Which phase commitments sets the stage for Integrated Project Leadership and Design-Build Process
Control? - - correct answer✨✔✔ Proposal Phase Commitments
The Construction process is _____ while the design process is ______. - - correct answer✨✔✔ -
sequential
- iterative
_____ problem solving is what creates the opportunity to optimize the project. - - correct answer✨✔✔
Integrated
Create and _____ a culture for success - - correct answer✨✔✔ Sustain
_____ _____ _______ create a shared vision of project success. - - correct answer✨✔✔ Team
Alignment Sessions
Commitment to Project goals promotes team _____ and _____. - - correct answer✨✔✔ - integration
- cohesion
Proximity leads to _____ -- the power of overhearing. - - correct answer✨✔✔ communication
Communication leads to __________ -- promotes common knowledge. - - correct answer✨✔✔
understanding
Understanding leads to _____ -- interdisciplinary fluency develops One Team. - - correct answer✨✔✔
respect
,_____ fosters cohesion -- one team acts as one team - - correct answer✨✔✔ Respect
Joint execution planning drives early _____-_____. - - correct answer✨✔✔ decision-making
What are the 4 DB Team Integration roles? - - correct answer✨✔✔ 1. Integrated Project Leader (DB -
PM).
2. Designer of Record (A/E).
3. Design Manager.
4. Estimator (A/E).
Who leads the project team and manages team dynamics?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - - correct answer✨✔✔ a) Integrated Project Leader
Who balances the Owner's needs plus design and construction?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - - correct answer✨✔✔ a) Integrated Project Leader
Who is licensed to protect the health, safety and welfare of the public?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
, d) Estimator - - correct answer✨✔✔ b) Designer of Record
Who leads the overall design effort or design and engineering of a specific discipline?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - - correct answer✨✔✔ b) Designer of Record
Who facilitates "Marriage" between design professionals and cost estimators?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - - correct answer✨✔✔ c) Design Manager
Who advocates for design excellence within the DB team?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - - correct answer✨✔✔ c) Design Manager
Who manages design information flow & deliverables?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
PRACTICE QUESTIONS AND ANSWERS 100%
VERIFIED
Which phase commitments sets the stage for Integrated Project Leadership and Design-Build Process
Control? - - correct answer✨✔✔ Proposal Phase Commitments
The Construction process is _____ while the design process is ______. - - correct answer✨✔✔ -
sequential
- iterative
_____ problem solving is what creates the opportunity to optimize the project. - - correct answer✨✔✔
Integrated
Create and _____ a culture for success - - correct answer✨✔✔ Sustain
_____ _____ _______ create a shared vision of project success. - - correct answer✨✔✔ Team
Alignment Sessions
Commitment to Project goals promotes team _____ and _____. - - correct answer✨✔✔ - integration
- cohesion
Proximity leads to _____ -- the power of overhearing. - - correct answer✨✔✔ communication
Communication leads to __________ -- promotes common knowledge. - - correct answer✨✔✔
understanding
Understanding leads to _____ -- interdisciplinary fluency develops One Team. - - correct answer✨✔✔
respect
,_____ fosters cohesion -- one team acts as one team - - correct answer✨✔✔ Respect
Joint execution planning drives early _____-_____. - - correct answer✨✔✔ decision-making
What are the 4 DB Team Integration roles? - - correct answer✨✔✔ 1. Integrated Project Leader (DB -
PM).
2. Designer of Record (A/E).
3. Design Manager.
4. Estimator (A/E).
Who leads the project team and manages team dynamics?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - - correct answer✨✔✔ a) Integrated Project Leader
Who balances the Owner's needs plus design and construction?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - - correct answer✨✔✔ a) Integrated Project Leader
Who is licensed to protect the health, safety and welfare of the public?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
, d) Estimator - - correct answer✨✔✔ b) Designer of Record
Who leads the overall design effort or design and engineering of a specific discipline?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - - correct answer✨✔✔ b) Designer of Record
Who facilitates "Marriage" between design professionals and cost estimators?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - - correct answer✨✔✔ c) Design Manager
Who advocates for design excellence within the DB team?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - - correct answer✨✔✔ c) Design Manager
Who manages design information flow & deliverables?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager