• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

P-99 Low Pressure Boiler COF FDNY – Certificate of Fitness Test Prep & Study Guide

Document preview thumbnail
Preview 3 out of 17 pages

A fill line in an oil burner system is a line used to: Fill the storage tank with oil. The aquastat is located Below the water line. All heating, combustion, and cooking equipment shall be installed with adequate clearances from _______ construction. Combustible The equipment must be provided with ______ or the building construction shall be _____ _____. Insulation. Fire Protected During operation the surface of combustible construction materials will not be raised to a temp higher than _____ degrees F. 170 degrees Equipment shall be so that the means of access for ordinary operation and maintenance will not be _______. Hazardous 4 The storage temp range for oil is about ____degrees F. The use of _____ help it to be pumped to the oil burning unit. The fuel oil is raised to about ____ degrees before it enters the combustion process. Don't know? Acceptance Tests: Boilers shall not be placed in operation until they have been _____ and ____ and an equipment ____ _____ has been issued by the ______. Inspected and tested. Use permit, commissioner Periodic Inspections: All boilers must be inspected at least _____ a _____ including chimney connections. Once a year Owners Annual Statement: The owner of each boiler shall file an _____ written statement with the ________, specifying the _____of each boiler and ______ for inspection. Annual, commissioner, location, arrangement. Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by the ______ before the system is operated. Hydrostatically, contractor The piping shall be tested at _____ times the max working pressure applicable to that part of the piping system but at a pressure ____ than the test pressure required for the storage tank. 1/2, less The min pressure for testing tanks shall be ____ times the max working pressure but in no case less than ____ psi. 1 1/2, 25 psi

Content preview

P-99 Low Pressure Boiler COF FDNY – Certificate
of Fitness Test Prep & Study Guide

Save




Practice questions for this set


Learn 1 /7 Study using Learn




100, preheaters, 180



Choose an answer



1 A fill line in an oil burner system is a line used to:



The hydrostatic pressure must be maintained until all ____ and _____ have been visually
2
inspected for ___, but in no case less than _____ hour.



During operation the surface of combustible construction materials will not be raised
3
to a temp higher than _____ degrees F.

, The storage temp range for oil is about ____degrees F. The use of _____ help it to be
4 pumped to the oil burning unit. The fuel oil is raised to about ____ degrees before it
enters the combustion process.



Don't know?


Terms in this set (103)


A fill line in an oil burner Fill the storage tank with oil.
system is a line used to:

The aquastat is located Below the water line.

All heating, combustion, Combustible
and cooking equipment
shall be installed with
adequate clearances from
_______ construction.

The equipment must be Insulation.
provided with ______ or the Fire Protected
building construction shall
be _____ _____.

During operation the 170 degrees
surface of combustible
construction materials will
not be raised to a temp
higher than _____ degrees F.

Equipment shall be so that Hazardous
the means of access for
ordinary operation and
maintenance will not be
_______.

, Acceptance Tests: Inspected and tested.
Boilers shall not be placed Use permit, commissioner
in operation until they
have been _____ and ____
and an equipment ____ _____
has been issued by the
______.

Periodic Inspections: All Once a year
boilers must be inspected
at least _____ a _____
including chimney
connections.

Owners Annual Statement: Annual, commissioner, location, arrangement.
The owner of each boiler
shall file an _____ written
statement with the ________,
specifying the _____of each
boiler and ______ for
inspection.

Field Tests: all piping and Hydrostatically, contractor
oil storage tanks shall be
_______ tested for tightness
by the ______ before the
system is operated.

The piping shall be tested 1/2, less
at _____ times the max
working pressure
applicable to that part of
the piping system but at a
pressure ____ than the test
pressure required for the
storage tank.

Document information

Uploaded on
October 8, 2025
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$20.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
7
Followers
0
Items
128
Last sold
2 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions