The key purpose of the project plan is to:a. Get the project organized - ANSWERSGet the project organized The horizontal scale to be used for preparing the project drawings in urban areas as per CalTrans is: - ANSWERS1:50 The preferred lane width for two lane road shall be: - ANSWERS12 feet For roadways with three lanes or more sloped in the same direction the standard cross slope to be used for new construction on the traveled way for all types of surfaces shall be: - ANSWERS2.0% While planning for the cross slopes when the road crosses a bridge secction, the shoulders shall be: - ANSWERSIn the same plane as the adjacent travelled way. The minimum width specified for a 2-lane overcrossing structures shall be: - ANSWERSnot less than 32 feet, face of curb, to face of curb. The minimum horizontal clearance to walls, such as abutment walls, and retaining walls in cut locations shall____________ - ANSWERSNot less than 10 feet Minimum Vertical Clearance for Freeways and Expressways, Overlay projects shall be: - ANSWERS16 feet Concrete poured for curbs and sidewalks must contain____________pounds of cement material per cubic yard - ANSWERS463 lbs/cu yard. This concrete is minor concrete The specified spacing of construction joints for concrete curbs and sidewalks where there is no adjacent curb is________ - ANSWERS60' While executing a contract the Contractor must furnish the following document in writing - ANSWERSTest results In a unit-priced based bid contract the billing is based on - ANSWERSItems on which the work is done The contractor needs to submit the detailed cost data for a unit price adjustment for a bid item if - ANSWERSThe engineer requests the data. You request a unit price adjustment resulting from a change of more than 25% in the bid items quantity. There is a major change in scope. Critical Path Method is used to schedule the projects. This is the path along which all the project activities have - ANSWERS0 float For areas that require pavement smoothness determined using a 12 foot straightedge, the pavement surface must not vary from the lower edge of the straightedge by more than: - ANSWERS0.01' when the straightedge is laid parallel with the centerline. 0.02: when the straightedge is laid perpendicular to the centerline and extends from edge to edge of a traffic lane. 0.02' when the straightedge is lad within 24' of a pavement conform. Clearing and grubbing consists of removing objectionable material from - ANSWERSConstruction area Standards that are essential to produce a complete, concise and legal set of project plans are - ANSWERSMandatory (shall and must) Which are the factors used in determining the travel width? - ANSWERSTraffic, present and future. Number of lanes. Terrain The limiting axle load on a bridge with single axle pneumatic tired truck with trailer is - ANSWERS28,000 lbs A sign panel for a portable sign must comply with which of the following material specifications? - ANSWERSType VI, retroreflective, elastomeric roll-up fabric. Nonretroreflective, cotton, drill fabric. Nonretroreflective, flexible, industrial, nylon fabric. What is the diameter of the rebar if bar #16 is used - ANSWERS16x0.125=2.0" 2.0" Anchor bolts are generally used to connect the steel plates with concrete or masonry. The nominal diamter used for the anchor bolt is: - ANSWERS0.25" 1/4" Cost baseline refers to _ - ANSWERSThe approved time phased plan Historical cost estimate includes - ANSWERSE-base Bid Tabs Professional Unit Bid Analysis When preparing the projects Basis of Estimate, one should follow: - ANSWERSVisit the site. Review all the project design parameters Involve the team

Content preview

CA Contractors License Exam Prep
Questions with Accurate Answers

The key purpose of the project plan is to:a. Get the project organized - ANSWERSGet
the project organized

The horizontal scale to be used for preparing the project drawings in urban areas as per
CalTrans is: - ANSWERS1:50

The preferred lane width for two lane road shall be: - ANSWERS12 feet

For roadways with three lanes or more sloped in the same direction the standard cross
slope to be used for new construction on the traveled way for all types of surfaces shall
be: - ANSWERS2.0%

While planning for the cross slopes when the road crosses a bridge secction, the
shoulders shall be: - ANSWERSIn the same plane as the adjacent travelled way.

The minimum width specified for a 2-lane overcrossing structures shall be: -
ANSWERSnot less than 32 feet, face of curb, to face of curb.

The minimum horizontal clearance to walls, such as abutment walls, and retaining walls
in cut locations shall____________ - ANSWERSNot less than 10 feet

Minimum Vertical Clearance for Freeways and Expressways, Overlay projects shall be:
- ANSWERS16 feet

Concrete poured for curbs and sidewalks must contain____________pounds of cement
material per cubic yard - ANSWERS463 lbs/cu yard. This concrete is minor concrete

The specified spacing of construction joints for concrete curbs and sidewalks where
there is no adjacent curb is________ - ANSWERS60'

While executing a contract the Contractor must furnish the following document in writing
- ANSWERSTest results

In a unit-priced based bid contract the billing is based on - ANSWERSItems on which
the work is done

The contractor needs to submit the detailed cost data for a unit price adjustment for a
bid item if - ANSWERSThe engineer requests the data.

, You request a unit price adjustment resulting from a change of more than 25% in the bid
items quantity.
There is a major change in scope.

Critical Path Method is used to schedule the projects. This is the path along which all
the project activities have - ANSWERS0 float

For areas that require pavement smoothness determined using a 12 foot straightedge,
the pavement surface must not vary from the lower edge of the straightedge by more
than: - ANSWERS0.01' when the straightedge is laid parallel with the centerline.
0.02: when the straightedge is laid perpendicular to the centerline and extends from
edge to edge of a traffic lane.
0.02' when the straightedge is lad within 24' of a pavement conform.

Clearing and grubbing consists of removing objectionable material from -
ANSWERSConstruction area

Standards that are essential to produce a complete, concise and legal set of project
plans are - ANSWERSMandatory (shall and must)

Which are the factors used in determining the travel width? - ANSWERSTraffic, present
and future.
Number of lanes.
Terrain

The limiting axle load on a bridge with single axle pneumatic tired truck with trailer is -
ANSWERS28,000 lbs

A sign panel for a portable sign must comply with which of the following material
specifications? - ANSWERSType VI, retroreflective, elastomeric roll-up fabric.
Nonretroreflective, cotton, drill fabric.
Nonretroreflective, flexible, industrial, nylon fabric.

What is the diameter of the rebar if bar #16 is used - ANSWERS16x0.125=2.0" 2.0"

Anchor bolts are generally used to connect the steel plates with concrete or masonry.
The nominal diamter used for the anchor bolt is: - ANSWERS0.25" 1/4"

Cost baseline refers to _ - ANSWERSThe approved time phased plan

Historical cost estimate includes - ANSWERSE-base
Bid Tabs Professional
Unit Bid Analysis

When preparing the projects Basis of Estimate, one should follow: - ANSWERSVisit the
site.

Document information

Uploaded on
September 8, 2025
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
4
Followers
0
Items
1472
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions