QSP/QSD QUESTIONS AND ANSWERS

Institución
QSP/QSD
Grado
QSP/QSD









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
QSP/QSD
Grado
QSP/QSD

Información del documento

Subido en
30 de septiembre de 2025
Número de páginas
9
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

QSP/QSD QUESTIONS AND ANSWERS

What 4 distinct phases of construction activities does the General Permit Recognize -
Answer -Grading and Land Development
Streets and Utilities
Vertical Construction
Final Landscaping and site Stabilization

Any construction or demolition activity, including, but not limited to, clearing, grading,
grubbing, or excavation, or any other activity that results in a land DISTURBANCE of
equal to or greater than ___ acre - Answer -1

LUPs - Answer -Linear Underground/Overhead Utility Projects

What is the primary federal law governing storm water pollution and regulation -
Answer -Clean Water Act

The person in charge of the utility company, municipality, or other public or private
company or agency that owns or operates the ____ may also serve as the LRP -
Answer -LUP

Visual Monitoring is required for... - Answer -All sites subject to this General Permit

Records are required to remain onsite during the construction period for a minimum of
___ - Answer -3 Years

When does Risk Level 1 site have to sample? - Answer -When required for non-visible
pollutants

When would receiving water monitoring occur? - Answer -Effluent that exceeds the
receiving water monitoring triggers contained in the GP and with direct discharges to
receiving water

When would bioassessment sampling take place? - Answer -RISK level 3 and LUP
Type 3 Sites larger than 30 acres and with direct discharges to receiving waters. (before
and after sire completion)

Where do records need to be available? - Answer -At the construction site until
construction is complete. LUPs may be retained in a crew members vehicle and made
available upon request

ATS - Answer -Active Treatment Systems

What do ATS do? - Answer -Add chemicals to facilitate flocculation, coagulation and
filtration of suspended sediment particles. Measured by NELs

, When does risk level 1 site have to sample - Answer -When required for non-visible
pollutants

Which construction activity is not covered under the CGP - Answer -Routine
maintenance to maintain original line and grade, hydraulic capacity, or original purpose
of the facility

When is the primary federal law governing storm water pollution and regulation? -
Answer -Clean Water Act

The LRP's (Legally Responsible Person) approved signatory must be: - Answer -
Corporation - A responsible corporate officer
Partnership/sole proprietorship - general partner/proprietor
Municipality/State/federal/public agency
Military

During a routine inspection a LUP discharger observes a non-storm water discharge
and therefore must prepare a non-storm water report - Answer -?

if required, when should Risk Level 1 sites conduct discharge sampling - Answer -
During business hours

Regional Water boards are responsible for____ - Answer -Implementation and
enforcement of the General Permit. Have some flexibility and authority to alter, approve,
exempt, or rescind permit.

LRP - Answer -Legally Responsible Person

What does the LRP do? - Answer -Obtain coverage by electrinically filing Permit
Registration Documents (PRDs) prior to construction

PDRs Consist of - Answer -Notice of Intent (NOI)
Risk Assessment
Site Map
SWPPP
Annual Fee
Signed Certification Statement

Small Construction Rainfall Erosivity Waiver - Answer -Applies to sites between 1 - 5
acres demonstrating that thee are not adverse water quality impacts

Discharges eligible for Rainfall Erosivity Waiver must take place during a period when
the value is the rainfall erosivity factor is less than___ - Answer -5
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA YALA UNIVERSITY
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2009
Miembro desde
3 año
Número de seguidores
1447
Documentos
48320
Última venta
1 día hace

3.8

345 reseñas

5
172
4
61
3
44
2
16
1
52

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes