Base Course - ANSWERSLayer or layers of specified material of designated thickness or rate of application based on a subbase or subgrade to support the subsequent layers Bridge - ANSWERSOver a depression; longer than 20' The subgrade is the top _______ of roadbed upon which the pavement structure and shoulders are constructed - ANSWERS18" Do not use glass in the top _____ of the embankment - ANSWERS18" Clear and grub minimum of ____ from each edge of proposed pavement along both lanes and legs of interchange - ANSWERS30' Where clearing and grubbing within the roadway is indicated at a bridge site, clear by cutting all trees, stumps, etc. to within ______ of the ground or to low water in the full width of the ROW for a distance of 75' beyond the beginning and end of the proposed bridge - ANSWERS8" Compact the subgrade between the lines ____ inches outside the area occupied by the pavement structure, including C&G & SW to not less than 95% of max density - ANSWERS18" Pulverize base course material so that the completion of the moist mixing 100% (by dry weight) passes the 1.5" sieve and a minimum of _____ passes the #4 sieve, exclusive of gravel and stone retained on the sieve - ANSWERS80% #4 sieve - ANSWERS4.75 mm Ensure finished surface of base varies neither than 3/8" from a straight edge 10' long when applied parallel to the CL of the rd, no more than ______ inch from the typical cross-section on the plans - ANSWERS1/2" Thickness of completed modified base is measured at staggered intervals not to exceed _____ feet in length for two-lane roads - ANSWERS250' Use _______ in all base courses as an anti-stripping additive - ANSWERShydrated lime Where plans required uniform thickness of base course and the contract provides for pavement on sq yd bases, thickness of base course is determined from measurements taken of the completed base course at intervals not exceeding _____ feet for two-lane roads - ANSWERS500' For HMA, use aggregates with a combined specific gravity of _____ or less - ANSWERS2.90 ON HMA use pneumo-rollers that are self propelled and have an effective rolling width of not less than _______ - ANSWERS60" Ensure intermediate rolling of HMA is completed before mat temp drops below _____ - ANSWERS175 degrees First step in applying asphalt surface treatment (single) - ANSWERSClean surface Last step in applying asphalt surface treatment (single) - ANSWERSRemove excess aggregate Spread aggregate for HMA within _____ feet of the application of the emulsion - ANSWERS200' Place asphalt surface treatment (double) within ____ days of the base course being primed - ANSWERS7 When rolling aggregate applications for asphalt surface treatment (double) on each trip of the roller, overlap prior by _____ the width of the roller - ANSWERS1/2 On portland cement pavement, position lower surface of preformed joint filler on or below surface of base while upper surface is _____ inches below surface of the slab - ANSWERS1/2" When using surface vibrators on portland concrete, ensure frequency is not less than ______ impulses per minute - ANSWERS3500 Construct subbase and base beneath concrete pavement to include area _____ inches in width extending beyond edges to provide stability for paver tracks - ANSWERS18" Min. width of any reinforced concrete slab is ______ feet - ANSWERS16' Max. length of any reinforced concrete slab is ______ feet - ANSWERS20' Exclude all vehicle traffic from newly constructed concrete pavement for a period of not less than ______ days - ANSWERS14 Finish joints should not deviate more than ____ inch in the horizontal alignment from a straight line - ANSWERS1/4"

Content preview

Asphalt Paving GC Exam Questions
with Accurate Answers

Base Course - ANSWERSLayer or layers of specified material of designated thickness
or rate of application based on a subbase or subgrade to support the subsequent layers

Bridge - ANSWERSOver a depression; longer than 20'

The subgrade is the top _______ of roadbed upon which the pavement structure and
shoulders are constructed - ANSWERS18"

Do not use glass in the top _____ of the embankment - ANSWERS18"

Clear and grub minimum of ____ from each edge of proposed pavement along both
lanes and legs of interchange - ANSWERS30'

Where clearing and grubbing within the roadway is indicated at a bridge site, clear by
cutting all trees, stumps, etc. to within ______ of the ground or to low water in the full
width of the ROW for a distance of 75' beyond the beginning and end of the proposed
bridge - ANSWERS8"

Compact the subgrade between the lines ____ inches outside the area occupied by the
pavement structure, including C&G & SW to not less than 95% of max density -
ANSWERS18"

Pulverize base course material so that the completion of the moist mixing 100% (by dry
weight) passes the 1.5" sieve and a minimum of _____ passes the #4 sieve, exclusive
of gravel and stone retained on the sieve - ANSWERS80%

#4 sieve - ANSWERS4.75 mm

Ensure finished surface of base varies neither than 3/8" from a straight edge 10' long
when applied parallel to the CL of the rd, no more than ______ inch from the typical
cross-section on the plans - ANSWERS1/2"

Thickness of completed modified base is measured at staggered intervals not to exceed
_____ feet in length for two-lane roads - ANSWERS250'

Use _______ in all base courses as an anti-stripping additive - ANSWERShydrated lime

Where plans required uniform thickness of base course and the contract provides for
pavement on sq yd bases, thickness of base course is determined from measurements

, taken of the completed base course at intervals not exceeding _____ feet for two-lane
roads - ANSWERS500'

For HMA, use aggregates with a combined specific gravity of _____ or less -
ANSWERS2.90

ON HMA use pneumo-rollers that are self propelled and have an effective rolling width
of not less than _______ - ANSWERS60"

Ensure intermediate rolling of HMA is completed before mat temp drops below _____ -
ANSWERS175 degrees

First step in applying asphalt surface treatment (single) - ANSWERSClean surface

Last step in applying asphalt surface treatment (single) - ANSWERSRemove excess
aggregate

Spread aggregate for HMA within _____ feet of the application of the emulsion -
ANSWERS200'

Place asphalt surface treatment (double) within ____ days of the base course being
primed - ANSWERS7

When rolling aggregate applications for asphalt surface treatment (double) on each trip
of the roller, overlap prior by _____ the width of the roller - ANSWERS1/2

On portland cement pavement, position lower surface of preformed joint filler on or
below surface of base while upper surface is _____ inches below surface of the slab -
ANSWERS1/2"

When using surface vibrators on portland concrete, ensure frequency is not less than
______ impulses per minute - ANSWERS3500

Construct subbase and base beneath concrete pavement to include area _____ inches
in width extending beyond edges to provide stability for paver tracks - ANSWERS18"

Min. width of any reinforced concrete slab is ______ feet - ANSWERS16'

Max. length of any reinforced concrete slab is ______ feet - ANSWERS20'

Exclude all vehicle traffic from newly constructed concrete pavement for a period of not
less than ______ days - ANSWERS14

Finish joints should not deviate more than ____ inch in the horizontal alignment from a
straight line - ANSWERS1/4"

Document information

Uploaded on
August 25, 2025
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
4
Followers
0
Items
1470
Last sold
1 month ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions