Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 28 pages
Exam (elaborations)

Final Estimates Level 1 EXAM WITH QUESTIONS AND WELL DETAILED ANSWERS|| GRADED A+||LATEST UPDATE 2025/26

Document preview thumbnail
Preview 3 out of 28 pages

Final Estimates Level 1 EXAM WITH QUESTIONS AND WELL DETAILED ANSWERS|| GRADED A+||LATEST UPDATE 2025/26

Content preview

Final Estimates Level 1 EXAM WITH QUESTIONS AND
WELL DETAILED ANSWERS|| GRADED A+||LATEST
UPDATE 2025/26

T/F: A major function of the DOT is to carry out Construction and Reconstruction

programs to provide the public with adequate transportation service. -

CORRECTANSWER True



For DOT management of construction and reconstruction projects includes the following

specific responsibilities:

A. Planning, Programming, and Design

B. Contract Administrations

C. Contractor Payments

D. Design and Contract Management

E. All of the above -CORRECTANSWER E. All of the above



T/F: To pay for work performed by contractors, progress and Final Estimates are

needed? -CORRECTANSWER True



Which of the following is not officially considered a "Contract Document"?

A. Supplemental Agreements and Work Orders

B. Notebooks and Estimates Procedure Manual.

C. Standard Specifications.

D .Construction Manual.

,E. CORRECTANSWERs B & D. -CORRECTANSWER E. CORRECTANSWERs B & D.



Between printings of the Standard Specifications, what does the Department publish to

identify and describe changes in the Specifications?

A. CPAM

B. Supplemental Specifications

C. Work Orders

D. Specification Changes -CORRECTANSWER B. Supplemental Specifications



Select the correct sequence of documents in order of precedence, with the document

highest in authority listed first.

A. Contract Plans, Development Specifications, Standard Specifications, Special

Provisions, Technical Special Provisions, Supplemental Specifications, Design

Standards.

B. Design Standards, Special Provisions, Technical Special Provisions, Supplemental

Specifications, Contract Plans, development Specifications, Standard Specifications.

C. Special Provisions, Technical Special Provisions, Contract Plans, Design Standards,

Development Specifications, Supplemental Specifications, Standard Specifications.

D. Supplemental Specifications, Special Provisions, Contract Plans, Development

Specifications, Standards Specifications, Technical Special Provisions, Design

Standards.

, E. None of the above. -CORRECTANSWER C. Special Provisions, Technical Special

Provisions, Contract Plans, Design Standards, Development Specifications,

Supplemental Specifications, Standard Specifications.



True or False. When checked and verified, final estimates serve as the basis for Final

Payment. -CORRECTANSWER True



Which of the following sets for the Department's methods and Procedures for preparing

and checking final estimates?



A. Construction Inspection Mathematics

B. Project Engineer

C. Preparation and Documentation Manual

D. CPAM -CORRECTANSWER C. Preparation and Documentation Manual



Please match the appropriate documentation name with the correct description below:

A. [Final Plans]: For reviewing contract time charges before clearing estimates for final

payment; [Computation Books]: Documents pertinent changes during construction and

show the "as-built' condition; [Field Books]: Contains alignment notes and cross section

notes, etc.

B. [Construction Diaries]: For reviewing contract time charges before clearing estimates

for final payment; [Final Plans]: Documents pertinent changes during construction and

Document information

Uploaded on
September 19, 2025
Number of pages
28
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$23.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PrepPulse1
4.3
(30)
Sold
289
Followers
6
Items
4056
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions