CQM 6.4 UPDATED ACTUAL Questions and CORRECT Answers
If tests are not performed properly, there are many con-
struction procedures and materials that cannot be con-
Importance of Testing
firmed as adequate. Visual observation alone is
insuflcient.
The contractor performs quality control (QC) testing to de-
Types of Tests termine whether construction procedures and materials
are producing the desired contractual product.
The contractor must outline proposed "testing proce-
dures" as defined in Section 01 45 00.00 10 and/or Sec-
tion 01 45 00.00 20 in the QC Plan. These proposed pro-
cedures must be discussed at the Coordination Meeting
or the Mutual Understanding Meeting.
The contractor must provide a list of required control tests
and specify whether
Procedures the tests are to be performed by an independent, ap-
proved testing laboratory, or
using their own personnel and facilities.
Regardless of which method of testing the contractor uses,
they are required to
assure that specified laboratory procedures are used and
that laboratory facilities
are certified.
are unannounced sporadic tests that repeat QC tests. QA
testing can be performed
by:
QA tests • Government personnel using the contractor's equip-
ment and facilities,
• An independent testing laboratory, or
• A field oflce, district, or division government laboratory.
Before testing begins, the following questions should be
answered and verified against the approved QC Plan
If tests are not performed properly, there are many con-
struction procedures and materials that cannot be con-
Importance of Testing
firmed as adequate. Visual observation alone is
insuflcient.
The contractor performs quality control (QC) testing to de-
Types of Tests termine whether construction procedures and materials
are producing the desired contractual product.
The contractor must outline proposed "testing proce-
dures" as defined in Section 01 45 00.00 10 and/or Sec-
tion 01 45 00.00 20 in the QC Plan. These proposed pro-
cedures must be discussed at the Coordination Meeting
or the Mutual Understanding Meeting.
The contractor must provide a list of required control tests
and specify whether
Procedures the tests are to be performed by an independent, ap-
proved testing laboratory, or
using their own personnel and facilities.
Regardless of which method of testing the contractor uses,
they are required to
assure that specified laboratory procedures are used and
that laboratory facilities
are certified.
are unannounced sporadic tests that repeat QC tests. QA
testing can be performed
by:
QA tests • Government personnel using the contractor's equip-
ment and facilities,
• An independent testing laboratory, or
• A field oflce, district, or division government laboratory.
Before testing begins, the following questions should be
answered and verified against the approved QC Plan