Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

PJM Generation Test Q UPDATED ACTUAL Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 2 out of 13 pages

PJM Generation Test Q UPDATED ACTUAL Exam Questions and CORRECT Answers Real time transmission constraints or contingencies may be alleviated with generators operating A. below 60 Hz B. on a new price curve C. on a new cost curve D. off cost (out of merit) - CORRECT ANSWER D. off cost (out of merit)

Content preview

PJM Generation Test Q UPDATED
ACTUAL Exam Questions and CORRECT
Answers
Real time transmission constraints or contingencies may be alleviated with generators operating


A. below 60 Hz
B. on a new price curve
C. on a new cost curve

D. off cost (out of merit) - CORRECT ANSWER D. off cost (out of merit)


What is the minimum size for a solar park to be required to have real and reactive power
telemetry ?


A. 1 MW
B. 3 MW
C. 5 MW

D. 7 MW - CORRECT ANSWER B. 3 MW


PJM calls for which of the following to recover the ACE so that tie line schedules are maintained
?


A. instantaneous reserve check
B. synchronized reserves
C. supplemental status report

D. minimum generation calculation - CORRECT ANSWER B. synchronized reserves


If not cancelled by PJM , the minimum generation alert expires

, A. at the end of the specified light load period
B. when notified by NERC
C. 12 hours after the alert was issued

D. after a 24hour period - CORRECT ANSWER A. at the end of the specified light load
period


When PJM declares a hot weather alert , the generation dispatcher should


A. determine if maintenance can be deferred
B. notify transmission operators
C. direct all generating stations to increase MW output

D. direct all generating stations to reduce MVAR output . - CORRECT ANSWER A.
determine if maintenance can be deferred


During system restoration , the two categories of reserves are


A. dynamic and secondary
B. spinning and quick start
C. dynamic and spinning

D. spinning and primary - CORRECT ANSWER C. dynamic and spinning


During system restoration , frequency should be maintained between


A. 59.50 and 60.00 Hz
B. 59.75 and 61.50 Hz
C. 59.75 and 61.00 Hz

D. 59.50 and 60.50 Hz . - CORRECT ANSWER C. 59.75 and 61.00 Hz

Document information

Uploaded on
September 7, 2025
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES
4.0
(235)
Sold
1538
Followers
108
Items
110360
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions