PJM Review UPDATED ACTUAL Exam Questions and CORRECT Answers There are only two categories of reserves that are essential and therefore need to be tracked during system restoration. - CORRECT ANSWER Dynamic Reserve and Synchronous Reserve This _______________ Reserve may be either on-line generation that can be loaded within 10 minutes or load that can be shed manually within 10 minutes. - CORRECT ANSWER Synchronous Reserve

Meer zien Lees minder
Instelling
Pjm
Vak
Pjm









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Pjm
Vak
Pjm

Documentinformatie

Geüpload op
7 september 2025
Aantal pagina's
8
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Voorbeeld van de inhoud

PJM Review UPDATED ACTUAL Exam
Questions and CORRECT Answers
There are only two categories of reserves that are essential and therefore need to be tracked
during system restoration. - CORRECT ANSWER Dynamic Reserve and Synchronous
Reserve


This _______________ Reserve may be either on-line generation that can be loaded within 10
minutes or load that can be shed manually within 10 minutes. - CORRECT
ANSWER Synchronous Reserve


__________________ Reserve is the amount of reserve that is available in order to preserve the
system during a frequency disturbance. Therefore, the amount of ___________ Reserve should
be enough to allow the system to survive the loss of the largest energy contingency. - CORRECT
ANSWER Dynamic Reserve


The amount of Dynamic Reserve needed can be determined by analysis of generator "load pick-
up factors" for units paralleled to the system. The load pick up factors are ____ % steam, ___ %
for hydro and ___ % for CT's. - CORRECT ANSWER 5% for fossil steam
15% for hydro
25% for combustion turbines


Transmission path from a Black Start unit to another generator with the intent to facilitate startup
of that generator to aid in the restoration process. - CORRECT ANSWER Cranking Path


Generation Owners must notify PJM and Transmission Owners if a critical black start fuel
resource at maximum stated output falls below _______ hours. - CORRECT ANSWER 10
hours


Synchronized Reserves are supplied from ___________ minute synchronized generating
resources (i.e., Spinning Reserves) and _________ minute demand-side response resources. -
CORRECT ANSWER 10 Minutes

, issued one or more days in advance of the operating day. General in nature and for elevated
awareness only. No preparations required. - CORRECT ANSWER Advisory


issued one or more days in advance of the operating day for elevated awareness and to give time
for advanced preparations. - CORRECT ANSWER Alerts


issued real-time, typically preceding, and with an estimated time/window for a potential future
action. - CORRECT ANSWER Warnings


issued real-time and requires PJM and/or Member response - CORRECT
ANSWER Actions


The purpose of the _________________________ is to increase the PJM RTO generation above
the maximum economic level. It is implemented whenever generation is needed that is greater
than the highest incremental cost. - CORRECT ANSWER Maximum Emergency
Generation


A ________________ is implemented when the PJM RTO cannot provide adequate capacity to
meet the PJM RTO's load or critically overloaded transmission lines - CORRECT
ANSWER Manual Load Dump


Oil, coal or gas-fired steam units are removed from dispatch to Maximum Emergency when their
fuel inventory is less than _____________ hours. The concept is that _____________ hours at
rated output equals two 16-hour periods over a two-day period. - CORRECT ANSWER 32
Hours


Gas fired CTs with less than 8 hours of fuel should be reported as ________________
Generation (8 hours is equal to two 4-hour peak load periods for a resource with daily
restrictions). - CORRECT ANSWER Maximum Emergency

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
MGRADES Stanford University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1053
Lid sinds
1 jaar
Aantal volgers
100
Documenten
68976
Laatst verkocht
2 uur geleden
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

166 beoordelingen

5
72
4
30
3
42
2
8
1
14

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen