100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

RWP TRAINING (SOLVED) CORRECTLY TO PASS!!

Rating
-
Sold
-
Pages
50
Grade
A+
Uploaded on
17-09-2025
Written in
2025/2026

RWP TRAINING (SOLVED) CORRECTLY TO PASS!!

Institution
RWP
Course
RWP











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
RWP
Course
RWP

Document information

Uploaded on
September 17, 2025
Number of pages
50
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

RWP TRAINING (SOLVED) CORRECTLY
TO PASS!!




1 of 74

Definition



The authority issued to the RWIC by ROCC to control specific
working limits. A physical barrier is used to render the track
inaccessible to rail vehicle movement into the working limits.



Give this one a try later!



Roadway Maintenance Machine
Inaccessible Track (IT)
(RMM)

, Exclusive Track Occupancy(ETO) Mainline Track


Don't know?




2 of 74

Definition



A signal given by the motion or position of a person's
hand and arm. A light shall be used in areas of low
visibility.



Give this one a try later!



Stop Signal Hand Signal




Voice Signal Audible Signal


Don't know?




3 of 74

Definition



A segment of track with defined boundaries established in
accordance with the rules. The RWIC is the only authorized
individual to permit the movement of trains and track
equipment through the working limits



Give this one a try later!

, Working limits Foul time




Yard limits No clearance


Don't know?




4 of 74

Definition



A device which performs the mechanical function of
controlling the movement of switch points or a derail from
one position to the other. The Machine may be operated
electrically or manually



Give this one a try later!



Mainline Track Roadway Worker




Hi Rail Vehicle Switch Machine


Don't know?




5 of 74

Definition



A person with the authority for controlling mainline
operations

, Give this one a try later!



Designee Contractor




Router Controller


Don't know?




6 of 74

Definition



A segment of track with defined boundaries established in
accordance with the rules. The RWIC is the only authorized
individual to perit the movement of trains and tack
equipment through the working limits



Give this one a try later!



Yard limits Working limits




No clearance Block limit


Don't know?




7 of 74

Definition

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EvaTee Phoenix University
View profile
Follow You need to be logged in order to follow users or courses
Sold
4972
Member since
4 year
Number of followers
3554
Documents
50725
Last sold
18 hours ago
TIGHT DEADLINE? I CAN HELP

Many students don\'t have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don\'t hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded

3.9

907 reviews

5
434
4
160
3
164
2
45
1
104

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions