SWPPP WALMART - STORMWATER EXAM WITH
ANSWERS 2025
Relative to stormwater permitting, all of the following must occur before
construction starts except:-correct-answer-Submit the notice of termination
(NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates
rainfall energy and slows overland flow of stormwater-correct-answer-Vegetation
Of the following factors that influence erosion rates, the one a contractor has the
most control over is:-correct-answer-Groundcover
Temporary stabilization should be implemented-correct-answer-Immediately on
all disturbed areas that are likely to or will remain inactive for 14-days or more
The Primary purpose of a construction exit is-correct-answer-To remove sediment
from construction site vehicles and minimize trackout
, 2|Page
Common types of erosion include all of the following except-correct-answer-
Sedimentation
Which of the following is NOT a beneficial use of water?-correct-answer-Flushing
a spill down a storm drain
When installing and maintaining a check dam make sure:-correct-answer-The low
point (overflow) of the check dam is in the middle of the channel
To reduce the possibility of undercutting in channels, you should:-correct-answer-
Install filter fabric under rock and similar materials placed within the stormwater
The good housekeeping section of the SWPPP must include all BUT which of the
following-correct-answer-Post construction stormwater management procedures
Runoff Controls include all but which one of the following-correct-answer-Rolled
Erosion Control Products