PJM Generator Exam Question and answers correctly solved 2025/2026 The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and at full output _________ - correct answer immediately upon receipt of dispatch instruction A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation Operators should: - correct answer Ensure all unit voltage regulators are in service PJM can issue the Deploy All Resources Action for________ - correct answer the entire RTO, specific Control Zones or a subset of a Control Zone if transmission limitations exist Under the National Terrorism Advisory System (NTAS) there are 2 types of alerts: Elevated Threat Alert and __________. - correct answer Imminent Threat Alert A Geomagnetic Disturbance Warning is issued by PJM when the NOAA has issued a warning or an alert for a potential geo-magnetic storm of severity _______ or greater. - correct answer K7 The Generating Capacity reported on a Supplementary Status Report (SSR) includes which of the following? (Select 2) - correct answer Capacity from offline Hydro and CT units that can be synchronized within 10 minutes. Total Capacity from online Generation.

Content preview

PJM Generator Exam Question and
answers correctly solved 2025/2026
The purpose of the Deploy All Resources Action is to instruct all generating
resources to be on line and at full output _________ - correct answer
✔immediately upon receipt of dispatch instruction


A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO.
Generation Operators should: - correct answer ✔Ensure all unit voltage
regulators are in service


PJM can issue the Deploy All Resources Action for________ - correct
answer ✔the entire RTO, specific Control Zones or a subset of a Control
Zone if transmission limitations exist


Under the National Terrorism Advisory System (NTAS) there are 2 types of
alerts: Elevated Threat Alert and __________. - correct answer ✔Imminent
Threat Alert


A Geomagnetic Disturbance Warning is issued by PJM when the NOAA has
issued a warning or an alert for a potential geo-magnetic storm of severity
_______ or greater. - correct answer ✔K7


The Generating Capacity reported on a Supplementary Status Report (SSR)
includes which of the following? (Select 2) - correct answer ✔Capacity from
offline Hydro and CT units that can be synchronized within 10 minutes.
Total Capacity from online Generation.


What is the requested response time for members to reply to a request for
SSR data? - correct answer ✔10 Minutes

, If a PJM Member has received reports of a terrorism or sabotage threat to
their facilities, they would notify whom at PJM (in addition to NERC and the
DOE) to share this information? - correct answer ✔The PJM Shift Supervisor


What is the purpose of a capacity emergency warning? (Select 2) - correct
answer ✔To keep Members informed of actual capacity shortages or
contingencies that may jeopardize reliability during real time operations. To
ask Members to take specific actions in order to provide relief to the PJM
system


PJM has issued a Minimum Generation Alert. Your current generation output
is 200 MW. The Economic Minimum is 150 MW and Emergency Minimum is
125 MW. How much ERG should be reported for this unit? - correct answer
✔25 MW


A Manual Load Dump Warning will be issued when: - correct answer
✔Primary Reserve is less than the largest generating unit or the loss of a
transmission facility jeopardizes reliability after all possible measures have
been taken to increase reserves


Actions in a Low Voltage Alert include: (Select 2) - correct answer ✔Request
a Reactive Reserve Check
Review transmission and generation outages


Which entities can cancel generator reactive capability tests prior to or during
the testing process? (Select 2) - correct answer ✔PJM and the affected TO


With whom does PJM share the results of generation reactive capability tests?
- correct answer ✔The affected TO

Document information

Uploaded on
September 16, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Academia199
3.9
(53)
Sold
377
Followers
209
Items
20099
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions