RWP PG Exam Questions And Answers For A+
Score!!!
1. type of working limits on
foul time, exclusive track occupancy
controlled track
2. type of working limits on
inaccessible track
non-con- trolled track
3. type of train approach warning watchman
4. type of train approach warning individual train detection
5. What type of work roadway inspection and construction of track,
workers do? maintenance of bridges, repair of signal
and communication systems, repair of
RMM
6. True or false. Fouling a track can
apply to both people and True
machinery
7. Within what distance to the track 4 feet from the nearest running rail
is a roadway worker considered
fouling it?
Operator/Dispatcher
8. a what authorizes movements on
con- trolled track.
All tracks
9. The RWIC is required to be
qualified on physical
characteristics when their group
is working on....
10. The EIC is an employee who is in charge A work group
of....
11. The main role of the RWIC is.... To establish on track safety
1/
13
, RWP PG Exam Questions And Answers For A+
Score!!!
12. When can personal electronic If there is an emergency at the job site and
devices be used while on duty? no other forms of communication are
available
2/
13
Score!!!
1. type of working limits on
foul time, exclusive track occupancy
controlled track
2. type of working limits on
inaccessible track
non-con- trolled track
3. type of train approach warning watchman
4. type of train approach warning individual train detection
5. What type of work roadway inspection and construction of track,
workers do? maintenance of bridges, repair of signal
and communication systems, repair of
RMM
6. True or false. Fouling a track can
apply to both people and True
machinery
7. Within what distance to the track 4 feet from the nearest running rail
is a roadway worker considered
fouling it?
Operator/Dispatcher
8. a what authorizes movements on
con- trolled track.
All tracks
9. The RWIC is required to be
qualified on physical
characteristics when their group
is working on....
10. The EIC is an employee who is in charge A work group
of....
11. The main role of the RWIC is.... To establish on track safety
1/
13
, RWP PG Exam Questions And Answers For A+
Score!!!
12. When can personal electronic If there is an emergency at the job site and
devices be used while on duty? no other forms of communication are
available
2/
13