer✔✔*require the
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
contractor to maintain the quality specified in the plans and specifications* ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
the ____ is the appropriate time to assure that all materials and/or equipment have been
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
tested. submitted, and approved. - correct answer✔✔Preparatory Phase
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
, The Preconstruction Conference and the Coordination and Mutual Understanding Meeting
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
are: - correct answer✔✔conducted prior to the commencement of any physical construction
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
work
Contractor testing procedures: - correct answer✔✔are specified in the technical ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
specifications, outlined in the Quality Control Plan, and addressed at the Coordination and ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Mutual Understanding Meeting. ||\\//|| ||\\//||
The Quality Control Plan contains: - correct answer✔✔Identification of individual quality
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
control personnel, including name, qualifications, assigned duties, responsibilities and
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
authorities
Tests that are unnanounced, randomly performed, and repeat quality control tests are: -
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
correct answer✔✔quality assurance tests
||\\//|| ||\\//|| ||\\//||
The contractor is required to conduct a preparatory phase meeting before they begins any
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
definable feature of work except when: - correct answer✔✔there are no exceptions to the
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
rule
During the punch-out inspection of a project: - correct answer✔✔*Quality control personnel
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
prepare a punch-list and make corrections* ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
The Quality Control Report should include: - correct answer✔✔All of the above :
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Work in Progress ||\\//|| ||\\//||
Work that has been completed
||\\//|| ||\\//|| ||\\//|| ||\\//||
Problem areas ||\\//||