Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 517 pages
Exam (elaborations)

Solutions Manual Contemporary Engineering Economics 7th Edition By Chan Park

Document preview thumbnail
Preview 4 out of 517 pages

Solutions Manual Contemporary Engineering Economics 7th Edition By Chan Park Solutions Manual Contemporary Engineering Economics 7th Edition By Chan Park

Content preview

Solutions Manual For
Contemporary Engineering
Economics 7th Edition By Chan
Park


(All Chapters 1-16, 100%
Original Verified, A+ Grade)


All Chapters Arranged Reverse:
16-1
This is The Original Solutions
Manual For 7th Edition, All
other Files in The Market are
Fake/Old/Wrong Edition.

,Contemporary Engineering Economics, 7th ed. ©2023


Chapter 16 Economic Analysis in the Service Sector

Valuation of Benefits and Costs
16.1
(a) • User’s benefits:

- Prevention (or retardation) of highway corrosion: resulting in lower highway
maintenance cost. This lower maintenance cost implies lower users’ taxes
on gasoline, and so forth.
- Prevention of rust on vehicles: resulting in lower repair and maintenance
costs and higher resale value of vehicles.
- Prevention of corrosion to utility lines and damages to water supplies:
resulting in lower utility rates.
- Prevention of damages to vegetation and soil surrounding areas: increasing
land values and agriculture yields.

• Sponsor’s costs:

- Paying a higher tax.
- Unknown environmental damages due to using CMA

(b) The state of Michigan may declare certain sections of highway for
experimental purpose. CMA may be used exclusively for a designated area
and road salts for another area for an extended period time. Then, it
investigates the impact of CMA on vegetation yields, which can be compared
with those of areas from road salt use. The difference in vegetation yields may
be quantified in terms of market value, and so forth.


16.2
Open end question (Not provided)


16.3
Open end question (Not provided)




1
Copyright © 2023 Pearson Education, Inc.

,Contemporary Engineering Economics, 7th ed. ©2023


Benefit-Cost Analysis

16.4

B = $117, 400( P / A, 6%,5)
= $494,535.76
C = $5, 000 + $48,830( P / A, 6%,5)
= $210, 691.49

$494,535.76
BC(6%) =
$210, 691.49
= 2.35 > 1
This project is justifiable based on the benefit-cost analysis.


16.5

B = $250, 000( P / A, 6%, 25) + $50, 000( P / F , 6%, 25)
= $3, 207,500
C = $1, 200, 000 + $100, 000( P / A, 6%, 25)
= $2, 478,340

$3, 207,500
BC(6%) =
$2, 478,340
= 1.29 > 1

16.6

B = $786,000( P / A,8%,15) + $200,000( P / F,8%,15)
= $6,790,799
C ′ = $233,000( P / A,8%,15)
= $1,994,359
I = $2,500,000

Thus, the net savings per dollar invested is:

$6,790,799
BC(8%) = = 1.51
$2,500, 000 + $1,994,359




2
Copyright © 2023 Pearson Education, Inc.

, Contemporary Engineering Economics, 7th ed. ©2023


16.7

(a) BC(i) analysis:

• Design A:

I = $400, 000
C ' = $50, 000( P / A,8%,15) = $427,974
B = $85, 000( P / A,8%,15) = $727,556

• Design B:

I = $300, 000
C ' = $80, 000( P / A,8%,15) = $684, 758
B = $85, 000( P / A,8%,15) = $727,556

• Incremental analysis: Fee collections in the amount of $85,000 will be the
same for both alternatives. Therefore, we will not be able to compute the
BC (i ) ratio. If this happens, we may select the best alternative based on either
the least cost ( I + C ' ) criterion or the incremental PI(i ) criterion. Using the
incremental PI(i ) criterion,

ΔB − ΔC ' 0 − ($427,974 − $684, 758)
PI(8%) A− B = = = 2.57 > 1
ΔI $100, 000
∴Select design A.

(b) Incremental analysis (A – C):

ΔB − ΔC ' 0 − ($427,974 − $556,366)
PI(8%) A−C = = = 2.57 > 1
ΔI $50, 000
∴Select design A.




3
Copyright © 2023 Pearson Education, Inc.

Connected book
 image
Publisher: 2022 ISBN: 9780137633302 Edition: Unknown

Document information

Uploaded on
September 20, 2025
Number of pages
517
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$30.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
tutorsection
4.5
(1064)
Sold
8303
Followers
3257
Items
6104
Last sold
3 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions