Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

PJM Generation Dispatcher Exam UPDATED ACTUAL Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 2 out of 7 pages

PJM Generation Dispatcher Exam UPDATED ACTUAL Exam Questions and CORRECT Answers Real time transmission constraints may be alleviated with generators operating - CORRECT ANSWER Off Cost (out of merit) What is the minimum size for a solar park to be required to have a real and reactive power telemetry? - CORRECT ANSWER 3MW PJM calls for which of the following to recover ACE so that tie line schedules are maintained? - CORRECT ANSWER Synchronized Reserves

Content preview

PJM Generation Dispatcher Exam
UPDATED ACTUAL Exam Questions and
CORRECT Answers
Real time transmission constraints may be alleviated with generators operating - CORRECT
ANSWER Off Cost (out of merit)


What is the minimum size for a solar park to be required to have a real and reactive power
telemetry? - CORRECT ANSWER 3MW


PJM calls for which of the following to recover ACE so that tie line schedules are maintained? -
CORRECT ANSWER Synchronized Reserves



The minimum generation alert expires when? - CORRECT ANSWER It's cancelled by
PJM


When PJM declares a hot weather alert, the generation dispatcher should. - CORRECT
ANSWER Determine if maintenance can be deferred


During system restoration, the two categories of reserves are - CORRECT
ANSWER Dynamic and Synchronous


During system restoration, frequency should be maintained between - CORRECT
ANSWER 59.75 and 61.00Hz


PJM issues a heavy load voltage schedule. Member companies who own generation should: -
CORRECT ANSWER Ensure voltage regulators on generating units are in service on
automatic


A unit being dispatched economically be PJM should set its MW output based on the -
CORRECT ANSWER Unit's dispatch rate or desired MW level

, What hourly revenue data is required if a generator by PJM? - CORRECT
ANSWER Compensated MWh delivered by each unit


During system restoration prior to synchronization of a unit, the dispatcher should ensure
sufficient load is available to - CORRECT ANSWER Stabilize unit operation



A non-Zero ACE indicates: - CORRECT ANSWER An imbalance of generation and load


During certain emergency conditions, a Capacity Performance generation resource that fails to
generate the required amount of energy may be charged: - CORRECT ANSWER A non-
performance assessment charge


Control center facilities must have a minimum of how many days of fuel for the backup
generator? - CORRECT ANSWER 3 days


Which of the following one-way communication system is used to disseminate information to
market operation centers? - CORRECT ANSWER All call


Real time bus prices may be monitored using A. Data Viewer. B. eDART. C. InSchedule. D.
Markets Gateway. - CORRECT ANSWER Data Viewer


Which action is a violation of PJM two settlement market rules? - CORRECT
ANSWER Not offering an available PJM capacity resource into the day ahead market


A unit fails to start when scheduled, would be classified as which of the following types of
outage? - CORRECT ANSWER Unplanned


A forecasted planned outage starts a minimum of how many days into the future? - CORRECT
ANSWER 31 days

Document information

Uploaded on
September 7, 2025
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES
4.0
(235)
Sold
1538
Followers
108
Items
110360
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions