Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

CTQP Final Estimates Level 1 QUESTIONS AND WELL DETAILED ANSWERS|| GRADED A+|| LATEST UPDATE 2025/26

Document preview thumbnail
Preview 2 out of 13 pages

CTQP Final Estimates Level 1 QUESTIONS AND WELL DETAILED ANSWERS|| GRADED A+|| LATEST UPDATE 2025/26

Content preview

CTQP Final Estimates Level 1 QUESTIONS AND WELL
DETAILED ANSWERS|| GRADED A+|| LATEST UPDATE
2025/26


1) A major function of the DOT is to carry out Construction and Reconstruction

programs to provide the public with adequate transportation service. -

CORRECTANSWER True



For the DOT, the management of Construction and reconstruction projects involves the

following specific responsibilities:

A. Planning, Programming and design

B. Contract administration

C. Contractor payments

D. Design and Contract Management

E. All of the above -CORRECTANSWER E. All of the above



3) To pay for the work performed by Contractors, progress and Final Estimates are

needed. True or False? -CORRECTANSWER True



DESIGN STANDARDS -CORRECTANSWER These standards are made available for

Design, Construction, Maintenance, and Utility operations on the State Highway

System. This booklet provides guidelines and technical drawings for design and

Construction personnel.

, SUPPLEMENTAL AGREEMENTS (SA) -CORRECTANSWER SA'S are work of a

different characteristic from that shown in the original plans and contract; such as to

clarify the Specifications, or pay for unforeseen work.



WORK ORDERS (WO) -CORRECTANSWER WO's are similar to SA's but can't be

used in all instances. They are used to include additional work into the original contract,

and to do minor changes.



JOINT PARTICIPATION AGREEMENTS (JPA) -CORRECTANSWER JPA's or Locally

Funded Agreements (LFA)'s are part of the State Contract with a separate Financial ID

Number. They are legal documents between the Department and other government or

private entities. The work would be a utility relocations or installations, etc.



1) Multiple choice. Which of the following is NOT officially considered to be a "Contract

Document"?

A. Supplemental Agreements and Work Orders.

B. Notebooks and Estimates Procedure Manual.

C. Standard Specifications.

D. Construction Manual.

E. CORRECTANSWERs B &D -CORRECTANSWER E. CORRECTANSWER B & D

Document information

Uploaded on
September 19, 2025
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$22.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PrepPulse1
4.3
(30)
Sold
292
Followers
6
Items
4102
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions