100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

QSP/QSD QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
30-09-2025
Written in
2025/2026

QSP/QSD QUESTIONS AND ANSWERS

Institution
QSP/QSD
Module
QSP/QSD

Content preview

QSP/QSD QUESTIONS AND ANSWERS

What 4 distinct phases of construction activities does the General Permit Recognize -
Answer -Grading and Land Development
Streets and Utilities
Vertical Construction
Final Landscaping and site Stabilization

Any construction or demolition activity, including, but not limited to, clearing, grading,
grubbing, or excavation, or any other activity that results in a land DISTURBANCE of
equal to or greater than ___ acre - Answer -1

LUPs - Answer -Linear Underground/Overhead Utility Projects

What is the primary federal law governing storm water pollution and regulation -
Answer -Clean Water Act

The person in charge of the utility company, municipality, or other public or private
company or agency that owns or operates the ____ may also serve as the LRP -
Answer -LUP

Visual Monitoring is required for... - Answer -All sites subject to this General Permit

Records are required to remain onsite during the construction period for a minimum of
___ - Answer -3 Years

When does Risk Level 1 site have to sample? - Answer -When required for non-visible
pollutants

When would receiving water monitoring occur? - Answer -Effluent that exceeds the
receiving water monitoring triggers contained in the GP and with direct discharges to
receiving water

When would bioassessment sampling take place? - Answer -RISK level 3 and LUP
Type 3 Sites larger than 30 acres and with direct discharges to receiving waters. (before
and after sire completion)

Where do records need to be available? - Answer -At the construction site until
construction is complete. LUPs may be retained in a crew members vehicle and made
available upon request

ATS - Answer -Active Treatment Systems

What do ATS do? - Answer -Add chemicals to facilitate flocculation, coagulation and
filtration of suspended sediment particles. Measured by NELs

, When does risk level 1 site have to sample - Answer -When required for non-visible
pollutants

Which construction activity is not covered under the CGP - Answer -Routine
maintenance to maintain original line and grade, hydraulic capacity, or original purpose
of the facility

When is the primary federal law governing storm water pollution and regulation? -
Answer -Clean Water Act

The LRP's (Legally Responsible Person) approved signatory must be: - Answer -
Corporation - A responsible corporate officer
Partnership/sole proprietorship - general partner/proprietor
Municipality/State/federal/public agency
Military

During a routine inspection a LUP discharger observes a non-storm water discharge
and therefore must prepare a non-storm water report - Answer -?

if required, when should Risk Level 1 sites conduct discharge sampling - Answer -
During business hours

Regional Water boards are responsible for____ - Answer -Implementation and
enforcement of the General Permit. Have some flexibility and authority to alter, approve,
exempt, or rescind permit.

LRP - Answer -Legally Responsible Person

What does the LRP do? - Answer -Obtain coverage by electrinically filing Permit
Registration Documents (PRDs) prior to construction

PDRs Consist of - Answer -Notice of Intent (NOI)
Risk Assessment
Site Map
SWPPP
Annual Fee
Signed Certification Statement

Small Construction Rainfall Erosivity Waiver - Answer -Applies to sites between 1 - 5
acres demonstrating that thee are not adverse water quality impacts

Discharges eligible for Rainfall Erosivity Waiver must take place during a period when
the value is the rainfall erosivity factor is less than___ - Answer -5

Written for

Institution
QSP/QSD
Module
QSP/QSD

Document information

Uploaded on
September 30, 2025
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
View profile
Follow You need to be logged in order to follow users or courses
Sold
2046
Member since
4 year
Number of followers
1446
Documents
50918
Last sold
5 hours ago

3.8

352 reviews

5
177
4
61
3
45
2
16
1
53

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions