The purpose of the Deploy All Resources Action is to instruct all generating
resources to be on line and at full output _________ - (ANSWER)immediately
upon receipt of dispatch instruction
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO.
Generation Operators should: - (ANSWER)Ensure all unit voltage regulators are in
service
PJM can issue the Deploy All Resources Action for________ - (ANSWER)the entire
RTO, specific Control Zones or a subset of a Control Zone if transmission
limitations exist
Under the National Terrorism Advisory System (NTAS) there are 2 types of alerts:
Elevated Threat Alert and __________. - (ANSWER)Imminent Threat Alert
A Geomagnetic Disturbance Warning is issued by PJM when the NOAA has issued
a warning or an alert for a potential geo-magnetic storm of severity _______ or
greater. - (ANSWER)K7
The Generating Capacity reported on a Supplementary Status Report (SSR)
includes which of the following? (Select 2) - (ANSWER)Capacity from offline
Hydro and CT units that can be synchronized within 10 minutes.
Total Capacity from online Generation.
, 2
What is the requested response time for members to reply to a request for SSR
data? - (ANSWER)10 Minutes
If a PJM Member has received reports of a terrorism or sabotage threat to their
facilities, they would notify whom at PJM (in addition to NERC and the DOE) to
share this information? - (ANSWER)The PJM Shift Supervisor
What is the purpose of a capacity emergency warning? (Select 2) - (ANSWER)To
keep Members informed of actual capacity shortages or contingencies that may
jeopardize reliability during real time operations. To ask Members to take specific
actions in order to provide relief to the PJM system
PJM has issued a Minimum Generation Alert. Your current generation output is
200 MW. The Economic Minimum is 150 MW and Emergency Minimum is 125
MW. How much ERG should be reported for this unit? - (ANSWER)25 MW
A Manual Load Dump Warning will be issued when: - (ANSWER)Primary Reserve
is less than the largest generating unit or the loss of a transmission facility
jeopardizes reliability after all possible measures have been taken to increase
reserves
Actions in a Low Voltage Alert include: (Select 2) - (ANSWER)Request a Reactive
Reserve Check
Review transmission and generation outages
PJM Generator EXAM Questions & Answers | 100%
Verified solutions |Questions with Correct Answers
2025 latest update!!
The purpose of the Deploy All Resources Action is to instruct all generating
resources to be on line and at full output _________ - (ANSWER)immediately
upon receipt of dispatch instruction
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO.
Generation Operators should: - (ANSWER)Ensure all unit voltage regulators are in
service
PJM can issue the Deploy All Resources Action for________ - (ANSWER)the entire
RTO, specific Control Zones or a subset of a Control Zone if transmission
limitations exist
Under the National Terrorism Advisory System (NTAS) there are 2 types of alerts:
Elevated Threat Alert and __________. - (ANSWER)Imminent Threat Alert
A Geomagnetic Disturbance Warning is issued by PJM when the NOAA has issued
a warning or an alert for a potential geo-magnetic storm of severity _______ or
greater. - (ANSWER)K7
The Generating Capacity reported on a Supplementary Status Report (SSR)
includes which of the following? (Select 2) - (ANSWER)Capacity from offline
Hydro and CT units that can be synchronized within 10 minutes.
Total Capacity from online Generation.
, 2
What is the requested response time for members to reply to a request for SSR
data? - (ANSWER)10 Minutes
If a PJM Member has received reports of a terrorism or sabotage threat to their
facilities, they would notify whom at PJM (in addition to NERC and the DOE) to
share this information? - (ANSWER)The PJM Shift Supervisor
What is the purpose of a capacity emergency warning? (Select 2) - (ANSWER)To
keep Members informed of actual capacity shortages or contingencies that may
jeopardize reliability during real time operations. To ask Members to take specific
actions in order to provide relief to the PJM system
PJM has issued a Minimum Generation Alert. Your current generation output is
200 MW. The Economic Minimum is 150 MW and Emergency Minimum is 125
MW. How much ERG should be reported for this unit? - (ANSWER)25 MW
A Manual Load Dump Warning will be issued when: - (ANSWER)Primary Reserve
is less than the largest generating unit or the loss of a transmission facility
jeopardizes reliability after all possible measures have been taken to increase
reserves
Actions in a Low Voltage Alert include: (Select 2) - (ANSWER)Request a Reactive
Reserve Check
Review transmission and generation outages