• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 26 pages
Exam (elaborations)

CEPSCI Certification Exam| Questions and Answers, 100% Correct| Latest

Document preview thumbnail
Preview 3 out of 26 pages

CEPSCI Certification Exam| Questions and Answers, 100% Correct| Latest Why erosion prevention and sediment control are important? 1. Stormwater runoff is leading cause of impaired water in SC. 2. Protect downstream surface water and aquatic habitats Erosion Process by which land surface is worn away by action of water, wind, ice and gravity. Natural erosion aka Geologic erosion. 1. relative slow 2. most rapid along shorelines and stream channels 3. produces about 30% of eroded sediment in US Accelerated erosion 1. erosion at elevated rate bc of human activity 2. agriculture, timber harvesting and construction are primary contributors 3. accounts for remaining 70% of eroded sediment in US Factors influencing erosion 1. climate (frequency, intensity and duration of rainfall for a region) 2. season (more intense storms in summer) 3. vegetative cover 4. topography 5. soil characteristics (texture, percentage of organic content, structure, and permeability) Sedimentation Process by which eroded material is transported and deposited. Negative impacts of sedimentation 1. screens out sunlight/reduces water clarity. 2. fills channels and reduces capacity. 3. pollutants attached to sediment particles can impact downstream water quality. NPDES aka National Pollutant Discharge Elimination System. Created by the 1972 Clean Water Act. 1987 Amendment to CWA called Water Quality Act required EPA to develop program to regulate storm discharges under NPDES program. Point source pollution Discharges from readily identifiable sources such as wastewater treatment plants or industrial facilities. Nonpoint source pollution Discharges that are less easily identifiable such as runoff from urbanized or agricultural areas. DHEC aka Department of Health and Environmental Control. This regulation administers NPDES regulations, but EPA has authority to exert jurisdiction in SC. CGP aka Construction General Permit. One of several NPDES permits administered by


Document information

Uploaded on
September 2, 2025
Number of pages
26
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Thepassword
3.8
(92)
Sold
451
Followers
296
Items
3814
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.