1 of 33
Definition
Means Pressure is too high.
take off grey top and hit reset (blue button)
Get the blower to cool the compressor
Give this one a try later!
Where does the oil water separator
School bell on CO2 storage
discharge to?
, HRSG HP drum level hi-hi on the HRSG HP, IP, LP bottom blowdown
DCS will trip what? drains to something
Don't know?
2 of 33
Term
HRSG HP, IP, LP bottom blowdown drains to something
Give this one a try later!
Drain Header Breaker
Drain Turbine Exhaust Plenum None Of The Above
Don't know?
3 of 33
Term
What is the maximum allowable conductivity of the Mixed Bed?
Give this one a try later!
0.5 micromhos 1 micromhos
, 5 micromhos 3 micromhos
Don't know?
4 of 33
Term
HRSG HP, IP, LP steam lines should always be drained of water
before startup?
Give this one a try later!
95% True
Breaker Drain Header
Don't know?
5 of 33
Term
Gas turbine CO2 pressure is maintained at what pressure?
Give this one a try later!
above 400 psi above 300 psi
QUESTIONS WITH 100% CORRECT
ANSWERS!!
1 of 33
Definition
Means Pressure is too high.
take off grey top and hit reset (blue button)
Get the blower to cool the compressor
Give this one a try later!
Where does the oil water separator
School bell on CO2 storage
discharge to?
, HRSG HP drum level hi-hi on the HRSG HP, IP, LP bottom blowdown
DCS will trip what? drains to something
Don't know?
2 of 33
Term
HRSG HP, IP, LP bottom blowdown drains to something
Give this one a try later!
Drain Header Breaker
Drain Turbine Exhaust Plenum None Of The Above
Don't know?
3 of 33
Term
What is the maximum allowable conductivity of the Mixed Bed?
Give this one a try later!
0.5 micromhos 1 micromhos
, 5 micromhos 3 micromhos
Don't know?
4 of 33
Term
HRSG HP, IP, LP steam lines should always be drained of water
before startup?
Give this one a try later!
95% True
Breaker Drain Header
Don't know?
5 of 33
Term
Gas turbine CO2 pressure is maintained at what pressure?
Give this one a try later!
above 400 psi above 300 psi