PJM Review UPDATED ACTUAL Exam Questions and CORRECT Answers There are only two categories of reserves that are essential and therefore need to be tracked during system restoration. - CORRECT ANSWER Dynamic Reserve and Synchronous Reserve This _______________ Reserve may be either on-line generation that can be loaded within 10 minutes or load that can be shed manually within 10 minutes. - CORRECT ANSWER Synchronous Reserve

Content preview

PJM Review UPDATED ACTUAL Exam
Questions and CORRECT Answers
There are only two categories of reserves that are essential and therefore need to be tracked
during system restoration. - CORRECT ANSWER Dynamic Reserve and Synchronous
Reserve


This _______________ Reserve may be either on-line generation that can be loaded within 10
minutes or load that can be shed manually within 10 minutes. - CORRECT
ANSWER Synchronous Reserve


__________________ Reserve is the amount of reserve that is available in order to preserve the
system during a frequency disturbance. Therefore, the amount of ___________ Reserve should
be enough to allow the system to survive the loss of the largest energy contingency. - CORRECT
ANSWER Dynamic Reserve


The amount of Dynamic Reserve needed can be determined by analysis of generator "load pick-
up factors" for units paralleled to the system. The load pick up factors are ____ % steam, ___ %
for hydro and ___ % for CT's. - CORRECT ANSWER 5% for fossil steam
15% for hydro
25% for combustion turbines


Transmission path from a Black Start unit to another generator with the intent to facilitate startup
of that generator to aid in the restoration process. - CORRECT ANSWER Cranking Path


Generation Owners must notify PJM and Transmission Owners if a critical black start fuel
resource at maximum stated output falls below _______ hours. - CORRECT ANSWER 10
hours


Synchronized Reserves are supplied from ___________ minute synchronized generating
resources (i.e., Spinning Reserves) and _________ minute demand-side response resources. -
CORRECT ANSWER 10 Minutes

, issued one or more days in advance of the operating day. General in nature and for elevated
awareness only. No preparations required. - CORRECT ANSWER Advisory


issued one or more days in advance of the operating day for elevated awareness and to give time
for advanced preparations. - CORRECT ANSWER Alerts


issued real-time, typically preceding, and with an estimated time/window for a potential future
action. - CORRECT ANSWER Warnings


issued real-time and requires PJM and/or Member response - CORRECT
ANSWER Actions


The purpose of the _________________________ is to increase the PJM RTO generation above
the maximum economic level. It is implemented whenever generation is needed that is greater
than the highest incremental cost. - CORRECT ANSWER Maximum Emergency
Generation


A ________________ is implemented when the PJM RTO cannot provide adequate capacity to
meet the PJM RTO's load or critically overloaded transmission lines - CORRECT
ANSWER Manual Load Dump


Oil, coal or gas-fired steam units are removed from dispatch to Maximum Emergency when their
fuel inventory is less than _____________ hours. The concept is that _____________ hours at
rated output equals two 16-hour periods over a two-day period. - CORRECT ANSWER 32
Hours


Gas fired CTs with less than 8 hours of fuel should be reported as ________________
Generation (8 hours is equal to two 4-hour peak load periods for a resource with daily
restrictions). - CORRECT ANSWER Maximum Emergency

Document information

Uploaded on
September 7, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES
4.0
(235)
Sold
1538
Followers
108
Items
110360
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions