Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

AVIXA CTS SAMPLE QUESTIONS WITH ALL CORRECT & 100% VERIFIED ANSWERS|ACTUAL EXAM|ALREADY GRADED A+

Document preview thumbnail
Preview 2 out of 13 pages

AVIXA CTS SAMPLE QUESTIONS WITH ALL CORRECT & 100% VERIFIED ANSWERS|ACTUAL EXAM|ALREADY GRADED A+

Content preview

AVIXA CTS SAMPLE QUESTIONS WITH ALL CORRECT &
100% VERIFIED ANSWERS|ACTUAL EXAM|ALREADY
GRADED A+

What is the BEST way to determine how reverberant a space is?
-Clap your hands and listen for an echo
-Ask the client if anyone has complained that the room is too noisy
-Use an RT60 meter
-Use a DB SPL meter ✔Correct answer-Use an RT60 meter

The correct time to discuss visible finishes for wall plates, surface mount speakers, and wall mounted
screen casings is during the:
-Ordering
-Installation
-Site survey
-Contract award ✔Correct answer-Site survey

While surveying a conference room for a system upgrade, an engineer measures 55 dB SPL A-wtd of
ambient noise when the room is empty. How should they proceed? -Add voice lift to the system
proposal
-Add more loudspeakers to the system proposal
-Speak with the client about getting more information on how to address the noise source
-Do nothing, this level of ambient noise is well within system tolerance ✔Correct answer-Speak
with the client about getting more information on how to address the noise source

A client needs to add videoconferencing functionality for high-level, private meetings. Which of
following planned space types should you advise be ruled out?
-Divisible room
-Boardroom
-Conference room -Classroom ✔Correct answer-Divisible room

Which phase of an AV project comes immediately AFTER the Program Phase? -The Design Phase
-Project Planning and Coordination Phase
-The Verification Phase
-The Documentation Phase ✔Correct answer-The Design Phase

Which is NOT presented in the program report: -Executive Summary -Detailed list of equipment -
Budgets
-Infrastructure Considerations ✔Correct answer-Detailed list of equipment

When preparing an executive summary what should be included for submittal to the client?
-A deep dive, including full technical specficiation, of all equipment to be used in the design.
-An estimation of how many change orders might be required if the client doesn't use your design.
-References to new and emerging technologies that should be considered for future spaces.
-An overview of the programming process including who was surveyed during the process.
✔Correct answer-An overview of the programming process including who was surveyed during the
process.

, Which system is used to show colors from a video display?
-Additive color system -Subtractive color system -Plus/minus color system -Recover color system
✔Correct answer-Additive color system

An installed audio system should be AT LEAST __________ above the ambient noise floor.
-5 dB
-25 dB
-45 dB
-75 dB ✔Correct answer-25 db

A device is controlled using the pictured cable. What is the MOST LIKELY method of controlling this
device?
-IR
-RF
-RS-232
-Network ✔Correct answer-RS-232

The minimum load safety rating for mounting audio visual equipment is:
-3:1
-5:1
-8:1
-10:1 ✔Correct answer-5:1

As part of regular system maintenance, when is the BEST time to update device firmware?
-On Friday afternoons.
-As soon as updates are available.
-Device firmware should never be updated after system sign-off.
-After coordination with the client, and when the system will be available for an extended period of
time ✔Correct answer-On Friday afternoons.

The brightness controls on a display adjusts which level?
-Black Level
-Chroma Level
-Hue
-White Level ✔Correct answer-Black Level

When verifying a display system, which of the following should be used to determine if it meets a
specified contrast ratio?
-Multi-meter
-Histogram
-Lux Capacitor
-Spot Photometer ✔Correct answer-Spot Photometer

When working with a client to design an AV solution for a new conference center, the client requests
a detailed budget for the equipment and installation. In what phase does this occur?
-Design phase
-Program phase
-Bidding phase
-Installation phase ✔Correct answer-Design phase

Document information

Uploaded on
August 28, 2025
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$20.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyclub
3.6
(14)
Sold
67
Followers
1
Items
13044
Last sold
21 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions