ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
ExAC Section 3 (Theme 8) - The
Final Project questions & answers
100% verified.
Correct
Incorrect
Glulam beams
[Type here]
ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
,ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
(8.2.5)
1.) Air space width - greater width increases STC
2.) Stud spacing - larger spacing increases STC
3.) Mass
4.) Layers of GWB
5.) Stud type
6.) Penetrations - seal
(8.3.1.)
1.) Regional snow loads
2.) Wood species
3.) Grade and size
4.) Spacing
5.) Lateral support (strapping, blocking, bridging)
(8.3.7)
1.) Solid brick walls - 50mm
2.) Brick veneer walls - 25mm
3.) Wood framed drainage cavities - 19mm
(8.2.3)
Don't know?
2 of 78
Term
In the concealed space of a wall, what is the maximum allowable
[Type here]
ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
,ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
horizontal and vertical distance between fire blocks?
[Type here]
ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
, ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
Give this one a go later!
1.) Deflection
Requires reinforcing to resist tensile 2.) Drainage
and shear stresses 3.) Drying
4.) Durability
(8.1.2)
(8.2.3)
Yes, they should be vented to allow Max horizontal distance: 20m
moisture to escape. Max vertical distance: 3m
(8.3.5) (8.3.2)
Don't know?
3 of 78
Term
What are the three main components of the Bidding documents?
Give this one a go later!
Portland cement
1.) Project manual
Water
2.) Drawings
Aggregates
3.) Addenda
Admixtures
(8.4.1)
(8.1.2)
[Type here]
ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
ExAC Section 3 (Theme 8) - The
Final Project questions & answers
100% verified.
Correct
Incorrect
Glulam beams
[Type here]
ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
,ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
(8.2.5)
1.) Air space width - greater width increases STC
2.) Stud spacing - larger spacing increases STC
3.) Mass
4.) Layers of GWB
5.) Stud type
6.) Penetrations - seal
(8.3.1.)
1.) Regional snow loads
2.) Wood species
3.) Grade and size
4.) Spacing
5.) Lateral support (strapping, blocking, bridging)
(8.3.7)
1.) Solid brick walls - 50mm
2.) Brick veneer walls - 25mm
3.) Wood framed drainage cavities - 19mm
(8.2.3)
Don't know?
2 of 78
Term
In the concealed space of a wall, what is the maximum allowable
[Type here]
ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
,ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
horizontal and vertical distance between fire blocks?
[Type here]
ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
, ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.
Give this one a go later!
1.) Deflection
Requires reinforcing to resist tensile 2.) Drainage
and shear stresses 3.) Drying
4.) Durability
(8.1.2)
(8.2.3)
Yes, they should be vented to allow Max horizontal distance: 20m
moisture to escape. Max vertical distance: 3m
(8.3.5) (8.3.2)
Don't know?
3 of 78
Term
What are the three main components of the Bidding documents?
Give this one a go later!
Portland cement
1.) Project manual
Water
2.) Drawings
Aggregates
3.) Addenda
Admixtures
(8.4.1)
(8.1.2)
[Type here]
ExAC Section 3 (Theme 8) - The Final Project questions & answers 100% verified.