AZ ADVANCEMENT TEST E4-E7
SOLVED 100% CORRECT
A ____ deficiency defect is likely to result in hazardous or unsafe conditions for
individuals using or maintaining it? - ANSWER-Critical
A ______ deficiency defect is likely to result in the failure or reduced material utility of a
unit or product - ANSWER-MAJOR
A component received missing SRC/ASR/MSR, or AESR shall be considered what? -
ANSWER-NRFI
A FAD II activity can submit what priority requisitions? - ANSWER-2, 5, 12
A FAD III activity can submit what priority requisitions - ANSWER-3, 6, 13
a KIN is a unique____ character number - ANSWER-15
A minimum of how many years data will be maintained at all times on the Conditional
Inspection page? - ANSWER-2 years
a notice usually remains in effect for less than how many months? - ANSWER-6 months
A____ Deficiency defect is not likely to materially reduce the utility of a unit or product? -
ANSWER-MINOR
A/C status code AJ0 - ANSWER-Developmental test and evaluation
AADB summary shall be saved in what format? - ANSWER-PDF, old format XPS
ACC metrics shall include aircraft in NMC status for over how many days, and casual
factors? - ANSWER-30 days
ACC metrics shall include the top how many parts or systems causing NMC status and
PMC status? - ANSWER-25
ACC's have authority to approve TD removal via message however ______ must be in
the info addressee? - ANSWER-comnavairsyscom APML
Acceptance inspection and transfer inspection on uninstalled equipment is what? -
ANSWER-Not required
access to TMAPS Elms is achieved through? - ANSWER-NATEC website
,activities SA will add CDI stamp number to what? - ANSWER-Front of CDI's rate ex:
301AM2
ADRL's are submitted when? - ANSWER-Annually to natec or when requirements
change. when your activities library has more than 30 manuals.
AESR Aeronautical equipment service record form # - ANSWER-OPNAV 4790/29
AFB - ANSWER-74
AFC - ANSWER-50
AFM FUNDS shall not finance what? - ANSWER-Office supplies etc
after a manual is posted to natec it may take how many days for the paper version to be
delivered. - ANSWER-60 days
AI authority must not be granted to who? - ANSWER-supervisors or individuals
responsible for managing the production effort.
AIR shortages that persist for how many days before transfer without proper justification
will be forwarded to comnavairsyscom for resolution? - ANSWER-90 days
Aircraft can't be moved in the hanger until the flashpoint is certified above what degree?
- ANSWER-120 degrees Fahrenheit
Aircraft Inventory record - ANSWER-OPNAV 4790/110
Aircraft inventory record certification and record of transfers form # - ANSWER-opnav
4790/104
Aircraft inventory record equipment list form # - ANSWER-OPNAV 4790/111
Aircraft inventory record shortages form # - ANSWER-OPNAV 4790/112
Aircraft that fail ASPA must be inducted for PDM NLT? - ANSWER-90 days after current
PED
Aircraft undergoing D-level rework/ mod shall remain in who's reporting custody? -
ANSWER-Operating Activity (through the entire evolution regardless of location.)
Aircraft without specific T/M/S operational system check MRC's will have aircraft
systems excessed every what? - ANSWER-28 days ( + or - 3 days)
All defective material will be wrapped in what? - ANSWER-Bubble wrap PPP-C-795
, all ETR's must be submitted by when? - ANSWER-no later than midnight local time, on
the 1st working day following the status change.
all grounding td's/ bulletins shall be coordinated with who prior to official release? -
ANSWER-ACC/ TYCOMS
All Nalcomis OOMA operating activities are not to use what to manage and report
ALSS? - ANSWER-Trace life support modules, SEATS
All non RFI FLR's with what SM&R code will be processed through the supporting
AMSU for Disposition? - ANSWER-PAOOO
All people assigned to logs and records shall complete what course? - ANSWER-
Configuration Management for O and I level ( C-555-0059)
all persons have in their possession what valid form for specific equipment being
returned? - ANSWER-SE license opnav 4790/102
all repairable se components beyond ima repair capability shall be shipped within what
time frame? - ANSWER-24 hours
All RFI tires being transferred off station shall not exceed ___ pounds pig of pressure? -
ANSWER-25 pounds
All SE will be equipped with _____ Filtration? - ANSWER-3 micron (absolute)
ALSS parachute record form # - ANSWER-OPNAV 4790/101
an IRAC can only be corrected by what? - ANSWER-issuance of another IRAC.
are pen & ink changes to correspondence allowed? - ANSWER-NO
ASPA - ANSWER-Aircraft service period adjustment. ( evaluation/ conditional
maintenance actions which are depot level evaluations of aircraft general material
condition.
ASPA deferral inspection must be performed within the window of? - ANSWER-6
months prior to PED
ASR assembly service record form # - ANSWER-OPNAV 4790/106A
assigned to formal change TD's - ANSWER-record purpose
AT A MINIMUM OF HOW OFTEN WILL ALL AIRCRAFT COMPASSES BE
CALIBRATED? - ANSWER-YEARLY
SOLVED 100% CORRECT
A ____ deficiency defect is likely to result in hazardous or unsafe conditions for
individuals using or maintaining it? - ANSWER-Critical
A ______ deficiency defect is likely to result in the failure or reduced material utility of a
unit or product - ANSWER-MAJOR
A component received missing SRC/ASR/MSR, or AESR shall be considered what? -
ANSWER-NRFI
A FAD II activity can submit what priority requisitions? - ANSWER-2, 5, 12
A FAD III activity can submit what priority requisitions - ANSWER-3, 6, 13
a KIN is a unique____ character number - ANSWER-15
A minimum of how many years data will be maintained at all times on the Conditional
Inspection page? - ANSWER-2 years
a notice usually remains in effect for less than how many months? - ANSWER-6 months
A____ Deficiency defect is not likely to materially reduce the utility of a unit or product? -
ANSWER-MINOR
A/C status code AJ0 - ANSWER-Developmental test and evaluation
AADB summary shall be saved in what format? - ANSWER-PDF, old format XPS
ACC metrics shall include aircraft in NMC status for over how many days, and casual
factors? - ANSWER-30 days
ACC metrics shall include the top how many parts or systems causing NMC status and
PMC status? - ANSWER-25
ACC's have authority to approve TD removal via message however ______ must be in
the info addressee? - ANSWER-comnavairsyscom APML
Acceptance inspection and transfer inspection on uninstalled equipment is what? -
ANSWER-Not required
access to TMAPS Elms is achieved through? - ANSWER-NATEC website
,activities SA will add CDI stamp number to what? - ANSWER-Front of CDI's rate ex:
301AM2
ADRL's are submitted when? - ANSWER-Annually to natec or when requirements
change. when your activities library has more than 30 manuals.
AESR Aeronautical equipment service record form # - ANSWER-OPNAV 4790/29
AFB - ANSWER-74
AFC - ANSWER-50
AFM FUNDS shall not finance what? - ANSWER-Office supplies etc
after a manual is posted to natec it may take how many days for the paper version to be
delivered. - ANSWER-60 days
AI authority must not be granted to who? - ANSWER-supervisors or individuals
responsible for managing the production effort.
AIR shortages that persist for how many days before transfer without proper justification
will be forwarded to comnavairsyscom for resolution? - ANSWER-90 days
Aircraft can't be moved in the hanger until the flashpoint is certified above what degree?
- ANSWER-120 degrees Fahrenheit
Aircraft Inventory record - ANSWER-OPNAV 4790/110
Aircraft inventory record certification and record of transfers form # - ANSWER-opnav
4790/104
Aircraft inventory record equipment list form # - ANSWER-OPNAV 4790/111
Aircraft inventory record shortages form # - ANSWER-OPNAV 4790/112
Aircraft that fail ASPA must be inducted for PDM NLT? - ANSWER-90 days after current
PED
Aircraft undergoing D-level rework/ mod shall remain in who's reporting custody? -
ANSWER-Operating Activity (through the entire evolution regardless of location.)
Aircraft without specific T/M/S operational system check MRC's will have aircraft
systems excessed every what? - ANSWER-28 days ( + or - 3 days)
All defective material will be wrapped in what? - ANSWER-Bubble wrap PPP-C-795
, all ETR's must be submitted by when? - ANSWER-no later than midnight local time, on
the 1st working day following the status change.
all grounding td's/ bulletins shall be coordinated with who prior to official release? -
ANSWER-ACC/ TYCOMS
All Nalcomis OOMA operating activities are not to use what to manage and report
ALSS? - ANSWER-Trace life support modules, SEATS
All non RFI FLR's with what SM&R code will be processed through the supporting
AMSU for Disposition? - ANSWER-PAOOO
All people assigned to logs and records shall complete what course? - ANSWER-
Configuration Management for O and I level ( C-555-0059)
all persons have in their possession what valid form for specific equipment being
returned? - ANSWER-SE license opnav 4790/102
all repairable se components beyond ima repair capability shall be shipped within what
time frame? - ANSWER-24 hours
All RFI tires being transferred off station shall not exceed ___ pounds pig of pressure? -
ANSWER-25 pounds
All SE will be equipped with _____ Filtration? - ANSWER-3 micron (absolute)
ALSS parachute record form # - ANSWER-OPNAV 4790/101
an IRAC can only be corrected by what? - ANSWER-issuance of another IRAC.
are pen & ink changes to correspondence allowed? - ANSWER-NO
ASPA - ANSWER-Aircraft service period adjustment. ( evaluation/ conditional
maintenance actions which are depot level evaluations of aircraft general material
condition.
ASPA deferral inspection must be performed within the window of? - ANSWER-6
months prior to PED
ASR assembly service record form # - ANSWER-OPNAV 4790/106A
assigned to formal change TD's - ANSWER-record purpose
AT A MINIMUM OF HOW OFTEN WILL ALL AIRCRAFT COMPASSES BE
CALIBRATED? - ANSWER-YEARLY